{"id":9903,"date":"2023-06-27T11:53:22","date_gmt":"2023-06-27T09:53:22","guid":{"rendered":"https:\/\/www.systra.com\/uk\/?post_type=projects&#038;p=9903"},"modified":"2026-04-09T08:18:14","modified_gmt":"2026-04-09T07:18:14","slug":"gatwick-airport-station-transformation","status":"publish","type":"projects","link":"https:\/\/www.systra.com\/uk\/project\/gatwick-airport-station-transformation\/","title":{"rendered":"Gatwick Airport station: Modernising a key UK transport hub"},"content":{"rendered":"\n<div class=\"wp-block-columns is-layout-flex wp-container-core-columns-is-layout-9d6595d7 wp-block-columns-is-layout-flex\">\n<div class=\"wp-block-column is-layout-flow wp-block-column-is-layout-flow\"><div class=\"content-top-project\">\n    <div class=\"content-top-details\">\n        <svg class=\"icon-sprite details-logo\"><use xlink:href=\"#icon_deco_systra_blanc\" \/>\n        <div class=\"title\">Technical details<\/div>\n        \t        <div class=\"single-content\">\n\t            <div class=\"subtitle\">Customer<\/div>\n\t            <div class=\"desc\">Costain (Network Rail)<\/div>\n\t        <\/div>\n                    <div class=\"single-content\">\n                <div class=\"subtitle\">Dates<\/div>\n                <div class=\"desc\"><p>2016 &#8211; 2023<\/p>\n<\/div>\n            <\/div>\n                    <div class=\"single-content\">\n                <div class=\"subtitle\">Missions<\/div>\n                <div class=\"desc\">Lead Designer and Architect (including Structural &amp; Civil Engineering and Highway &amp; Drainage)<\/div>\n            <\/div>\n                    <div class=\"single-content\">\n                <div class=\"subtitle\">Localisation<\/div>\n                <div class=\"desc\">Crawley, UK<\/div>\n            <\/div>\n                    <div class=\"single-content\">\n                <div class=\"subtitle\">Partners<\/div>\n                <div class=\"desc\">Gatwick Airport, Network Rail, Costain Department for Transport, Train operators: Govia Thameslink Railway (GTR), Gatwick Express, Southern &amp; Cross Country<\/div>\n            <\/div>\n                    <div class=\"single-content\">\n                <div class=\"subtitle\">Perimeter<\/div>\n                <div class=\"desc\">Architecture, Station &amp; Platform Design, Infrastructure Engineering, Environmental Consents &amp; Planning<\/div>\n            <\/div>\n                    <div class=\"single-content\">\n                <div class=\"subtitle\">Activity<\/div>\n                <div class=\"desc\">Sustainable Transport<\/div>\n            <\/div>\n           \n            \n    <\/div>\n\n\n\n<div class=\"wp-block-slider-projects\">\n\t\t<div class=\"wrapper-content-slider-projects\">\n\t\t\t<\/div>\n\t<\/div><\/div>\n\n\n\n<div class=\"wp-block-column is-layout-flow wp-block-column-is-layout-flow\">\n<div style=\"height:30px\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n\n\n\n<h3 class=\"wp-block-heading\" id=\"h-putting-passengers-first-a-design-led-project\">Putting passengers first: a design-led project<\/h3>\n\n\n\n<div style=\"height:20px\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n\n\n\n<p class=\"has-noir-color has-text-color has-medium-font-size\"><strong>Gatwick Airport station was opened by British Rail in May 1958, with major reconstruction and renovation works carried out in the late 1960s and 1980s and early 2011 when Platform 7 was installed. <\/strong><\/p>\n\n\n\n<p>In 2022, Gatwick Airport served 32.8m passengers, 71% of pre pandemic levels. As passengers return Gatwick Airport passenger numbers are expected to increase significantly in the years ahead.<\/p>\n\n\n\n<p>    \ud83c\udfa5   <a href=\"#gatwick-video\"> <\/a><strong>  Gatwick Airport Station opens to the public  &#8211; <\/strong><a href=\"#gatwick-video\"><strong><span style=\"text-decoration: underline;\">watch the video<\/span><\/strong><\/a><\/p>\n\n\n\n<p>The airport&#8217;s rail station was originally built to accommodate between 5-10 million passengers per year, but now serves over 20 million passengers per year.<\/p>\n\n\n\n<p>For many years passengers arriving and departing at Gatwick&#8217;s station have experienced overcrowding at both platform level and above in the station concourse, which houses the ticket office. <\/p>\n\n\n\n<p>In a poll in 2018 conducted by the independent watchdog Transport Focus, the station was ranked 2nd in Britain&#8217;s most unpopular stations with customers describing it as &#8221;small and cramped&#8221; and an &#8221;appalling welcome to the UK&#8221;.<\/p>\n\n\n\n<p>Overcoming these severe capacity constraints and transforming the passenger experience was the project&#8217;s main challenge.<\/p>\n\n\n<div class=\"wp-block-image is-style-default\">\n<figure class=\"aligncenter size-large\"><img decoding=\"async\" width=\"1024\" height=\"621\" src=\"https:\/\/www.systra.com\/uk\/wp-content\/uploads\/sites\/11\/2023\/06\/gatwick-cgi-view-01-se-1024x621.jpg\" alt=\"\" class=\"wp-image-9907\" srcset=\"https:\/\/www.systra.com\/uk\/wp-content\/uploads\/sites\/11\/2023\/06\/gatwick-cgi-view-01-se-1024x621.jpg 1024w, https:\/\/www.systra.com\/uk\/wp-content\/uploads\/sites\/11\/2023\/06\/gatwick-cgi-view-01-se-300x182.jpg 300w, https:\/\/www.systra.com\/uk\/wp-content\/uploads\/sites\/11\/2023\/06\/gatwick-cgi-view-01-se-768x466.jpg 768w, https:\/\/www.systra.com\/uk\/wp-content\/uploads\/sites\/11\/2023\/06\/gatwick-cgi-view-01-se-1536x932.jpg 1536w, https:\/\/www.systra.com\/uk\/wp-content\/uploads\/sites\/11\/2023\/06\/gatwick-cgi-view-01-se-2048x1242.jpg 2048w, https:\/\/www.systra.com\/uk\/wp-content\/uploads\/sites\/11\/2023\/06\/gatwick-cgi-view-01-se-474x288.jpg 474w, https:\/\/www.systra.com\/uk\/wp-content\/uploads\/sites\/11\/2023\/06\/gatwick-cgi-view-01-se-1700x1031.jpg 1700w, https:\/\/www.systra.com\/uk\/wp-content\/uploads\/sites\/11\/2023\/06\/gatwick-cgi-view-01-se-1352x820.jpg 1352w, https:\/\/www.systra.com\/uk\/wp-content\/uploads\/sites\/11\/2023\/06\/gatwick-cgi-view-01-se-800x485.jpg 800w, https:\/\/www.systra.com\/uk\/wp-content\/uploads\/sites\/11\/2023\/06\/gatwick-cgi-view-01-se-180x109.jpg 180w, https:\/\/www.systra.com\/uk\/wp-content\/uploads\/sites\/11\/2023\/06\/gatwick-cgi-view-01-se-153x93.jpg 153w, https:\/\/www.systra.com\/uk\/wp-content\/uploads\/sites\/11\/2023\/06\/gatwick-cgi-view-01-se-230x140.jpg 230w\" sizes=\"(max-width: 1024px) 100vw, 1024px\" \/><\/figure>\n<\/div>\n\n\n<div style=\"height:30px\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n\n\n\n<h3 class=\"wp-block-heading\" id=\"h-a-befitting-modern-gateway-to-the-uk\">A befitting modern gateway to the UK<\/h3>\n\n\n\n<div style=\"height:10px\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n\n\n\n<p><strong>The Client &amp; Stakeholder Group of Network Rail, Gatwick Airport Ltd and Station Operator GTR shared a vision to firstly resolve the major safety and operational issues at the station, but also to completely transform the passenger experience and create a more befitting station as a &#8216;gateway&#8217; entrance to the UK&#8217;.<\/strong><\/p>\n\n\n\n<p>Top priority would be a programme of improvements that would relieve overcrowding, improving the circulation of passengers entering and leaving and create a more integrated concourse with an intuitive connection between the station, the airport terminals and with onward travel.<\/p>\n\n\n\n<div style=\"height:10px\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n\n\n\n<h4 class=\"wp-block-heading\" id=\"h-working-within-a-live-station-and-airport-environment\">Working within a live station and airport environment<\/h4>\n\n\n\n<div style=\"height:10px\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n\n\n\n<p>The site constraints were a key factor in the design and construction since the station is situated amongst the airport&#8217;s South Terminal and highly restricted airspace above. The station had to remain operational 24\/7 with no timetable restrictions on the routes serving the station including Thameslink&#8217;s Brighton Main Line route to London and the Gatwick Express.<\/p>\n\n\n\n<div style=\"height:30px\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n\n\n<div class=\"wp-block-image\">\n<figure class=\"aligncenter size-full\"><img decoding=\"async\" width=\"2160\" height=\"1080\" src=\"https:\/\/www.systra.com\/uk\/wp-content\/uploads\/sites\/11\/2023\/11\/gatwick-airport-station-infographic_4.jpg\" alt=\"\" class=\"wp-image-12805\" srcset=\"https:\/\/www.systra.com\/uk\/wp-content\/uploads\/sites\/11\/2023\/11\/gatwick-airport-station-infographic_4.jpg 2160w, https:\/\/www.systra.com\/uk\/wp-content\/uploads\/sites\/11\/2023\/11\/gatwick-airport-station-infographic_4-300x150.jpg 300w, https:\/\/www.systra.com\/uk\/wp-content\/uploads\/sites\/11\/2023\/11\/gatwick-airport-station-infographic_4-768x384.jpg 768w, https:\/\/www.systra.com\/uk\/wp-content\/uploads\/sites\/11\/2023\/11\/gatwick-airport-station-infographic_4-1024x512.jpg 1024w, https:\/\/www.systra.com\/uk\/wp-content\/uploads\/sites\/11\/2023\/11\/gatwick-airport-station-infographic_4-1536x768.jpg 1536w, https:\/\/www.systra.com\/uk\/wp-content\/uploads\/sites\/11\/2023\/11\/gatwick-airport-station-infographic_4-2048x1024.jpg 2048w, https:\/\/www.systra.com\/uk\/wp-content\/uploads\/sites\/11\/2023\/11\/gatwick-airport-station-infographic_4-474x237.jpg 474w, https:\/\/www.systra.com\/uk\/wp-content\/uploads\/sites\/11\/2023\/11\/gatwick-airport-station-infographic_4-1700x850.jpg 1700w, https:\/\/www.systra.com\/uk\/wp-content\/uploads\/sites\/11\/2023\/11\/gatwick-airport-station-infographic_4-1352x676.jpg 1352w, https:\/\/www.systra.com\/uk\/wp-content\/uploads\/sites\/11\/2023\/11\/gatwick-airport-station-infographic_4-800x400.jpg 800w, https:\/\/www.systra.com\/uk\/wp-content\/uploads\/sites\/11\/2023\/11\/gatwick-airport-station-infographic_4-180x90.jpg 180w, https:\/\/www.systra.com\/uk\/wp-content\/uploads\/sites\/11\/2023\/11\/gatwick-airport-station-infographic_4-153x77.jpg 153w, https:\/\/www.systra.com\/uk\/wp-content\/uploads\/sites\/11\/2023\/11\/gatwick-airport-station-infographic_4-230x115.jpg 230w\" sizes=\"(max-width: 2160px) 100vw, 2160px\" \/><\/figure>\n<\/div>\n\n\n<div style=\"height:30px\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n\n\n\n<h4 class=\"wp-block-heading\" id=\"h-a-design-led-project-putting-passengers-first\">A design-led project putting passengers first<\/h4>\n\n\n\n<div style=\"height:10px\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n\n\n\n<p class=\"has-noir-color has-text-color\">SYSTRA was appointed in 2016 by construction company Costain as the lead design organisation on the Governance for Railway Investment Projects GRIP Stages 2-4 &#8216;design and build works&#8217; for the project, providing architectural, structural and civil engineering services including highways, drainage and environmental design. <\/p>\n\n\n\n<p>SYSTRA led the development of the brief and project strategies from early concept schemes to the final design and the development of the detailed planning and tender processes.<\/p>\n\n\n\n<p>In April 2018, SYSTRA supported Network Rail in the Planning Application for the new station. Although normally covered under Network Rails rights under Permitted Development, the project has been submitted through the planning process due to its significance as a major public building and through land purchases requiring a change of use application.<\/p>\n\n\n\n<div style=\"height:10px\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n\n\n\n<h4 class=\"wp-block-heading\" id=\"h-creating-a-brand-new-concourse-space\">Creating a brand new concourse space<\/h4>\n\n\n\n<div style=\"height:10px\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n\n\n\n<p>The solution to overcrowding was creating more space. An additional concourse space would mean a dedicated &#8216;entry&#8217; and &#8216;exit&#8217; space, making it far simpler and safer for passengers to move around.<\/p>\n\n\n\n<p>A new purpose built staff accommodation building was developed enabling the existing concourse and platform spaces to be de-cluttered of the staff accommodation that was previously scattered around the station. The new facility consolidates all station operational functions in to a dedicated hub.<\/p>\n\n\n\n<p>The existing station concourse was retained and re-configured using the larger overall footprint available to passengers, incorporating customer information and special assistance points. It will provide the main pedestrian flows for those leaving the airport.<\/p>\n\n\n\n<p>For those arriving at Gatwick by rail, a brand new steel framed station concourse structure was developed to provide the main route for those entering the airport. A new &#8216;naturally lit&#8217; concourse space was created between the existing Gatwick Airport link bridges and above platforms 5, 6 and 7.<\/p>\n\n\n\n<div style=\"height:10px\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n\n\n\n<h4 class=\"wp-block-heading\" id=\"h-achieving-a-seamless-transition-through-efficient-and-intuitive-passenger-flow\">Achieving a seamless transition through efficient and intuitive passenger flow<\/h4>\n\n\n\n<div style=\"height:10px\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n\n\n\n<p>The creation of a second concourse meant that there would be clear pedestrian routes and maintain separation for those arriving and departing the station. Improving passenger circulation involved integration of 5 new lifts and 8 new escalators to provide vertical connectivity between platform level and the larger concourse space.<\/p>\n\n\n\n<p>The project has significantly improved wheelchair accessibility<strong> <\/strong>by widening platforms 5 and 6 and through the creation of new lifts.<\/p>\n\n\n\n<div style=\"height:10px\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n\n\n\n<h4 class=\"wp-block-heading\" id=\"h-optimising-space-through-design-efficiency\">Optimising space through design efficiency<\/h4>\n\n\n\n<div style=\"height:10px\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n\n\n\n<p> Finding the additional space for the new concourse meant relocating the existing &#8216;back of house&#8217; facilities for station staff, including offices, meeting space, mess rooms, shower, changing and locker facilities. A brand new 2-storey purpose-built facility was built with a direct link to the station entrance concourse.<\/p>\n\n\n\n<p>The freed up existing \u2018back of house\u2019 area was refurbished and formed part of the &#8216;exit&#8217; concourse.<\/p>\n\n\n\n<div style=\"height:30px\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n\n\n\n<figure class=\"wp-block-gallery has-nested-images columns-2 is-cropped wp-block-gallery-1 is-layout-flex wp-block-gallery-is-layout-flex\">\n<figure class=\"wp-block-image size-474x266\"><a href=\"https:\/\/www.systra.com\/uk\/wp-content\/uploads\/sites\/11\/2023\/03\/gatwick-cgi-view-03-ae.jpg\"><img decoding=\"async\" width=\"474\" height=\"266\" data-id=\"1113\" src=\"https:\/\/www.systra.com\/uk\/wp-content\/uploads\/sites\/11\/2023\/03\/gatwick-cgi-view-03-ae-474x266.jpg\" alt=\"\" class=\"wp-image-1113\" srcset=\"https:\/\/www.systra.com\/uk\/wp-content\/uploads\/sites\/11\/2023\/03\/gatwick-cgi-view-03-ae-474x266.jpg 474w, https:\/\/www.systra.com\/uk\/wp-content\/uploads\/sites\/11\/2023\/03\/gatwick-cgi-view-03-ae-286x160.jpg 286w\" sizes=\"(max-width: 474px) 100vw, 474px\" \/><\/a><\/figure>\n\n\n\n<figure class=\"wp-block-image size-474x266\"><a href=\"https:\/\/www.systra.com\/uk\/wp-content\/uploads\/sites\/11\/2023\/06\/gatwick-station-concourse_web.jpg\"><img decoding=\"async\" width=\"474\" height=\"266\" data-id=\"9906\" src=\"https:\/\/www.systra.com\/uk\/wp-content\/uploads\/sites\/11\/2023\/06\/gatwick-station-concourse_web-474x266.jpg\" alt=\"\" class=\"wp-image-9906\" srcset=\"https:\/\/www.systra.com\/uk\/wp-content\/uploads\/sites\/11\/2023\/06\/gatwick-station-concourse_web-474x266.jpg 474w, https:\/\/www.systra.com\/uk\/wp-content\/uploads\/sites\/11\/2023\/06\/gatwick-station-concourse_web-286x160.jpg 286w\" sizes=\"(max-width: 474px) 100vw, 474px\" \/><\/a><\/figure>\n\n\n\n<figure class=\"wp-block-image size-full\"><a href=\"https:\/\/www.systra.com\/uk\/wp-content\/uploads\/sites\/11\/2023\/11\/gatwick-station-architecture-floor-plan-1.jpg\"><img decoding=\"async\" width=\"1378\" height=\"718\" data-id=\"12856\" src=\"https:\/\/www.systra.com\/uk\/wp-content\/uploads\/sites\/11\/2023\/11\/gatwick-station-architecture-floor-plan-1.jpg\" alt=\"\" class=\"wp-image-12856\" srcset=\"https:\/\/www.systra.com\/uk\/wp-content\/uploads\/sites\/11\/2023\/11\/gatwick-station-architecture-floor-plan-1.jpg 1378w, https:\/\/www.systra.com\/uk\/wp-content\/uploads\/sites\/11\/2023\/11\/gatwick-station-architecture-floor-plan-1-300x156.jpg 300w, https:\/\/www.systra.com\/uk\/wp-content\/uploads\/sites\/11\/2023\/11\/gatwick-station-architecture-floor-plan-1-768x400.jpg 768w, https:\/\/www.systra.com\/uk\/wp-content\/uploads\/sites\/11\/2023\/11\/gatwick-station-architecture-floor-plan-1-1024x534.jpg 1024w, https:\/\/www.systra.com\/uk\/wp-content\/uploads\/sites\/11\/2023\/11\/gatwick-station-architecture-floor-plan-1-474x247.jpg 474w, https:\/\/www.systra.com\/uk\/wp-content\/uploads\/sites\/11\/2023\/11\/gatwick-station-architecture-floor-plan-1-1352x704.jpg 1352w, https:\/\/www.systra.com\/uk\/wp-content\/uploads\/sites\/11\/2023\/11\/gatwick-station-architecture-floor-plan-1-800x417.jpg 800w, https:\/\/www.systra.com\/uk\/wp-content\/uploads\/sites\/11\/2023\/11\/gatwick-station-architecture-floor-plan-1-180x94.jpg 180w, https:\/\/www.systra.com\/uk\/wp-content\/uploads\/sites\/11\/2023\/11\/gatwick-station-architecture-floor-plan-1-153x80.jpg 153w, https:\/\/www.systra.com\/uk\/wp-content\/uploads\/sites\/11\/2023\/11\/gatwick-station-architecture-floor-plan-1-230x120.jpg 230w\" sizes=\"(max-width: 1378px) 100vw, 1378px\" \/><\/a><\/figure>\n\n\n\n<figure class=\"wp-block-image size-full\"><a href=\"https:\/\/www.systra.com\/uk\/wp-content\/uploads\/sites\/11\/2023\/06\/gatwick-station-roof.png\"><img decoding=\"async\" width=\"1213\" height=\"613\" data-id=\"9905\" src=\"https:\/\/www.systra.com\/uk\/wp-content\/uploads\/sites\/11\/2023\/06\/gatwick-station-roof.png\" alt=\"\" class=\"wp-image-9905\" srcset=\"https:\/\/www.systra.com\/uk\/wp-content\/uploads\/sites\/11\/2023\/06\/gatwick-station-roof.png 1213w, https:\/\/www.systra.com\/uk\/wp-content\/uploads\/sites\/11\/2023\/06\/gatwick-station-roof-300x152.png 300w, https:\/\/www.systra.com\/uk\/wp-content\/uploads\/sites\/11\/2023\/06\/gatwick-station-roof-768x388.png 768w, https:\/\/www.systra.com\/uk\/wp-content\/uploads\/sites\/11\/2023\/06\/gatwick-station-roof-1024x517.png 1024w, https:\/\/www.systra.com\/uk\/wp-content\/uploads\/sites\/11\/2023\/06\/gatwick-station-roof-474x240.png 474w, https:\/\/www.systra.com\/uk\/wp-content\/uploads\/sites\/11\/2023\/06\/gatwick-station-roof-800x404.png 800w, https:\/\/www.systra.com\/uk\/wp-content\/uploads\/sites\/11\/2023\/06\/gatwick-station-roof-180x91.png 180w, https:\/\/www.systra.com\/uk\/wp-content\/uploads\/sites\/11\/2023\/06\/gatwick-station-roof-153x77.png 153w, https:\/\/www.systra.com\/uk\/wp-content\/uploads\/sites\/11\/2023\/06\/gatwick-station-roof-230x116.png 230w\" sizes=\"(max-width: 1213px) 100vw, 1213px\" \/><\/a><\/figure>\n<\/figure>\n\n\n\n<div style=\"height:51px\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n\n\n\n<h3 class=\"wp-block-heading\" id=\"h-masterplanning-approach-to-configure-best-in-design\">Masterplanning approach to configure best in design<\/h3>\n\n\n\n<div style=\"height:10px\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n\n\n\n<p class=\"has-noir-color has-text-color\"><strong>We adopted a master planning approach to find the best solutions to the overcrowding problem. We started by undertaking a full appraisal of the airport station site and key strategic decisions made in order to transform the station operation.<\/strong><\/p>\n\n\n\n<div style=\"height:10px\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n\n\n\n<h4 class=\"wp-block-heading\" id=\"h-passenger-experience-led-the-design-philosophy\">Passenger experience led the design philosophy<\/h4>\n\n\n\n<div style=\"height:10px\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n\n\n\n<p>Through a series of stakeholder workshops, we were able to understand the challenges at the station and develop a design philosophy where the journey of a passenger drove the entire design process. This informed how we would arrange the space and manage the overall passenger experience.<\/p>\n\n\n\n<p>A rigorous stakeholder engagement process was established alongside the development of the concept design, ensuring each were aligned and continuously challenged. This guaranteed that the proposal would meet all of the client&#8217;s aspirations and requirements, and most importantly allowed plenty of opportunity to discuss and continually review the design.<\/p>\n\n\n\n<div style=\"height:10px\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n\n\n\n<h4 class=\"wp-block-heading\" id=\"h-visual-tools-to-help-engaging-stakeholders-at-an-early-stage\">Visual tools to help engaging stakeholders at an early stage<\/h4>\n\n\n\n<div style=\"height:10px\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n\n\n\n<p>To visually communicate the proposed schemes we developed a series of tools, using VR goggles, hand sketches, computer generated images and physical 3D models. Hand-drawn sketches were used in the earliest stages to quickly support the optioneering process.<\/p>\n\n\n\n<p>Through a series of stakeholder workshops, we were able to understand the challenges at the station and develop a design philosophy where the journey of a passenger drove the entire design process. This informed how we would arrange the space and manage the overall passenger experience.<\/p>\n\n\n\n<p>An excellent collaborative relationship was developed with Costain and Network Rail.<\/p>\n\n\n\n<div style=\"height:30px\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n\n\n\n<p><em><a id=\"gatwick-video\">Gatwick Airport Station Opens to the public &#8211; Interview with SYSTRA&#8217;s Jordan Gill<\/a><\/em><\/p>\n\n\n\n<div style=\"height:10px\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n\n\n\n<div class=\"wp-block-group\"><div class=\"wp-block-group__inner-container is-layout-constrained wp-block-group-is-layout-constrained\">\n<figure class=\"wp-block-embed is-type-video is-provider-youtube wp-block-embed-youtube wp-embed-aspect-16-9 wp-has-aspect-ratio\"><div class=\"wp-block-embed__wrapper\">\n<div class=\"youtube_wrapper\" videoID=\"OINkipKVbG0\"><iframe title=\"Gatwick Airport Station Opens to the public - Interview with SYSTRA&#039;s Jordan Gill\" width=\"500\" height=\"281\" src=\"https:\/\/www.youtube-nocookie.com\/embed\/OINkipKVbG0?feature=oembed\" frameborder=\"0\" allow=\"accelerometer; autoplay; clipboard-write; encrypted-media; gyroscope; picture-in-picture; web-share\" referrerpolicy=\"strict-origin-when-cross-origin\" allowfullscreen><\/iframe><\/div>\n<\/div><\/figure>\n<\/div><\/div>\n\n\n\n<div style=\"height:40px\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n\n\n\n<h3 class=\"wp-block-heading\" id=\"h-gatwick-airport-rail-station-opens-autumn-2023\">Gatwick Airport Rail Station opens Autumn 2023<\/h3>\n\n\n\n<div style=\"height:10px\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n\n\n\n<p><strong>Construction work began in May 2020, which was helped indirectly with less passenger travel during the Covid pandemic. Phased platform closures took place between 2020 to 2022 to install lifts, escalators and staircases. The construction of the concourse began in June 2021 and was complete in May 2022. The final additional works to complete the new concourse will be delivered during 2023.<\/strong><\/p>\n\n\n\n<div style=\"height:10px\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n\n\n\n<h4 class=\"wp-block-heading\" id=\"h-value-engineering-from-the-ground-up\">Value engineering from the ground up<\/h4>\n\n\n\n<div style=\"height:10px\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n\n\n\n<p>Instead of removing the existing platform sub-structure elements, we were able to leave them intact. A topographical survey showed where to locate the new structure. This enabled any work involved in removing the existing sub structure to be kept to a minimum, saving costs in terms excavation, disposal and the lorry journeys.<\/p>\n\n\n\n<div style=\"height:10px\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n\n\n\n<h4 class=\"wp-block-heading\" id=\"h-a-sustainable-engineering-solution\">A sustainable engineering solution<\/h4>\n\n\n\n<div style=\"height:10px\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n\n\n\n<p>Many of the individual structural elements of the project were &#8216;value engineered&#8217; in conjunction with Costain and Network Rail providing a coherent approach to the design and construction from the outset. For example the selection of the main concourse structure was chosen this way.<\/p>\n\n\n\n<p>It meant that various types of floor structures were considered and tested against several criteria, including cost, strength, weight and the ease of construction on site. The final metal deck system was chosen as the best and most cost effective solution.<\/p>\n\n\n\n<div style=\"height:10px\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n\n\n\n<h4 class=\"wp-block-heading\" id=\"h-significantly-reducing-carbon-footprint-in-short-and-long-term\">Significantly reducing carbon footprint in short and long term<\/h4>\n\n\n\n<div style=\"height:10px\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n\n\n\n<p>To reduce carbon consumption LED lighting was used throughout the station including in lifts and permanent installations. The escalators were fitted with reduced speed technology and high efficiency gearless lifts were installed. A hybrid heating and cooling system was installed too.<\/p>\n\n\n\n<p>By future proofing energy demand from operational costs through the choice of lighting and heating, we are able to provide an estimated annual operational cost saving of \u00a358,686 and an annual reduction of 143.57 tonnes of carbon emissions equivalent, with projected savings of nearly \u00a33 million over 50 years.<\/p>\n\n\n\n<p>With rigorous environmental consideration from the design stage, we made sure that materials used in the construction would reduce the projects carbon impact. By 2023 the project had used almost 3,000m3 of low-carbon concrete for construction, saving 517 tonnes of CO2 emissions and \u00a312,500 in costs.<\/p>\n\n\n\n<div style=\"height:20px\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n\n\n\n<div class=\"wp-block-media-text is-stacked-on-mobile is-vertically-aligned-top is-image-fill-element has-blanc-color has-pale-mauve-background-color has-text-color has-background\"><figure class=\"wp-block-media-text__media\"><img decoding=\"async\" width=\"1000\" height=\"750\" src=\"https:\/\/www.systra.com\/uk\/wp-content\/uploads\/sites\/11\/2023\/11\/systra-gatwick.jpg\" alt=\"\" class=\"wp-image-12616 size-full\" style=\"object-position:58% 76%\" srcset=\"https:\/\/www.systra.com\/uk\/wp-content\/uploads\/sites\/11\/2023\/11\/systra-gatwick.jpg 1000w, https:\/\/www.systra.com\/uk\/wp-content\/uploads\/sites\/11\/2023\/11\/systra-gatwick-300x225.jpg 300w, https:\/\/www.systra.com\/uk\/wp-content\/uploads\/sites\/11\/2023\/11\/systra-gatwick-768x576.jpg 768w, https:\/\/www.systra.com\/uk\/wp-content\/uploads\/sites\/11\/2023\/11\/systra-gatwick-474x356.jpg 474w, https:\/\/www.systra.com\/uk\/wp-content\/uploads\/sites\/11\/2023\/11\/systra-gatwick-800x600.jpg 800w, https:\/\/www.systra.com\/uk\/wp-content\/uploads\/sites\/11\/2023\/11\/systra-gatwick-180x135.jpg 180w, https:\/\/www.systra.com\/uk\/wp-content\/uploads\/sites\/11\/2023\/11\/systra-gatwick-153x115.jpg 153w, https:\/\/www.systra.com\/uk\/wp-content\/uploads\/sites\/11\/2023\/11\/systra-gatwick-230x173.jpg 230w\" sizes=\"(max-width: 1000px) 100vw, 1000px\" \/><\/figure><div class=\"wp-block-media-text__content\">\n<div style=\"height:9px\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n\n\n\n<blockquote class=\"wp-block-quote has-noir-color has-text-color is-layout-flow wp-block-quote-is-layout-flow\">\n<p class=\"has-noir-color has-text-color\">I have been extremely impressed by the collaborative working on the Gatwick Airport Station project. There is a strong \u2018one team\u2019 feel to all the work produced, and I&#8217;m confident that will significantly benefit the project.&#8221;<\/p>\n<cite>James Conway, Programme Director, Department for Transport (DfT)<\/cite><\/blockquote>\n\n\n\n<div style=\"height:17px\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n<\/div><\/div>\n<\/div>\n<\/div>\n\n\n\n<div class=\"wp-block-media-text is-stacked-on-mobile is-style-offer-with-rail\"><figure class=\"wp-block-media-text__media\"><img decoding=\"async\" width=\"500\" height=\"500\" src=\"https:\/\/www.systra.com\/uk\/wp-content\/uploads\/sites\/11\/2023\/06\/mmc-scorecard-gatwick.png\" alt=\"\" class=\"wp-image-31858 size-full\" srcset=\"https:\/\/www.systra.com\/uk\/wp-content\/uploads\/sites\/11\/2023\/06\/mmc-scorecard-gatwick.png 500w, https:\/\/www.systra.com\/uk\/wp-content\/uploads\/sites\/11\/2023\/06\/mmc-scorecard-gatwick-150x150.png 150w, https:\/\/www.systra.com\/uk\/wp-content\/uploads\/sites\/11\/2023\/06\/mmc-scorecard-gatwick-300x300.png 300w, https:\/\/www.systra.com\/uk\/wp-content\/uploads\/sites\/11\/2023\/06\/mmc-scorecard-gatwick-376x376.png 376w, https:\/\/www.systra.com\/uk\/wp-content\/uploads\/sites\/11\/2023\/06\/mmc-scorecard-gatwick-474x474.png 474w, https:\/\/www.systra.com\/uk\/wp-content\/uploads\/sites\/11\/2023\/06\/mmc-scorecard-gatwick-180x180.png 180w, https:\/\/www.systra.com\/uk\/wp-content\/uploads\/sites\/11\/2023\/06\/mmc-scorecard-gatwick-153x153.png 153w, https:\/\/www.systra.com\/uk\/wp-content\/uploads\/sites\/11\/2023\/06\/mmc-scorecard-gatwick-230x230.png 230w\" sizes=\"(max-width: 500px) 100vw, 500px\" \/><\/figure><div class=\"wp-block-media-text__content\">\n<h4 class=\"wp-block-heading\" id=\"h-modern-methods-of-construction-applied-during-the-gatwick-airport-station-project\">Modern methods of construction applied during the Gatwick airport station project <\/h4>\n\n\n\n<div style=\"height:14px\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n\n\n\n<p>We were involved from early concept stage through to the construction stage. We worked in close collaboration with Costain (Main Contractor) and Network Rail (Asset Owner) through successful stakeholder engagements using different visualisation media. We introduced modular, offsite elements to improve the construction phase delivery within a physically constrained environment and this led to a low carbon footprint during the construction.<\/p>\n\n\n\n<div style=\"height:21px\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n\n\n\n<div class=\"wp-block-buttons is-layout-flex wp-block-buttons-is-layout-flex\">\n<div class=\"wp-block-button is-style-offer-button\"><a class=\"wp-block-button__link has-medium-font-size has-custom-font-size wp-element-button\" href=\"https:\/\/www.systra.com\/uk\/services\/modern-methods-of-construction\/\">Find out more about mmc<\/a><\/div>\n<\/div>\n\n\n\n<p><\/p>\n<\/div><\/div>\n\n\n\n<div style=\"height:10px\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n\n\n\n<p class=\"has-text-align-center has-medium-font-size\">We\u2019d love to help with your next project<\/p>\n\n\n\n<div style=\"height:10px\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n\n\n\n<div class=\"wp-block-buttons is-content-justification-center is-layout-flex wp-container-core-buttons-is-layout-16018d1d wp-block-buttons-is-layout-flex\">\n<div class=\"wp-block-button is-style-outline is-style-outline--2\"><a class=\"wp-block-button__link has-blanc-color has-dirty-purple-background-color has-text-color has-background wp-element-button\" href=\"https:\/\/www.systra.com\/uk\/contact\/business\/\" style=\"border-radius:100px\">Connect with our Specialists<\/a><\/div>\n<\/div>\n\n\n\n<div style=\"height:24px\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n\n\n\n<div class=\"wp-block-group who-pattern-content-feed\"><div class=\"wp-block-group__inner-container is-layout-constrained wp-block-group-is-layout-constrained\">\n<div class=\"wp-block-columns is-layout-flex wp-container-core-columns-is-layout-9d6595d7 wp-block-columns-is-layout-flex\">\n<div class=\"wp-block-column is-layout-flow wp-block-column-is-layout-flow\" style=\"flex-basis:50%\">\n    <div class=\"who-block-content-feed\">\n        \n\t\t<div class=\"tile tile--services \">\n\t\t<figure class=\"tile__thumbnail\">\n\t\t\t<img decoding=\"async\" width=\"1024\" height=\"567\" src=\"https:\/\/www.systra.com\/uk\/wp-content\/uploads\/sites\/11\/2023\/08\/architect-team2-1024x567.jpg\" class=\"attachment-large size-large wp-post-image\" alt=\"\" \/>\n\t\t\t<figcaption class=\"tile__content\">\n\t\t\t\t\t\t\t\t\t<ul class=\"tile__tag__wrapper\">\n\t\t\t\t\t\t<li class=\"tile__tag\">\n\t\t\t\t\t\t\tservices\t\t\t\t\t\t<\/li>\n\t\t\t\t\t<\/ul>\n\t\t\t\t\t\t\t\t<h3 class=\"tile__title\" style=\"color:#fff !important\">Architecture<\/h3>\n\n\t\t\t\t<a class=\"tile__link\" href=\"https:\/\/www.systra.com\/uk\/services\/infrastructure-engineering\/architecture\/\">\n\t\t\t\t\tRead more\t\t\t\t\t<span class=\"screen-reader-text\"> sur Architecture<\/span>\n\t\t\t\t<\/a>\n\t\t\t<\/figcaption>\n\t\t<\/figure>\n\t<\/div>\n    <\/div>\n<\/div>\n\n\n\n<div class=\"wp-block-column is-layout-flow wp-block-column-is-layout-flow\" style=\"flex-basis:50%\">\n    <div class=\"who-block-content-feed\">\n        \n\t\t<div class=\"tile tile--services \">\n\t\t<figure class=\"tile__thumbnail\">\n\t\t\t<img decoding=\"async\" width=\"1024\" height=\"645\" src=\"https:\/\/www.systra.com\/uk\/wp-content\/uploads\/sites\/11\/2023\/07\/artboard-8-1024x645.jpg\" class=\"attachment-large size-large wp-post-image\" alt=\"\" \/>\n\t\t\t<figcaption class=\"tile__content\">\n\t\t\t\t\t\t\t\t\t<ul class=\"tile__tag__wrapper\">\n\t\t\t\t\t\t<li class=\"tile__tag\">\n\t\t\t\t\t\t\tservices\t\t\t\t\t\t<\/li>\n\t\t\t\t\t<\/ul>\n\t\t\t\t\t\t\t\t<h3 class=\"tile__title\" style=\"color:#fff !important\">Station and Platform Design<\/h3>\n\n\t\t\t\t<a class=\"tile__link\" href=\"https:\/\/www.systra.com\/uk\/services\/infrastructure-engineering\/station-platform-design\/\">\n\t\t\t\t\tRead more\t\t\t\t\t<span class=\"screen-reader-text\"> sur Station and Platform Design<\/span>\n\t\t\t\t<\/a>\n\t\t\t<\/figcaption>\n\t\t<\/figure>\n\t<\/div>\n    <\/div>\n<\/div>\n\n\n\n<div class=\"wp-block-column is-layout-flow wp-block-column-is-layout-flow\" style=\"flex-basis:50%\">\n    <div class=\"who-block-content-feed\">\n        \n\t\t<div class=\"tile tile--markets \">\n\t\t<figure class=\"tile__thumbnail\">\n\t\t\t<img decoding=\"async\" width=\"1024\" height=\"645\" src=\"https:\/\/www.systra.com\/uk\/wp-content\/uploads\/sites\/11\/2023\/05\/l3-markets-transport-hubs-website-header-1024x645.jpg\" class=\"attachment-large size-large wp-post-image\" alt=\"markets-transport-hubs-website-header\" \/>\n\t\t\t<figcaption class=\"tile__content\">\n\t\t\t\t\t\t\t\t\t<ul class=\"tile__tag__wrapper\">\n\t\t\t\t\t\t<li class=\"tile__tag\">\n\t\t\t\t\t\t\tmarkets\t\t\t\t\t\t<\/li>\n\t\t\t\t\t<\/ul>\n\t\t\t\t\t\t\t\t<h3 class=\"tile__title\" style=\"color:#fff !important\">Transport Hubs &amp; Interchanges<\/h3>\n\n\t\t\t\t<a class=\"tile__link\" href=\"https:\/\/www.systra.com\/uk\/markets\/cities-urban-mobility\/transport-hubs-interchanges\/\">\n\t\t\t\t\tRead more\t\t\t\t\t<span class=\"screen-reader-text\"> sur Transport Hubs &amp; Interchanges<\/span>\n\t\t\t\t<\/a>\n\t\t\t<\/figcaption>\n\t\t<\/figure>\n\t<\/div>\n    <\/div>\n<\/div>\n<\/div>\n<\/div><\/div>\n\n\n\n<div class=\"wp-block-group who-pattern-content-feed\"><div class=\"wp-block-group__inner-container is-layout-constrained wp-block-group-is-layout-constrained\">\n<div class=\"wp-block-columns is-layout-flex wp-container-core-columns-is-layout-9d6595d7 wp-block-columns-is-layout-flex\">\n<div class=\"wp-block-column is-layout-flow wp-block-column-is-layout-flow\" style=\"flex-basis:50%\">\n    <div class=\"who-block-content-feed\">\n        \n\t\t<div class=\"tile tile--page \">\n\t\t<figure class=\"tile__thumbnail\">\n\t\t\t<img decoding=\"async\" width=\"1024\" height=\"645\" src=\"https:\/\/www.systra.com\/uk\/wp-content\/uploads\/sites\/11\/2023\/06\/strategic-traffic-modelling-website-header-1024x645.jpg\" class=\"attachment-large size-large wp-post-image\" alt=\"\" \/>\n\t\t\t<figcaption class=\"tile__content\">\n\t\t\t\t\t\t\t\t<h3 class=\"tile__title\" style=\"color:#fff !important\">About Us<\/h3>\n\n\t\t\t\t<a class=\"tile__link\" href=\"https:\/\/www.systra.com\/uk\/who-we-are\/about-us\/\">\n\t\t\t\t\tRead more\t\t\t\t\t<span class=\"screen-reader-text\"> sur About Us<\/span>\n\t\t\t\t<\/a>\n\t\t\t<\/figcaption>\n\t\t<\/figure>\n\t<\/div>\n    <\/div>\n<\/div>\n\n\n\n<div class=\"wp-block-column is-layout-flow wp-block-column-is-layout-flow\" style=\"flex-basis:50%\">\n    <div class=\"who-block-content-feed\">\n        \n\t\t<div class=\"tile tile--page \">\n\t\t<figure class=\"tile__thumbnail\">\n\t\t\t<img decoding=\"async\" width=\"1024\" height=\"645\" src=\"https:\/\/www.systra.com\/uk\/wp-content\/uploads\/sites\/11\/2023\/06\/start-a-career-at-systra-header-1024x645.jpg\" class=\"attachment-large size-large wp-post-image\" alt=\"\" \/>\n\t\t\t<figcaption class=\"tile__content\">\n\t\t\t\t\t\t\t\t<h3 class=\"tile__title\" style=\"color:#fff !important\">Careers at SYSTRA<\/h3>\n\n\t\t\t\t<a class=\"tile__link\" href=\"https:\/\/www.systra.com\/uk\/careers\/start-a-career-at-systra\/\">\n\t\t\t\t\tRead more\t\t\t\t\t<span class=\"screen-reader-text\"> sur Careers at SYSTRA<\/span>\n\t\t\t\t<\/a>\n\t\t\t<\/figcaption>\n\t\t<\/figure>\n\t<\/div>\n    <\/div>\n<\/div>\n<\/div>\n<\/div><\/div>\n\n\n\n<div style=\"height:42px\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n\n\n\n<div class=\"wp-block-group\"><div class=\"wp-block-group__inner-container is-layout-constrained wp-block-group-is-layout-constrained\">\n<div class=\"wp-block-buttons is-layout-flex wp-block-buttons-is-layout-flex\">\n<div class=\"wp-block-button has-custom-width wp-block-button__width-100\"><a class=\"wp-block-button__link has-dirty-purple-color has-pale-mauve-background-color has-text-color has-background has-link-color wp-element-button\" href=\"https:\/\/www.systra.com\/uk\/register\/join-our-community\/\">JOIN OUR COMMUNITY<\/a><\/div>\n<\/div>\n<\/div><\/div>\n\n\n\n<div style=\"height:76px\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n","protected":false},"author":59,"featured_media":9192,"parent":0,"template":"","type-market":[5501],"project-market":[],"project-service":[],"project-location":[],"type-service":[289,215],"type-solution":[],"class_list":["post-9903","projects","type-projects","status-publish","has-post-thumbnail","hentry","type-market-large-infrastructure","type-service-engineering-management","type-service-infrastructure-engineering"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v27.3 (Yoast SEO v27.3) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>Upgrading Gatwick Airport station: Modernising a key UK transport hub - Transport Architecture - SYSTRA UK<\/title>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<meta property=\"og:locale\" content=\"en_GB\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Gatwick Airport station: Modernising a key UK transport hub\" \/>\n<meta property=\"og:description\" content=\"Putting passengers first: a design-led project Gatwick Airport station was opened by British Rail in May 1958, with major reconstruction and renovation works carried out in the late 1960s and 1980s and early 2011 when Platform 7 was installed. In 2022, Gatwick Airport served 32.8m passengers, 71% of pre pandemic levels. As passengers return Gatwick [&hellip;]\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.systra.com\/uk\/project\/gatwick-airport-station-transformation\/\" \/>\n<meta property=\"og:site_name\" content=\"SYSTRA UK\" \/>\n<meta property=\"article:modified_time\" content=\"2026-04-09T07:18:14+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/www.systra.com\/uk\/wp-content\/uploads\/sites\/11\/2023\/06\/gatwick-cgi-view-03-ae-1.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"2380\" \/>\n\t<meta property=\"og:image:height\" content=\"1500\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:site\" content=\"@SYSTRA_LTD\" \/>\n<meta name=\"twitter:label1\" content=\"Estimated reading time\" \/>\n\t<meta name=\"twitter:data1\" content=\"25 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.systra.com\\\/uk\\\/project\\\/gatwick-airport-station-transformation\\\/\",\"url\":\"https:\\\/\\\/www.systra.com\\\/uk\\\/project\\\/gatwick-airport-station-transformation\\\/\",\"name\":\"Upgrading Gatwick Airport station: Modernising a key UK transport hub - Transport Architecture - SYSTRA UK\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.systra.com\\\/uk\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/www.systra.com\\\/uk\\\/project\\\/gatwick-airport-station-transformation\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/www.systra.com\\\/uk\\\/project\\\/gatwick-airport-station-transformation\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/www.systra.com\\\/uk\\\/wp-content\\\/uploads\\\/sites\\\/11\\\/2023\\\/06\\\/gatwick-cgi-view-03-ae-1.jpg\",\"datePublished\":\"2023-06-27T09:53:22+00:00\",\"dateModified\":\"2026-04-09T07:18:14+00:00\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.systra.com\\\/uk\\\/project\\\/gatwick-airport-station-transformation\\\/#breadcrumb\"},\"inLanguage\":\"en-GB\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/www.systra.com\\\/uk\\\/project\\\/gatwick-airport-station-transformation\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-GB\",\"@id\":\"https:\\\/\\\/www.systra.com\\\/uk\\\/project\\\/gatwick-airport-station-transformation\\\/#primaryimage\",\"url\":\"https:\\\/\\\/www.systra.com\\\/uk\\\/wp-content\\\/uploads\\\/sites\\\/11\\\/2023\\\/06\\\/gatwick-cgi-view-03-ae-1.jpg\",\"contentUrl\":\"https:\\\/\\\/www.systra.com\\\/uk\\\/wp-content\\\/uploads\\\/sites\\\/11\\\/2023\\\/06\\\/gatwick-cgi-view-03-ae-1.jpg\",\"width\":2380,\"height\":1500},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.systra.com\\\/uk\\\/project\\\/gatwick-airport-station-transformation\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/www.systra.com\\\/uk\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Projects\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.systra.com\\\/uk\\\/#website\",\"url\":\"https:\\\/\\\/www.systra.com\\\/uk\\\/\",\"name\":\"SYSTRA UK\",\"description\":\"\",\"publisher\":{\"@id\":\"https:\\\/\\\/www.systra.com\\\/uk\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/www.systra.com\\\/uk\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-GB\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/www.systra.com\\\/uk\\\/#organization\",\"name\":\"SYSTRA UK\",\"url\":\"https:\\\/\\\/www.systra.com\\\/uk\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-GB\",\"@id\":\"https:\\\/\\\/www.systra.com\\\/uk\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/www.systra.com\\\/uk\\\/wp-content\\\/uploads\\\/sites\\\/11\\\/2023\\\/07\\\/systra-logo.jpg\",\"contentUrl\":\"https:\\\/\\\/www.systra.com\\\/uk\\\/wp-content\\\/uploads\\\/sites\\\/11\\\/2023\\\/07\\\/systra-logo.jpg\",\"width\":400,\"height\":400,\"caption\":\"SYSTRA UK\"},\"image\":{\"@id\":\"https:\\\/\\\/www.systra.com\\\/uk\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"sameAs\":[\"https:\\\/\\\/x.com\\\/SYSTRA_LTD\",\"https:\\\/\\\/uk.linkedin.com\\\/company\\\/systra_ltd\"]}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"Upgrading Gatwick Airport station: Modernising a key UK transport hub - Transport Architecture - SYSTRA UK","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"og_locale":"en_GB","og_type":"article","og_title":"Gatwick Airport station: Modernising a key UK transport hub","og_description":"Putting passengers first: a design-led project Gatwick Airport station was opened by British Rail in May 1958, with major reconstruction and renovation works carried out in the late 1960s and 1980s and early 2011 when Platform 7 was installed. In 2022, Gatwick Airport served 32.8m passengers, 71% of pre pandemic levels. As passengers return Gatwick [&hellip;]","og_url":"https:\/\/www.systra.com\/uk\/project\/gatwick-airport-station-transformation\/","og_site_name":"SYSTRA UK","article_modified_time":"2026-04-09T07:18:14+00:00","og_image":[{"width":2380,"height":1500,"url":"https:\/\/www.systra.com\/uk\/wp-content\/uploads\/sites\/11\/2023\/06\/gatwick-cgi-view-03-ae-1.jpg","type":"image\/jpeg"}],"twitter_card":"summary_large_image","twitter_site":"@SYSTRA_LTD","twitter_misc":{"Estimated reading time":"25 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/www.systra.com\/uk\/project\/gatwick-airport-station-transformation\/","url":"https:\/\/www.systra.com\/uk\/project\/gatwick-airport-station-transformation\/","name":"Upgrading Gatwick Airport station: Modernising a key UK transport hub - Transport Architecture - SYSTRA UK","isPartOf":{"@id":"https:\/\/www.systra.com\/uk\/#website"},"primaryImageOfPage":{"@id":"https:\/\/www.systra.com\/uk\/project\/gatwick-airport-station-transformation\/#primaryimage"},"image":{"@id":"https:\/\/www.systra.com\/uk\/project\/gatwick-airport-station-transformation\/#primaryimage"},"thumbnailUrl":"https:\/\/www.systra.com\/uk\/wp-content\/uploads\/sites\/11\/2023\/06\/gatwick-cgi-view-03-ae-1.jpg","datePublished":"2023-06-27T09:53:22+00:00","dateModified":"2026-04-09T07:18:14+00:00","breadcrumb":{"@id":"https:\/\/www.systra.com\/uk\/project\/gatwick-airport-station-transformation\/#breadcrumb"},"inLanguage":"en-GB","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.systra.com\/uk\/project\/gatwick-airport-station-transformation\/"]}]},{"@type":"ImageObject","inLanguage":"en-GB","@id":"https:\/\/www.systra.com\/uk\/project\/gatwick-airport-station-transformation\/#primaryimage","url":"https:\/\/www.systra.com\/uk\/wp-content\/uploads\/sites\/11\/2023\/06\/gatwick-cgi-view-03-ae-1.jpg","contentUrl":"https:\/\/www.systra.com\/uk\/wp-content\/uploads\/sites\/11\/2023\/06\/gatwick-cgi-view-03-ae-1.jpg","width":2380,"height":1500},{"@type":"BreadcrumbList","@id":"https:\/\/www.systra.com\/uk\/project\/gatwick-airport-station-transformation\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.systra.com\/uk"},{"@type":"ListItem","position":2,"name":"Projects"}]},{"@type":"WebSite","@id":"https:\/\/www.systra.com\/uk\/#website","url":"https:\/\/www.systra.com\/uk\/","name":"SYSTRA UK","description":"","publisher":{"@id":"https:\/\/www.systra.com\/uk\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.systra.com\/uk\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-GB"},{"@type":"Organization","@id":"https:\/\/www.systra.com\/uk\/#organization","name":"SYSTRA UK","url":"https:\/\/www.systra.com\/uk\/","logo":{"@type":"ImageObject","inLanguage":"en-GB","@id":"https:\/\/www.systra.com\/uk\/#\/schema\/logo\/image\/","url":"https:\/\/www.systra.com\/uk\/wp-content\/uploads\/sites\/11\/2023\/07\/systra-logo.jpg","contentUrl":"https:\/\/www.systra.com\/uk\/wp-content\/uploads\/sites\/11\/2023\/07\/systra-logo.jpg","width":400,"height":400,"caption":"SYSTRA UK"},"image":{"@id":"https:\/\/www.systra.com\/uk\/#\/schema\/logo\/image\/"},"sameAs":["https:\/\/x.com\/SYSTRA_LTD","https:\/\/uk.linkedin.com\/company\/systra_ltd"]}]}},"lang":"en","translations":{"en":9903},"pll_sync_post":[],"_links":{"self":[{"href":"https:\/\/www.systra.com\/uk\/wp-json\/wp\/v2\/projects\/9903","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.systra.com\/uk\/wp-json\/wp\/v2\/projects"}],"about":[{"href":"https:\/\/www.systra.com\/uk\/wp-json\/wp\/v2\/types\/projects"}],"author":[{"embeddable":true,"href":"https:\/\/www.systra.com\/uk\/wp-json\/wp\/v2\/users\/59"}],"version-history":[{"count":3,"href":"https:\/\/www.systra.com\/uk\/wp-json\/wp\/v2\/projects\/9903\/revisions"}],"predecessor-version":[{"id":46277,"href":"https:\/\/www.systra.com\/uk\/wp-json\/wp\/v2\/projects\/9903\/revisions\/46277"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.systra.com\/uk\/wp-json\/wp\/v2\/media\/9192"}],"wp:attachment":[{"href":"https:\/\/www.systra.com\/uk\/wp-json\/wp\/v2\/media?parent=9903"}],"wp:term":[{"taxonomy":"type-market","embeddable":true,"href":"https:\/\/www.systra.com\/uk\/wp-json\/wp\/v2\/type-market?post=9903"},{"taxonomy":"project-market","embeddable":true,"href":"https:\/\/www.systra.com\/uk\/wp-json\/wp\/v2\/project-market?post=9903"},{"taxonomy":"project-service","embeddable":true,"href":"https:\/\/www.systra.com\/uk\/wp-json\/wp\/v2\/project-service?post=9903"},{"taxonomy":"project-location","embeddable":true,"href":"https:\/\/www.systra.com\/uk\/wp-json\/wp\/v2\/project-location?post=9903"},{"taxonomy":"type-service","embeddable":true,"href":"https:\/\/www.systra.com\/uk\/wp-json\/wp\/v2\/type-service?post=9903"},{"taxonomy":"type-solution","embeddable":true,"href":"https:\/\/www.systra.com\/uk\/wp-json\/wp\/v2\/type-solution?post=9903"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}