Technical details
Client
Rambøll
Dates
2020 – ongoing
Missions
Preliminary design, Detailed design, Final design
Location
Denmark
Perimeter
Infrastructure, Geology/Hydrogeology, Hydraulics, Hydrology, Roads and utility services, Structural works, SYSTEMS (CORE SYSTEMS), Track Road/tram track, Sustainable development, Environmental, Landscape design

Storstrøm bridge will be 3,8km long, with embankments length of 4,5km and a height of the pylons of 100m. Train design speed will be 200 km/h while the vehicle design speed is 80km/h.

In 2022 it is expected the opening to car traffic, while the following year the bridge will also be crossed by trains. In the same year, the demolition of the old Storstrøm Bridge will take place.