Technical details
Client
TCDD
Dates

2012-2014

Missions
Preliminary Design, Detailed Design
Location
Sakarya, Türkiye
Activity
Railways

This project covered the study, design, and engineering works for the 34 km Line 2 between Arifiye and Pamukova stations. The scope included preparation of final designs and tender documentation for construction, mapping, EIA reporting, and expropriation plans. Detailed final designs were completed for 8 bridges, 8 overpasses, 33 joints, 4 vehicle underpasses, 2 pedestrian underpasses, and 1 cut-and-cover tunnel.

Key Figures

  • 34 km long
  • 160 km/h design speed
  • 8 viaducts
  • 8 overpasses
  • 1 cut&cover
  • 4 underpasses
  • 2 underpasses
  • 33 culverts