Esenboğa Airport rail system connection project
The metro project is from Kuyubaşı Station, passing through Esenboğa Airport to Yıldırım Beyazıt Üniversitesi Station. The project is performed with BIM. SYSTRA Türkiye was responsible for geological geotechnical works, TBM tunnel design, NATM tunnel design and Pursaklar Station design.
Key figures
- Double tunnel single-track
- 27km tunnel length
- 6.60m tunnel diameter
- 7 stations
- 4 crossover
- 1 viaduct
- 1 overpasses