BG&E, now part of SYSTRA, delivered structural, civil and façade engineering services for the major redevelopment of the performing arts and library facilities at Ruyton Girls School in Kew, seven kilometres east of Melbourne’s CBD.
The project forms part of the Verrocchi Centre, a major new performing arts and library precinct within the school campus, bringing together contemporary learning and performance spaces with existing heritage buildings.
A new performing arts centre integrated within the campus
Designed by Sally Draper Architects and Hayball, the project includes a 640-seat auditorium with the structural and acoustic requirements of a large performance venue, alongside a black box theatre, rehearsal and performing arts studios, production facilities and an upgraded library.
The completed facility supports whole-school assemblies, performances and public events, providing a major new venue for both the school and its wider community.
Engineering at the interface of new and heritage structures
A key technical challenge was the integration of the new development with the adjacent heritage-listed Derham House, a late 19th-century building used for music education.
To accommodate a new lift shaft, the basement structure of the Performing Arts Centre had to extend beneath part of the existing heritage building, without compromising the heritage fabric above.
BG&E’s façade engineering scope also addressed the junction between the new Performing Arts Centre and the existing heritage building, ensuring appropriate performance and weathertightness where the old and new structures meet.