BG&E, now part of SYSTRA, is delivering structural and civil engineering services for the transformation of South Melbourne Town Hall, a heritage building originally constructed in the late 1800s, into a dedicated performing arts and training venue for the Australian National Academy of Music (ANAM).
The wider redevelopment and restoration represents an investment of approximately AU$125 million, with ANAM expected to return to the building in 2028.
Strengthening a heritage structure for performance use
Declared structurally unsafe in 2020, the Town Hall is undergoing extensive strengthening, renovation and refitting to meet the technical demands of a professional performing arts institution.
Structural works include demolition and reconstruction of the north-west annex, strengthening of numerous areas to accommodate heavy acoustic treatments, theatre and audiovisual equipment, and upgrades to the Main Hall performance spaces. Additional structural bracing is also being introduced to support new rigging, technical equipment and acoustic reflectors.
A new student common lounge is also incorporated within the works.
A future performing arts venue for THE ACADEMY
Once complete, the redevelopment will provide ANAM with dedicated facilities for professional music performance, education and training. The reimagined Main Hall will accommodate approximately 350 people, complemented by a new 150-seat performance venue and upgraded rehearsal and practice spaces for students.
The project will enable ANAM to return to its long-term home at South Melbourne Town Hall while adapting the heritage building to the technical and functional requirements of a contemporary performing arts institution.