Under the Amanos: triple tunnel passage for road and rail across the mountains
Passing Amanos Mountain to connect Dörtyol and Hassa with Railway and Highway. The project is 25 km long including 20 km triple tube tunnels and several bridges.
main features
- 20 km of triple tunnels
- 2 highway tunnels
- 1 railway tunnel
- Excavation method both NATM & TBM
- Longest tunnels in Türkiye

Some examples of projects in Railways, Tunnels, Design