International Bridge Technologies

DCR Access Road Bridge – Randolph, Massachusetts

Technical details
Client
Massachusetts Department of Transportation
Dates

Construction Completed: 2010

Location
Randolph, Massachusetts
Partners
Contractor: R. Zoppo Corp., Prime Consultant: Purcell Associates, Construction Engineering: Finley Engineering Group Inc.
Activity
SYSTRA IBT's Role: Bridge Design Consultant

DESIGN-BUILD

Length: two equal spans of 124 ft (38m) for a total of 248 ft (76 m)

Width: 29.7 ft (9 m)

Depth: 5.38 ft (1.6 m)

SYSTRA IBT and their partners were tasked with the design of the new bridge with the objectives of increasing the available clearance, reducing the maintenance cost, and minimizing the impact of construction without changing the approach grade on
either side.

The unique design consisted of precast concrete segments with a channel section, which increased the vertical clearance over Route 24 by more than 2 ft (0.6 m) without requiring any additional abutment fill. The erection of the superstructure took only two weeks, minimizing traffic disruption.

Awards:

  • 2011 ASBI – Bridge Award of Excellence
  • 2011 PCI – Best Non-highway Bridges, Engineering Design Award