Modernization of existing line
This project covered the study, design, and engineering works for the 34 km Line 2 between Arifiye and Pamukova stations. The scope included preparation of final designs and tender documentation for construction, mapping, EIA reporting, and expropriation plans. Detailed final designs were completed for 8 bridges, 8 overpasses, 33 joints, 4 vehicle underpasses, 2 pedestrian underpasses, and 1 cut-and-cover tunnel.
Key Figures
- 34 km long
- 160 km/h design speed
- 8 viaducts
- 8 overpasses
- 1 cut&cover
- 4 underpasses
- 2 underpasses
- 33 culverts
Some examples of projects in Railways, Design