Technical details
Client
CMC di Ravenna
Dates
2016 – 2020
Missions
BIM construction design, Detailed design, Technical assistance during design construction
Location
Italy
Perimeter
Infrastructure, Civil Engineering, Geology/Hydrogeology, Geotechnics and foundations, Underground structures/tunnels

Mixed conventional and mechanised tunnel excavations applied.

The tunnel, hosting two railway tracks, was designed providing a mix between conventional and mechanised excavation techniques.

Lot Nesima-Misterbianco and lot Stesicoro-Airport include:

  • 5 stations
  • 3,5km of tunnel
  • 13 ventilation openings

The design included the Building Risk Assessment (BRA) and the geotechnical monitoring, inside and outside the tunnel.