Technical details
Client
SJI International Preschool
Dates

Expected completion 2027

Missions
Structural engineering, Civil engineering, Façade engineering
Location
Singapore
Activity
Buildings, Education

The campus has a long history of early childhood education. Shalom House was home to the original Maris Stella Kindergarten, established by the Franciscan Missionaries of Mary in the early 1950s. Classes occupied the lower floor of the building, while the Sisters lived upstairs. Today, the renewed building forms part of SJI International Preschool, preserving this heritage while adapting the campus to contemporary educational needs.

Phase 1: restoring and adapting Shalom House

Completed in 2024, the first phase involved the refurbishment and extension of Shalom House, including alteration works to conserve the heritage building and the construction of a new two-storey wing. 

Given the age and condition of the existing structure, BG&E developed a mixed-material solution combining steel, concrete, timber and micropiles, tailored to the specific structural characteristics of the original building.

Phase 2: a new preschool facility

The second phase, known as Santo Bambino, is underway and is expected to complete the transformation of the campus in 2027. 

The works involve demolition of the existing single-storey preschool building and construction of a new three-storey facility with a basement. BG&E is providing a full scope of structural, civil and façade engineering services for this phase, including temporary works. 

Together, Shalom House and Santo Bambino will create a campus combining restored heritage architecture with contemporary learning environments for early childhood education.

Snapshots from SJI International Preschool