Spanning 13 km, this metro line M12 links the north and south of Istanbul’s Asian side with 11 underground stations, a dedicated stabling area, and integration with the M8 line. The project utilizes advanced systems engineering and the Go4 System to support rapid transit across the city.

main features

  • Line length = 13 km
  • Stabling underground (6 tracks)
  • Transfer track with line M8
  • 11 Underground Stations
  • Go4 System