International Bridge Technologies

Surrey Langley SkyTrain – Langley, BC, Canada

Technical details
Client
Province of British Columbia
Dates

Construction Completion: 2029

Location
Langley, B.C., Canada
Partners
Skylink Guideway Partners
Activity
SYSTRA IBT's Role: Prime Design Consultant

DESIGN-BUILD

Range of Spans: Typical simple supported spans of 40.4 m (133 ft); Special simple supported spans up to 48.4 m (159 ft); Continuous spans with 60 m (197 ft) main span length.
Total Guideway Length: 16 km
Width: 7.640 m (25 ft)

It will start from the existing terminus at King George Station in the City of Surrey, and extend through the Township of Langley, to a new terminus within the City of Langley (collectively, the “Three Municipalities”) at Langley City Centre.

The budget for the SLS Project is $5.996 billion, which includes capital costs and active transportation investments.

SYSTRA IBT serves as the Prime Design Consultant, including overall design management and the completion of the structural design scope for the elevated guideway.

Featured Project

Photo Credit: SYSTRA IBT