The project includes advisory services, review, and the preparation of technical documentation and is scheduled to last 18 months.
Our study will cover the rolling stock, signalling system, tracks, catenary, platform facades, ventilation systems, escalators and lifts, and self-service ticketing. All the electrical systems are included in these studies, from access gates to communication and video-surveillance systems, including the real-time energy control and management system (SCADA), as well as RAMS and interface studies.

Confidence in our teams’ experience and expertise has once again been confirmed by our longstanding client Metro S.A. with this latest project for the Santiago Metro. We look forward to successfully completing this assignment, as well as the other ongoing projects in which we are participating on other lines of the network.
Hervé Laurain, Hispanic America Cluster Director, Design & Build and International

SYSTRA and the Santiago Metro: a long and successful collaboration
SYSTRA was involved from the very start of the Santiago Metro network. Since automating line 1, and then lines 3 and 6 between 2017 and 2019, the Group has been awarded several big projects on this network involving teams from SYSTRA Chile and SYSTRA Subterra such as:
- preliminary studies for the northern extension of lines 1, 8 and 9
- the audit for the renewal of the systems on lines 2, 4, 4A and 5
- other recently completed projects include:
- extension of line 3
- systems studies for the extension of line 6
- design studies and construction supervision for line 7, in addition to studies for the rail systems and in-station equipment for line 7