Connecting Istanbul’s Asian Side
Spanning 13 km, this metro line M12 links the north and south of Istanbul’s Asian side with 11 underground stations, a dedicated stabling area, and integration with the M8 line. The project utilizes advanced systems engineering and the Go4 System to support rapid transit across the city.
main features
- Line length = 13 km
- Stabling underground (6 tracks)
- Transfer track with line M8
- 11 Underground Stations
- Go4 System
Some examples of projects in Metros, System Egineering