SYSTRA is engaged in design consultancy work for Power Supply & Distribution System, 750 V DC Third Rail Traction Electrification & SCADA system for Reach-5 & Reach-6 of Bangalore Metro Rail Project Phase-II.
Key features of the project
- Simulation Study and report
- EMC/EMI Study and preparation of EMC Management Plan
- Earthing, bonding and Stray Current management
- Preparation of Construct Tender document including technical specification, BOQ & Drawings for the complete Work
- Preparation of Construction Cost Estimate
- SCADA system and integration with existing network of Phase – I
- Preparation of design and drawings for Power Supply, Power distribution, 750 V DC Third Rail Traction Electrification System, Traction feeding diagram, Traction and Auxiliary Network, Preparation of Installation arrangement drawings, Schematic feeding and Sectioning diagrams and other related drawings viz Equipment Layout drawings, Earthing and Bonding drawings, Schematic Protection scheme and other related drawings of work
- Preparation of System requirements, Functional Specifications, Technical Specifications and Data assignment for the SCADA System