The North-South Corridor is new roadway infrastructure aiming at providing faster road travel times from North (Woodlands) to the city by integrating underground expressway, dedicated bus lanes and dedicated cycling path connecting to PCN (Park Connector Network) and HDB town network. The corridor is 21.5km long.
SYSTRA supports the development of the NSC corridor on Contract N105 between Suffolk Rise and Novena Rise to develop:
- Temporary traffic diversion (TTD) schemes (including pedestrian provision and bus stops relocation) and associated Traffic Impact Assessment (TIA) reports, as well as post TTD schemes implementation inspection and reporting
- Provision of responses to Safety Division, Project Safety Review (Roads) and Traffic Management Division and Design Development (Roads).