Connecting Gebze to Sabiha Gökçen Airport
This project involved compiling and evaluating previous studies, determining the project alignment, and preparing geological maps along the route.
Key tasks
- Conducting dedicated drillings and laboratory tests
- Preparing geological and geotechnical profiles
- Specifying geotechnical design parameters
- Producing comprehensive reports
Slope analyses and designs were carried out, along with the design and typical drawings for all structures within the alignment. Detailed excavation support classes were developed for tunnels using NATM/TBM methods, supported by corresponding excavation and final lining drawings.
Solution proposals and slope support designs for tunnel portals were also prepared, and a detailed bill of quantities was established for tendering purposes.
Key Figures
- Double tunnel single-track
- 18.4km total length
- 160km/h design speed
- 1 TBM Tunnel (double tube – 8,4 km)
- 1 NATM Tunnel (single tube 2.45 km)
- 2 cut & cover
- 1 station