SYSTRA contributing from the earliest project stages
Working with our long-standing local partner, CECI Engineering Consultants, SYSTRA Taiwan supported the delivery of the project’s core systems from design through construction and entry into service.
During the design phase, we helped develop the railway’s technical backbone, including signalling, power supply, platform screen doors, and system integration, while preparing construction tender documents.
During construction, SYSTRA reviewed the detailed design, checking that system designs and maintenance procedures complied with the applicable technical, safety and RAMS (Reliability, Availability, Maintainability and Safety) requirements. The team also supported technical coordination, system validation, and preparations for entry into service.

The opening of the Sanying Line is more than a new metro service — it is a promise of easier journeys, closer communities, and greater opportunity for the people of Tucheng, Sanxia, and Yingge. With the future extension to Bade set to link New Taipei and Taoyuan, SYSTRA looks forward to contributing our expertise to this next stage of Taiwan’s rail development.
Victoria Chen, Managing Director, SYSTRA Taiwan
Reinforcing connections and cutting journey times
The line connects Tucheng, Sanxia and Yingge, three districts of New Taipei City. At Dingpu, in Tucheng, passengers can now transfer to the Bannan Line of the separate Taipei Metro network, providing faster access to Taipei City.
The service is also expected to support urban and economic development across the three districts, while strengthening their connections to the capital.
An international team success
This opening was a shared SYSTRA achievement. Expertise from SYSTRA France, SYSTRA China, and SYSTRA Taiwan, along with the contribution of translation teams in Taiwan and Shanghai, ensured effective cross-border collaboration and smooth handling of multilingual technical documentation.