Technical details
Client
Hyundai Engineering & Construction Co., Ltd.
Dates

July 2012 – November 2017

Missions
Basic Design, Detail Design
Location
Lusail, Qatar

Lusail Expressway Package 1 – Link Roads to the Pearl Construction of 5,8 km long road comprising of about 16 lanes, some of which reach up to two or three levels, including three major interchanges, as part of 12 km long Lusail Expressway Project.

The Al Wahada Arch is an integral structural arch serving as a support for a visitor centre hanging from it. The visitor center was meant to be accessible only by cable car from the base station. However, the visitor center was cancelled by the client, and Systra made a proposal on the ICE for the detailed design services for the stand-alone Al Wahada Arch. 

SYSTRA was in charge of review and CAT III Certification on Artscape Structures along Lusail Expressway (Al Wahda Arches & Visitor Centre, Base Station, 2 Pedestrian Bridge, 6 Tunnel Eyes, 4 Buildings)

The scope of works was the ICE for the detailed design of the Stand-alone Al Wahada Arch.

The check was as follows:

  • As built foundation structure
  • Structure to be built