Technical details
Client
Özgün – Özdemir JV / AYGM
Dates

2025-ongoing

Missions
Detail Design
Location
Adana, Türkiye
Activity
Railway

Located on the shores of the Mediterranean Sea, the Çukurova region will soon be equipped with 4 new rail links to better connect its various industrial centres.

Key Figures

  • 40 km of railway
  • 5 viaducts
  • 2 overpasses
  • 13 underpasses
  • 60 culverts
  • 8 cut&cover
  • 4 stations