Urban Mobility Innovation: massive double-tube highway tunnel in Istanbul
The project connects Kilyos and Sarıyer districts with 7,75 km long alignment that has 1,75 km of connection roads. It includes 7 km long double tube tunnel.
Key Figures
- Second Largest TBM Tunnel in Türkiye with an excavation diameter of 13,75 m.
- Cavern tunnels that will be used to assembly TBM with 665 m2 of tunnel face and 75 m long.
- 13 bypasses, 4 cut&cover structures, 500 m long adit tunnel.
- 100 m long viaduct.
Some examples of projects in Tunnels, Design