Technical details
Client
IC İçtaş / KGM
Dates

2022 – Ongoing

Missions
Preliminary and Detailed Design
Location
Istanbul, Türkiye
Activity
Highways

The project connects Kilyos and Sarıyer districts with 7,75 km long alignment that has 1,75 km of connection roads. It includes 7 km long double tube tunnel.

Key Figures

  • Second Largest TBM Tunnel in Türkiye with an excavation diameter of 13,75 m.
  • Cavern tunnels that will be used to assembly TBM with 665 m2 of tunnel face and 75 m long.
  • 13 bypasses, 4 cut&cover structures, 500 m long adit tunnel.
  • 100 m long viaduct.