SYSTRA is providing Detailed Design Consulting services to Delhi Metro Rail Corporations Limited – UTO project.
Key features of the project
- Review the System Installation of Rolling Stock, Traction, OHE, Track, Signaling & Telecom, E&M, OCC& BCC, Stations and Depot
- Review the System Function provided in OCC for UTO Operation
- Review the Train operation with respect to UTO Operation
- Review & recommendation on “Standard Operation procedure for normal operation” for UTO in main line and depots
- Review & recommendation on “Standard Operation procedure for abnormal/ emergency operation” for UTO in main line and depots
- Review the Maintenance of complete system in UTO
- Audit of the DMRC’s proposed UTO system with respect to compliance of EN 62267, EN 62290 and its parts and other relevant standard and recommend/suggest implementation to various inconsistencies noticed during audit
- Review of the existing procedures from GOA2 to GOA3 and GOA3 to GOA4
- Recommendations on infrastructure and suggested measure improvement on complete SYSTEMS
Some examples of projects in System
Dhaka Line-6 Project
Bangalore Metro R5 UTO Consultancy Project
DESIGN CONSULTANCY FOR POWER SUPPLY & DISTRIBUTION, 750 V DC THIRD RAIL TRACTION ELECTRIFICATION & SCADA SYSTEM FOR REACH-5 & REACH-6 OF BANGALORE METRO RAIL PROJECT PHASE-II
CONSULTING SERVICES FOR PREPARATION OF TECHNICAL SPECIFICATION & BID MANAGEMENT – IMPLEMENTATION OF CBTC SYSTEM ON MUMBAI SUBURBAN RAILWAY NETWORK