Expanding İzmir’s Metro: complex TBM delivery to Narlıdere
Detail Design of 4,7 km of double tube single track TBM tunnel. External diameter of TBM tunnel is 6,30 m and consists of 6 segments (5+1 keystone).
Detail Design of conventional tunnels along the alignment.
Detail Design of stations which are excavated by conventional method (Balçova Station, Çağdaş Station, Dokuz Eylül Üniversitesi Station, Güzel Sanatlar Station, Narlıdere Station, Şehitlik Station, Kaymakamlık Station).
Detail Design of connection zones of Tunnels (Reduction Tunnels).
Risk analysis along the alignment and stations.
Settlement analysis.
Preparation of monitoring projects.
Key Figures
- 7.2 km Light Rail Metro Line, Double Tube TBM (EPB)
- 7 Stations (5 with NATM tunnels, 2 cut&cover)
- 9 Shafts
- 2 Connection Lines