Technical details
Client
Queensland Department of Education
Dates

Completed 2021

Missions
Construction engineering
Location
Brisbane, QLD, Australia
Activity
Buildings, Education

Stage 2 expanded the campus with a senior learning precinct and new sports facilities. BG&E’s construction engineering scope focused on the sports centre, located immediately adjacent to an active rail corridor.

Engineering a long-span sports structure in a constrained urban environment

The sports centre features a 23-metre concrete floor spanning twin basketball courts. Its proximity to the active rail line required the design to account for potential rail-related impact loads and stringent structural robustness requirements. The entire structure was constructed using precast elements. 

BG&E managed the structural design and developed the erection sequence for the precast components, verifying the stability and performance of the structure at each stage of construction. The team also designed the temporary works required to maintain stability throughout the erection process. 

To help communicate this complex sequence to the construction teams on site, BG&E produced 4D-rendered animations illustrating the different stages of erection and temporary works.

Recognition

Designed by Cox Architecture, with Thomson Adsett delivering the final architectural design, the project received the Australian Institute of Architects Queensland Educational Architecture Award in 2021.

Snapshots from Fortitude Valley State Secondary College