{"id":11478,"date":"2023-08-30T09:56:12","date_gmt":"2023-08-30T07:56:12","guid":{"rendered":"https:\/\/www.systra.com\/uk\/?post_type=projects&#038;p=11478"},"modified":"2025-02-27T11:45:31","modified_gmt":"2025-02-27T11:45:31","slug":"leeds-station-architecture","status":"publish","type":"projects","link":"https:\/\/www.systra.com\/uk\/project\/leeds-station\/","title":{"rendered":"Leeds Station &#8211; Revitalising Rail Spaces"},"content":{"rendered":"\n<div class=\"wp-block-columns is-layout-flex wp-container-core-columns-is-layout-9d6595d7 wp-block-columns-is-layout-flex\">\n<div class=\"wp-block-column is-layout-flow wp-block-column-is-layout-flow\"><div class=\"content-top-project\">\n    <div class=\"content-top-details\">\n        <svg class=\"icon-sprite details-logo\"><use xlink:href=\"#icon_deco_systra_blanc\" \/>\n        <div class=\"title\">Technical details<\/div>\n        \t        <div class=\"single-content\">\n\t            <div class=\"subtitle\">Customer<\/div>\n\t            <div class=\"desc\">Network Rail<\/div>\n\t        <\/div>\n                    <div class=\"single-content\">\n                <div class=\"subtitle\">Dates<\/div>\n                <div class=\"desc\"><p>2018<\/p>\n<\/div>\n            <\/div>\n                    <div class=\"single-content\">\n                <div class=\"subtitle\">Missions<\/div>\n                <div class=\"desc\">Lead Designer, Architect, Design &amp; Delivery Partner<\/div>\n            <\/div>\n                    <div class=\"single-content\">\n                <div class=\"subtitle\">Localisation<\/div>\n                <div class=\"desc\">Leeds, UK<\/div>\n            <\/div>\n                    <div class=\"single-content\">\n                <div class=\"subtitle\">Partners<\/div>\n                <div class=\"desc\">Colt Construction<\/div>\n            <\/div>\n                    <div class=\"single-content\">\n                <div class=\"subtitle\">Perimeter<\/div>\n                <div class=\"desc\">Architecture, Site Services &amp; Planning, Station &amp; Platform Design, Buildings &amp; Structures<\/div>\n            <\/div>\n                    <div class=\"single-content\">\n                <div class=\"subtitle\">Activity<\/div>\n                <div class=\"desc\">Rail, Transport Hubs &amp; Interchanges<\/div>\n            <\/div>\n           \n            \n    <\/div>\n\n\n\n<div class=\"wp-block-slider-projects\">\n\t\t<div class=\"wrapper-content-slider-projects\">\n\t\t\t<\/div>\n\t<\/div><\/div>\n\n\n\n<div class=\"wp-block-column is-layout-flow wp-block-column-is-layout-flow\">\n<div style=\"height:20px\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n\n\n\n<p class=\"has-dusty-blue-color has-text-color has-medium-font-size\"><strong>SYSTRA worked with Network Rail to deliver architectural design and project management for this ambitious renovation programme for the southern concourse in less than one year.<\/strong><\/p>\n\n\n\n<p>The work involved the reinvention of the late 1960\u2019s wooden roof and updates to the station entrance, Southern concourse retail space, ticket gateline and public WC facilities. New lighting and a gold entrance fa\u00e7ade adds to the passenger experience, and all completed whilst the station remained open to the public 24\/7.<\/p>\n\n\n\n<figure class=\"wp-block-image size-large\"><img decoding=\"async\" width=\"1024\" height=\"576\" src=\"https:\/\/www.systra.com\/uk\/wp-content\/uploads\/sites\/11\/2023\/08\/leeds-station-exterior-systra-header-1024x576.jpg\" alt=\"\" class=\"wp-image-12637\" srcset=\"https:\/\/www.systra.com\/uk\/wp-content\/uploads\/sites\/11\/2023\/08\/leeds-station-exterior-systra-header-1024x576.jpg 1024w, https:\/\/www.systra.com\/uk\/wp-content\/uploads\/sites\/11\/2023\/08\/leeds-station-exterior-systra-header-300x169.jpg 300w, https:\/\/www.systra.com\/uk\/wp-content\/uploads\/sites\/11\/2023\/08\/leeds-station-exterior-systra-header-768x432.jpg 768w, https:\/\/www.systra.com\/uk\/wp-content\/uploads\/sites\/11\/2023\/08\/leeds-station-exterior-systra-header-1536x864.jpg 1536w, https:\/\/www.systra.com\/uk\/wp-content\/uploads\/sites\/11\/2023\/08\/leeds-station-exterior-systra-header-2048x1152.jpg 2048w, https:\/\/www.systra.com\/uk\/wp-content\/uploads\/sites\/11\/2023\/08\/leeds-station-exterior-systra-header-286x160.jpg 286w, https:\/\/www.systra.com\/uk\/wp-content\/uploads\/sites\/11\/2023\/08\/leeds-station-exterior-systra-header-474x266.jpg 474w, https:\/\/www.systra.com\/uk\/wp-content\/uploads\/sites\/11\/2023\/08\/leeds-station-exterior-systra-header-1700x956.jpg 1700w, https:\/\/www.systra.com\/uk\/wp-content\/uploads\/sites\/11\/2023\/08\/leeds-station-exterior-systra-header-1352x761.jpg 1352w, https:\/\/www.systra.com\/uk\/wp-content\/uploads\/sites\/11\/2023\/08\/leeds-station-exterior-systra-header-800x450.jpg 800w, https:\/\/www.systra.com\/uk\/wp-content\/uploads\/sites\/11\/2023\/08\/leeds-station-exterior-systra-header-180x101.jpg 180w, https:\/\/www.systra.com\/uk\/wp-content\/uploads\/sites\/11\/2023\/08\/leeds-station-exterior-systra-header-153x86.jpg 153w, https:\/\/www.systra.com\/uk\/wp-content\/uploads\/sites\/11\/2023\/08\/leeds-station-exterior-systra-header-230x129.jpg 230w\" sizes=\"(max-width: 1024px) 100vw, 1024px\" \/><\/figure>\n\n\n\n<div style=\"height:30px\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n\n\n\n<h3 class=\"wp-block-heading\" id=\"h-bold-vision\">BOLD VISION<\/h3>\n\n\n\n<div style=\"height:20px\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n\n\n\n<p class=\"has-dusty-blue-color has-text-color has-medium-font-size\"><strong>The architecture and engineering team at SYSTRA worked collaboratively, driving an ambitious programme and ensuring that the station renovations went beyond expectations.&nbsp;<\/strong><\/p>\n\n\n\n<p>The project delivered additional design elements to create a wow factor for the 30 million passengers travelling through Leeds every year, delivering an aesthetically pleasing finish and a more secure, future proof station.<\/p>\n\n\n\n<p>To maximise first impressions a gold metal fa\u00e7ade was chosen, a transparent roof was created to allow natural daylight to flood the concourse and human circadian rhythmic lighting was incorporated into the design to mimic natural daylight. Natural lines were created inside the concourse to encourage the \u2018flow of traffic\u2019 through the space, subliminally encouraging passengers to move in the direction of the gateline.<\/p>\n\n\n\n<div style=\"height:20px\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n\n\n\n<div class=\"wp-block-group\"><div class=\"wp-block-group__inner-container is-layout-constrained wp-block-group-is-layout-constrained\">\n<figure class=\"wp-block-gallery has-nested-images columns-default is-cropped wp-block-gallery-1 is-layout-flex wp-block-gallery-is-layout-flex\">\n<figure class=\"wp-block-image size-large\"><img decoding=\"async\" width=\"819\" height=\"1024\" data-id=\"12638\" src=\"https:\/\/www.systra.com\/uk\/wp-content\/uploads\/sites\/11\/2023\/08\/leeds-station-external-night-819x1024.jpg\" alt=\"\" class=\"wp-image-12638\" srcset=\"https:\/\/www.systra.com\/uk\/wp-content\/uploads\/sites\/11\/2023\/08\/leeds-station-external-night-819x1024.jpg 819w, https:\/\/www.systra.com\/uk\/wp-content\/uploads\/sites\/11\/2023\/08\/leeds-station-external-night-240x300.jpg 240w, https:\/\/www.systra.com\/uk\/wp-content\/uploads\/sites\/11\/2023\/08\/leeds-station-external-night-768x961.jpg 768w, https:\/\/www.systra.com\/uk\/wp-content\/uploads\/sites\/11\/2023\/08\/leeds-station-external-night-474x593.jpg 474w, https:\/\/www.systra.com\/uk\/wp-content\/uploads\/sites\/11\/2023\/08\/leeds-station-external-night-800x1001.jpg 800w, https:\/\/www.systra.com\/uk\/wp-content\/uploads\/sites\/11\/2023\/08\/leeds-station-external-night-180x225.jpg 180w, https:\/\/www.systra.com\/uk\/wp-content\/uploads\/sites\/11\/2023\/08\/leeds-station-external-night-153x191.jpg 153w, https:\/\/www.systra.com\/uk\/wp-content\/uploads\/sites\/11\/2023\/08\/leeds-station-external-night-230x288.jpg 230w, https:\/\/www.systra.com\/uk\/wp-content\/uploads\/sites\/11\/2023\/08\/leeds-station-external-night.jpg 1073w\" sizes=\"(max-width: 819px) 100vw, 819px\" \/><\/figure>\n\n\n\n<figure class=\"wp-block-image size-full\"><img decoding=\"async\" width=\"719\" height=\"1000\" data-id=\"12634\" src=\"https:\/\/www.systra.com\/uk\/wp-content\/uploads\/sites\/11\/2023\/08\/leeds-station-interior31.jpg\" alt=\"\" class=\"wp-image-12634\" srcset=\"https:\/\/www.systra.com\/uk\/wp-content\/uploads\/sites\/11\/2023\/08\/leeds-station-interior31.jpg 719w, https:\/\/www.systra.com\/uk\/wp-content\/uploads\/sites\/11\/2023\/08\/leeds-station-interior31-216x300.jpg 216w, https:\/\/www.systra.com\/uk\/wp-content\/uploads\/sites\/11\/2023\/08\/leeds-station-interior31-474x659.jpg 474w, https:\/\/www.systra.com\/uk\/wp-content\/uploads\/sites\/11\/2023\/08\/leeds-station-interior31-180x250.jpg 180w, https:\/\/www.systra.com\/uk\/wp-content\/uploads\/sites\/11\/2023\/08\/leeds-station-interior31-153x213.jpg 153w, https:\/\/www.systra.com\/uk\/wp-content\/uploads\/sites\/11\/2023\/08\/leeds-station-interior31-230x320.jpg 230w\" sizes=\"(max-width: 719px) 100vw, 719px\" \/><\/figure>\n<\/figure>\n<\/div><\/div>\n\n\n\n<div style=\"height:20px\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n\n\n\n<p>With a brief from Network Rail to remove the dark and dated wooden panelling from its roof and \u2018bring in more light\u2019 to the concourse, the project team knew they had their work cut out to transform the space within a 24hr functioning station in just 11 months. To add to the complexity, the brief outlined the requirement for removal of asbestos, electrical cabling and oil-based paint finishes.<\/p>\n\n\n\n<p>The designers team developed a solution using Ethylene Tetrafluoroethylene (ETFE) to allow natural daylight to flood through the roof whilst remaining strong, durable and long lasting. This translucent fluoride-based polymer sheeting offers notable high strength properties over a wide temperature range and high resistance to corrosion. The additional bonus of this material is that it\u2019s light weight and quick to install, making it an ideal solution for the short timescale. The final result sees an impressive pillow design over two tiered levels, providing optimum amounts of light streaming through into the concourse.<\/p>\n\n\n\n<div style=\"height:18px\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n\n\n\n<figure class=\"wp-block-gallery has-nested-images columns-2 is-cropped wp-block-gallery-2 is-layout-flex wp-block-gallery-is-layout-flex\">\n<figure class=\"wp-block-image size-full\"><img decoding=\"async\" width=\"1000\" height=\"667\" data-id=\"12635\" src=\"https:\/\/www.systra.com\/uk\/wp-content\/uploads\/sites\/11\/2023\/08\/rc_tspleeds_final-13full.jpg\" alt=\"\" class=\"wp-image-12635\" srcset=\"https:\/\/www.systra.com\/uk\/wp-content\/uploads\/sites\/11\/2023\/08\/rc_tspleeds_final-13full.jpg 1000w, https:\/\/www.systra.com\/uk\/wp-content\/uploads\/sites\/11\/2023\/08\/rc_tspleeds_final-13full-300x200.jpg 300w, https:\/\/www.systra.com\/uk\/wp-content\/uploads\/sites\/11\/2023\/08\/rc_tspleeds_final-13full-768x512.jpg 768w, https:\/\/www.systra.com\/uk\/wp-content\/uploads\/sites\/11\/2023\/08\/rc_tspleeds_final-13full-375x250.jpg 375w, https:\/\/www.systra.com\/uk\/wp-content\/uploads\/sites\/11\/2023\/08\/rc_tspleeds_final-13full-376x250.jpg 376w, https:\/\/www.systra.com\/uk\/wp-content\/uploads\/sites\/11\/2023\/08\/rc_tspleeds_final-13full-474x316.jpg 474w, https:\/\/www.systra.com\/uk\/wp-content\/uploads\/sites\/11\/2023\/08\/rc_tspleeds_final-13full-75x50.jpg 75w, https:\/\/www.systra.com\/uk\/wp-content\/uploads\/sites\/11\/2023\/08\/rc_tspleeds_final-13full-900x600.jpg 900w, https:\/\/www.systra.com\/uk\/wp-content\/uploads\/sites\/11\/2023\/08\/rc_tspleeds_final-13full-800x534.jpg 800w, https:\/\/www.systra.com\/uk\/wp-content\/uploads\/sites\/11\/2023\/08\/rc_tspleeds_final-13full-180x120.jpg 180w, https:\/\/www.systra.com\/uk\/wp-content\/uploads\/sites\/11\/2023\/08\/rc_tspleeds_final-13full-153x102.jpg 153w, https:\/\/www.systra.com\/uk\/wp-content\/uploads\/sites\/11\/2023\/08\/rc_tspleeds_final-13full-230x153.jpg 230w\" sizes=\"(max-width: 1000px) 100vw, 1000px\" \/><\/figure>\n\n\n\n<figure class=\"wp-block-image size-full\"><img decoding=\"async\" width=\"1000\" height=\"667\" data-id=\"12636\" src=\"https:\/\/www.systra.com\/uk\/wp-content\/uploads\/sites\/11\/2023\/08\/leeds-interior-schedule-board-1.jpg\" alt=\"\" class=\"wp-image-12636\" srcset=\"https:\/\/www.systra.com\/uk\/wp-content\/uploads\/sites\/11\/2023\/08\/leeds-interior-schedule-board-1.jpg 1000w, https:\/\/www.systra.com\/uk\/wp-content\/uploads\/sites\/11\/2023\/08\/leeds-interior-schedule-board-1-300x200.jpg 300w, https:\/\/www.systra.com\/uk\/wp-content\/uploads\/sites\/11\/2023\/08\/leeds-interior-schedule-board-1-768x512.jpg 768w, https:\/\/www.systra.com\/uk\/wp-content\/uploads\/sites\/11\/2023\/08\/leeds-interior-schedule-board-1-375x250.jpg 375w, https:\/\/www.systra.com\/uk\/wp-content\/uploads\/sites\/11\/2023\/08\/leeds-interior-schedule-board-1-376x250.jpg 376w, https:\/\/www.systra.com\/uk\/wp-content\/uploads\/sites\/11\/2023\/08\/leeds-interior-schedule-board-1-474x316.jpg 474w, https:\/\/www.systra.com\/uk\/wp-content\/uploads\/sites\/11\/2023\/08\/leeds-interior-schedule-board-1-75x50.jpg 75w, https:\/\/www.systra.com\/uk\/wp-content\/uploads\/sites\/11\/2023\/08\/leeds-interior-schedule-board-1-900x600.jpg 900w, https:\/\/www.systra.com\/uk\/wp-content\/uploads\/sites\/11\/2023\/08\/leeds-interior-schedule-board-1-800x534.jpg 800w, https:\/\/www.systra.com\/uk\/wp-content\/uploads\/sites\/11\/2023\/08\/leeds-interior-schedule-board-1-180x120.jpg 180w, https:\/\/www.systra.com\/uk\/wp-content\/uploads\/sites\/11\/2023\/08\/leeds-interior-schedule-board-1-153x102.jpg 153w, https:\/\/www.systra.com\/uk\/wp-content\/uploads\/sites\/11\/2023\/08\/leeds-interior-schedule-board-1-230x153.jpg 230w\" sizes=\"(max-width: 1000px) 100vw, 1000px\" \/><\/figure>\n\n\n\n<figure class=\"wp-block-image size-full\"><img decoding=\"async\" width=\"1000\" height=\"667\" data-id=\"12639\" src=\"https:\/\/www.systra.com\/uk\/wp-content\/uploads\/sites\/11\/2023\/08\/leeds-station-interior1-2.jpg\" alt=\"\" class=\"wp-image-12639\" srcset=\"https:\/\/www.systra.com\/uk\/wp-content\/uploads\/sites\/11\/2023\/08\/leeds-station-interior1-2.jpg 1000w, https:\/\/www.systra.com\/uk\/wp-content\/uploads\/sites\/11\/2023\/08\/leeds-station-interior1-2-300x200.jpg 300w, https:\/\/www.systra.com\/uk\/wp-content\/uploads\/sites\/11\/2023\/08\/leeds-station-interior1-2-768x512.jpg 768w, https:\/\/www.systra.com\/uk\/wp-content\/uploads\/sites\/11\/2023\/08\/leeds-station-interior1-2-375x250.jpg 375w, https:\/\/www.systra.com\/uk\/wp-content\/uploads\/sites\/11\/2023\/08\/leeds-station-interior1-2-376x250.jpg 376w, https:\/\/www.systra.com\/uk\/wp-content\/uploads\/sites\/11\/2023\/08\/leeds-station-interior1-2-474x316.jpg 474w, https:\/\/www.systra.com\/uk\/wp-content\/uploads\/sites\/11\/2023\/08\/leeds-station-interior1-2-75x50.jpg 75w, https:\/\/www.systra.com\/uk\/wp-content\/uploads\/sites\/11\/2023\/08\/leeds-station-interior1-2-900x600.jpg 900w, https:\/\/www.systra.com\/uk\/wp-content\/uploads\/sites\/11\/2023\/08\/leeds-station-interior1-2-800x534.jpg 800w, https:\/\/www.systra.com\/uk\/wp-content\/uploads\/sites\/11\/2023\/08\/leeds-station-interior1-2-180x120.jpg 180w, https:\/\/www.systra.com\/uk\/wp-content\/uploads\/sites\/11\/2023\/08\/leeds-station-interior1-2-153x102.jpg 153w, https:\/\/www.systra.com\/uk\/wp-content\/uploads\/sites\/11\/2023\/08\/leeds-station-interior1-2-230x153.jpg 230w\" sizes=\"(max-width: 1000px) 100vw, 1000px\" \/><\/figure>\n<\/figure>\n\n\n\n<div style=\"height:30px\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n\n\n\n<p class=\"has-noir-color has-text-color has-medium-font-size\"><\/p>\n\n\n\n<h3 class=\"wp-block-heading\" id=\"h-let-there-be-light\">LET THERE BE LIGHT<\/h3>\n\n\n\n<div style=\"height:20px\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n\n\n\n<p>In addition to the transparent roof, the team knew that on a dull overcast day, natural light would not deliver the full effect of the teams vision. To overcome this, the design incorporated a first for the railways by using a new lighting system, Human Circadian Rhythm Lighting (HCRL). Previously only used in the UK in a handful of care establishments, such as hospitals, HCRL mimics the light patterns of natural daylight with a cooler white light in the mornings and warmer yellow light in the evenings.<\/p>\n\n\n\n<p>The technology behind the new lighting identifies with the human body\u2019s need for rhythmic light patterns akin to the changing daily natural light cycles. In doing so, HCRL allows passengers to experience the same effect inside the station as that of the natural light patterns, resulting in the body clock remaining in sync and encouraging positive moods.<\/p>\n<\/div>\n<\/div>\n\n\n\n<div class=\"wp-block-group who-pattern-content-feed\"><div class=\"wp-block-group__inner-container is-layout-constrained wp-block-group-is-layout-constrained\">\n<div class=\"wp-block-columns is-layout-flex wp-container-core-columns-is-layout-9d6595d7 wp-block-columns-is-layout-flex\">\n<div class=\"wp-block-column is-layout-flow wp-block-column-is-layout-flow\" style=\"flex-basis:50%\">\n    <div class=\"who-block-content-feed\">\n        \n\t\t<div class=\"tile tile--markets \">\n\t\t<figure class=\"tile__thumbnail\">\n\t\t\t<img decoding=\"async\" width=\"1024\" height=\"645\" src=\"https:\/\/www.systra.com\/uk\/wp-content\/uploads\/sites\/11\/2023\/05\/l3-markets-transport-hubs-website-header-1024x645.jpg\" class=\"attachment-large size-large wp-post-image\" alt=\"markets-transport-hubs-website-header\" \/>\n\t\t\t<figcaption class=\"tile__content\">\n\t\t\t\t\t\t\t\t\t<ul class=\"tile__tag__wrapper\">\n\t\t\t\t\t\t<li class=\"tile__tag\">\n\t\t\t\t\t\t\tmarkets\t\t\t\t\t\t<\/li>\n\t\t\t\t\t<\/ul>\n\t\t\t\t\t\t\t\t<h3 class=\"tile__title\" style=\"color:#fff !important\">Transport Hubs &amp; Interchanges<\/h3>\n\n\t\t\t\t<a class=\"tile__link\" href=\"https:\/\/www.systra.com\/uk\/markets\/cities-urban-mobility\/transport-hubs-interchanges\/\">\n\t\t\t\t\tRead more\t\t\t\t\t<span class=\"screen-reader-text\"> sur Transport Hubs &amp; Interchanges<\/span>\n\t\t\t\t<\/a>\n\t\t\t<\/figcaption>\n\t\t<\/figure>\n\t<\/div>\n    <\/div>\n<\/div>\n\n\n\n<div class=\"wp-block-column is-layout-flow wp-block-column-is-layout-flow\" style=\"flex-basis:50%\">\n    <div class=\"who-block-content-feed\">\n        \n\t\t<div class=\"tile tile--services \">\n\t\t<figure class=\"tile__thumbnail\">\n\t\t\t<img decoding=\"async\" width=\"1024\" height=\"567\" src=\"https:\/\/www.systra.com\/uk\/wp-content\/uploads\/sites\/11\/2023\/08\/architect-team2-1024x567.jpg\" class=\"attachment-large size-large wp-post-image\" alt=\"\" \/>\n\t\t\t<figcaption class=\"tile__content\">\n\t\t\t\t\t\t\t\t\t<ul class=\"tile__tag__wrapper\">\n\t\t\t\t\t\t<li class=\"tile__tag\">\n\t\t\t\t\t\t\tservices\t\t\t\t\t\t<\/li>\n\t\t\t\t\t<\/ul>\n\t\t\t\t\t\t\t\t<h3 class=\"tile__title\" style=\"color:#fff !important\">Architecture<\/h3>\n\n\t\t\t\t<a class=\"tile__link\" href=\"https:\/\/www.systra.com\/uk\/services\/infrastructure-engineering\/architecture\/\">\n\t\t\t\t\tRead more\t\t\t\t\t<span class=\"screen-reader-text\"> sur Architecture<\/span>\n\t\t\t\t<\/a>\n\t\t\t<\/figcaption>\n\t\t<\/figure>\n\t<\/div>\n    <\/div>\n<\/div>\n\n\n\n<div class=\"wp-block-column is-layout-flow wp-block-column-is-layout-flow\" style=\"flex-basis:50%\">\n    <div class=\"who-block-content-feed\">\n        \n\t\t<div class=\"tile tile--services \">\n\t\t<figure class=\"tile__thumbnail\">\n\t\t\t<img decoding=\"async\" width=\"1024\" height=\"645\" src=\"https:\/\/www.systra.com\/uk\/wp-content\/uploads\/sites\/11\/2023\/07\/artboard-8-1024x645.jpg\" class=\"attachment-large size-large wp-post-image\" alt=\"\" \/>\n\t\t\t<figcaption class=\"tile__content\">\n\t\t\t\t\t\t\t\t\t<ul class=\"tile__tag__wrapper\">\n\t\t\t\t\t\t<li class=\"tile__tag\">\n\t\t\t\t\t\t\tservices\t\t\t\t\t\t<\/li>\n\t\t\t\t\t<\/ul>\n\t\t\t\t\t\t\t\t<h3 class=\"tile__title\" style=\"color:#fff !important\">Station and Platform Design<\/h3>\n\n\t\t\t\t<a class=\"tile__link\" href=\"https:\/\/www.systra.com\/uk\/services\/infrastructure-engineering\/station-platform-design\/\">\n\t\t\t\t\tRead more\t\t\t\t\t<span class=\"screen-reader-text\"> sur Station and Platform Design<\/span>\n\t\t\t\t<\/a>\n\t\t\t<\/figcaption>\n\t\t<\/figure>\n\t<\/div>\n    <\/div>\n<\/div>\n<\/div>\n<\/div><\/div>\n\n\n\n<div style=\"height:39px\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n\n\n\n<div class=\"wp-block-group\"><div class=\"wp-block-group__inner-container is-layout-constrained wp-block-group-is-layout-constrained\">\n<div class=\"wp-block-buttons is-layout-flex wp-block-buttons-is-layout-flex\">\n<div class=\"wp-block-button has-custom-width wp-block-button__width-100\"><a class=\"wp-block-button__link has-dirty-purple-color has-pale-mauve-background-color has-text-color has-background has-link-color wp-element-button\" href=\"https:\/\/www.systra.com\/uk\/register\/join-our-community\/\">JOIN OUR COMMUNITY<\/a><\/div>\n<\/div>\n<\/div><\/div>\n\n\n\n<div style=\"height:39px\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n","protected":false},"author":59,"featured_media":12640,"parent":0,"template":"","type-market":[73],"project-market":[],"project-service":[],"project-location":[],"type-service":[],"type-solution":[],"class_list":["post-11478","projects","type-projects","status-publish","has-post-thumbnail","hentry","type-market-cities-urban-mobility"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v27.4 (Yoast SEO v27.4) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>Leeds Train Station - Transport Architecture - SYSTRA UK<\/title>\n<meta name=\"description\" content=\"SYSTRA worked with Network Rail to deliver architectural design and project management of this ambitious renovation programme for the southern concourse in less than one year.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<meta property=\"og:locale\" content=\"en_GB\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Leeds Station - Revitalising Rail Spaces\" \/>\n<meta property=\"og:description\" content=\"SYSTRA worked with Network Rail to deliver architectural design and project management of this ambitious renovation programme for the southern concourse in less than one year.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.systra.com\/uk\/project\/leeds-station\/\" \/>\n<meta property=\"og:site_name\" content=\"SYSTRA UK\" \/>\n<meta property=\"article:modified_time\" content=\"2025-02-27T11:45:31+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/www.systra.com\/uk\/wp-content\/uploads\/sites\/11\/2023\/08\/leeds-station-exterior-systra-1024x645.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"1024\" \/>\n\t<meta property=\"og:image:height\" content=\"645\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:site\" content=\"@SYSTRA_LTD\" \/>\n<meta name=\"twitter:label1\" content=\"Estimated reading time\" \/>\n\t<meta name=\"twitter:data1\" content=\"4 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.systra.com\\\/uk\\\/project\\\/leeds-station\\\/\",\"url\":\"https:\\\/\\\/www.systra.com\\\/uk\\\/project\\\/leeds-station\\\/\",\"name\":\"Leeds Train Station - Transport Architecture - SYSTRA UK\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.systra.com\\\/uk\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/www.systra.com\\\/uk\\\/project\\\/leeds-station\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/www.systra.com\\\/uk\\\/project\\\/leeds-station\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/www.systra.com\\\/uk\\\/wp-content\\\/uploads\\\/sites\\\/11\\\/2023\\\/08\\\/leeds-station-exterior-systra.jpg\",\"datePublished\":\"2023-08-30T07:56:12+00:00\",\"dateModified\":\"2025-02-27T11:45:31+00:00\",\"description\":\"SYSTRA worked with Network Rail to deliver architectural design and project management of this ambitious renovation programme for the southern concourse in less than one year.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.systra.com\\\/uk\\\/project\\\/leeds-station\\\/#breadcrumb\"},\"inLanguage\":\"en-GB\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/www.systra.com\\\/uk\\\/project\\\/leeds-station\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-GB\",\"@id\":\"https:\\\/\\\/www.systra.com\\\/uk\\\/project\\\/leeds-station\\\/#primaryimage\",\"url\":\"https:\\\/\\\/www.systra.com\\\/uk\\\/wp-content\\\/uploads\\\/sites\\\/11\\\/2023\\\/08\\\/leeds-station-exterior-systra.jpg\",\"contentUrl\":\"https:\\\/\\\/www.systra.com\\\/uk\\\/wp-content\\\/uploads\\\/sites\\\/11\\\/2023\\\/08\\\/leeds-station-exterior-systra.jpg\",\"width\":2380,\"height\":1500},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.systra.com\\\/uk\\\/project\\\/leeds-station\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/www.systra.com\\\/uk\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Projects\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.systra.com\\\/uk\\\/#website\",\"url\":\"https:\\\/\\\/www.systra.com\\\/uk\\\/\",\"name\":\"SYSTRA UK\",\"description\":\"\",\"publisher\":{\"@id\":\"https:\\\/\\\/www.systra.com\\\/uk\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/www.systra.com\\\/uk\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-GB\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/www.systra.com\\\/uk\\\/#organization\",\"name\":\"SYSTRA UK\",\"url\":\"https:\\\/\\\/www.systra.com\\\/uk\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-GB\",\"@id\":\"https:\\\/\\\/www.systra.com\\\/uk\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/www.systra.com\\\/uk\\\/wp-content\\\/uploads\\\/sites\\\/11\\\/2023\\\/07\\\/systra-logo.jpg\",\"contentUrl\":\"https:\\\/\\\/www.systra.com\\\/uk\\\/wp-content\\\/uploads\\\/sites\\\/11\\\/2023\\\/07\\\/systra-logo.jpg\",\"width\":400,\"height\":400,\"caption\":\"SYSTRA UK\"},\"image\":{\"@id\":\"https:\\\/\\\/www.systra.com\\\/uk\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"sameAs\":[\"https:\\\/\\\/x.com\\\/SYSTRA_LTD\",\"https:\\\/\\\/uk.linkedin.com\\\/company\\\/systra_ltd\"]}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"Leeds Train Station - Transport Architecture - SYSTRA UK","description":"SYSTRA worked with Network Rail to deliver architectural design and project management of this ambitious renovation programme for the southern concourse in less than one year.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"og_locale":"en_GB","og_type":"article","og_title":"Leeds Station - Revitalising Rail Spaces","og_description":"SYSTRA worked with Network Rail to deliver architectural design and project management of this ambitious renovation programme for the southern concourse in less than one year.","og_url":"https:\/\/www.systra.com\/uk\/project\/leeds-station\/","og_site_name":"SYSTRA UK","article_modified_time":"2025-02-27T11:45:31+00:00","og_image":[{"width":1024,"height":645,"url":"https:\/\/www.systra.com\/uk\/wp-content\/uploads\/sites\/11\/2023\/08\/leeds-station-exterior-systra-1024x645.jpg","type":"image\/jpeg"}],"twitter_card":"summary_large_image","twitter_site":"@SYSTRA_LTD","twitter_misc":{"Estimated reading time":"4 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/www.systra.com\/uk\/project\/leeds-station\/","url":"https:\/\/www.systra.com\/uk\/project\/leeds-station\/","name":"Leeds Train Station - Transport Architecture - SYSTRA UK","isPartOf":{"@id":"https:\/\/www.systra.com\/uk\/#website"},"primaryImageOfPage":{"@id":"https:\/\/www.systra.com\/uk\/project\/leeds-station\/#primaryimage"},"image":{"@id":"https:\/\/www.systra.com\/uk\/project\/leeds-station\/#primaryimage"},"thumbnailUrl":"https:\/\/www.systra.com\/uk\/wp-content\/uploads\/sites\/11\/2023\/08\/leeds-station-exterior-systra.jpg","datePublished":"2023-08-30T07:56:12+00:00","dateModified":"2025-02-27T11:45:31+00:00","description":"SYSTRA worked with Network Rail to deliver architectural design and project management of this ambitious renovation programme for the southern concourse in less than one year.","breadcrumb":{"@id":"https:\/\/www.systra.com\/uk\/project\/leeds-station\/#breadcrumb"},"inLanguage":"en-GB","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.systra.com\/uk\/project\/leeds-station\/"]}]},{"@type":"ImageObject","inLanguage":"en-GB","@id":"https:\/\/www.systra.com\/uk\/project\/leeds-station\/#primaryimage","url":"https:\/\/www.systra.com\/uk\/wp-content\/uploads\/sites\/11\/2023\/08\/leeds-station-exterior-systra.jpg","contentUrl":"https:\/\/www.systra.com\/uk\/wp-content\/uploads\/sites\/11\/2023\/08\/leeds-station-exterior-systra.jpg","width":2380,"height":1500},{"@type":"BreadcrumbList","@id":"https:\/\/www.systra.com\/uk\/project\/leeds-station\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.systra.com\/uk"},{"@type":"ListItem","position":2,"name":"Projects"}]},{"@type":"WebSite","@id":"https:\/\/www.systra.com\/uk\/#website","url":"https:\/\/www.systra.com\/uk\/","name":"SYSTRA UK","description":"","publisher":{"@id":"https:\/\/www.systra.com\/uk\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.systra.com\/uk\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-GB"},{"@type":"Organization","@id":"https:\/\/www.systra.com\/uk\/#organization","name":"SYSTRA UK","url":"https:\/\/www.systra.com\/uk\/","logo":{"@type":"ImageObject","inLanguage":"en-GB","@id":"https:\/\/www.systra.com\/uk\/#\/schema\/logo\/image\/","url":"https:\/\/www.systra.com\/uk\/wp-content\/uploads\/sites\/11\/2023\/07\/systra-logo.jpg","contentUrl":"https:\/\/www.systra.com\/uk\/wp-content\/uploads\/sites\/11\/2023\/07\/systra-logo.jpg","width":400,"height":400,"caption":"SYSTRA UK"},"image":{"@id":"https:\/\/www.systra.com\/uk\/#\/schema\/logo\/image\/"},"sameAs":["https:\/\/x.com\/SYSTRA_LTD","https:\/\/uk.linkedin.com\/company\/systra_ltd"]}]}},"lang":"en","translations":{"en":11478},"pll_sync_post":[],"_links":{"self":[{"href":"https:\/\/www.systra.com\/uk\/wp-json\/wp\/v2\/projects\/11478","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.systra.com\/uk\/wp-json\/wp\/v2\/projects"}],"about":[{"href":"https:\/\/www.systra.com\/uk\/wp-json\/wp\/v2\/types\/projects"}],"author":[{"embeddable":true,"href":"https:\/\/www.systra.com\/uk\/wp-json\/wp\/v2\/users\/59"}],"version-history":[{"count":4,"href":"https:\/\/www.systra.com\/uk\/wp-json\/wp\/v2\/projects\/11478\/revisions"}],"predecessor-version":[{"id":60391,"href":"https:\/\/www.systra.com\/uk\/wp-json\/wp\/v2\/projects\/11478\/revisions\/60391"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.systra.com\/uk\/wp-json\/wp\/v2\/media\/12640"}],"wp:attachment":[{"href":"https:\/\/www.systra.com\/uk\/wp-json\/wp\/v2\/media?parent=11478"}],"wp:term":[{"taxonomy":"type-market","embeddable":true,"href":"https:\/\/www.systra.com\/uk\/wp-json\/wp\/v2\/type-market?post=11478"},{"taxonomy":"project-market","embeddable":true,"href":"https:\/\/www.systra.com\/uk\/wp-json\/wp\/v2\/project-market?post=11478"},{"taxonomy":"project-service","embeddable":true,"href":"https:\/\/www.systra.com\/uk\/wp-json\/wp\/v2\/project-service?post=11478"},{"taxonomy":"project-location","embeddable":true,"href":"https:\/\/www.systra.com\/uk\/wp-json\/wp\/v2\/project-location?post=11478"},{"taxonomy":"type-service","embeddable":true,"href":"https:\/\/www.systra.com\/uk\/wp-json\/wp\/v2\/type-service?post=11478"},{"taxonomy":"type-solution","embeddable":true,"href":"https:\/\/www.systra.com\/uk\/wp-json\/wp\/v2\/type-solution?post=11478"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}