---
title: Achieving BREEAM Assessment Excellent rating for Parc Adfer energy from waste facility in North Wales
url: "https://www.systra.com/uk/project/achieving-breeam-assessment-excellent-rating-for-parc-adfer-energy-from-waste-facility-in-north-wales/"
type: projects
date_published: 2026-06-23
date_modified: 2026-06-23
schema:
  @type: WebPage
language: en-GB
word_count: 823
reading_time: 5 min
canonical: "https://www.systra.com/uk/project/achieving-breeam-assessment-excellent-rating-for-parc-adfer-energy-from-waste-facility-in-north-wales/"
featured_image: "https://www.systra.com/uk/wp-content/uploads/sites/11/2026/06/parc-adfer-header.jpg"
type-market:
  - "Energy &amp; Power"
project-market:
  - "Energy &amp; Power"
  - Energy Recovery
  - Environment
project-location:
  - Wales
---

# Achieving BREEAM Assessment Excellent rating for Parc Adfer energy from waste facility in North Wales

![Sunset over Parc Adfer Energy Recovery Facility](https://www.systra.com/uk/wp-content/uploads/sites/11/2026/06/parc-adfer-header.jpg)

### Energy from waste facility targets BREEAM Excellent rating

Parc Adfer is an energy from waste facility located in Deeside, North Wales,
designed to process unrecyclable waste and convert it into energy, thereby
reducing landfill use and generating electricity. It processes up to 232,000 
tonnes of waste per year and generates enough electricity to power more than
45,000 homes. 

From the outset, [enfinium ](https://enfinium.co.uk/)– one of the UK’s leading
energy-from-waste operators – was committed to creating a facility that achieved
a BREEAM Excellent rating for sustainability performance. BREEAM is the world’s
leading
[sustainability assessmen](https://www.systra.com/uk/services/environmental-services/sustainable-development/)
t method for the built environment, providing widely recognised third-party
certification of an asset’s environmental, social and economic sustainability
performance.  

As a BREEAM licensed assessor company, SYSTRA was appointed by the project’s
engineering, procurement, and construction (EPC) contractor, CNIM UK, to manage
the formal BREEAM assessment process for Parc Adfer.

![Parc Adfer energy-recovery plant in Wales](https://www.systra.com/uk/wp-content/uploads/sites/11/2026/06/park-adfer-2-1024x576.jpg)

_© enfinium_

### BREEAM criteria integrated at every stage of design and build 

The Parc Adfer development was classed as a BREEAM “bespoke” project, meaning it
would be assessed using customised criteria, tailored to the project’s unique
use and sustainability opportunities.  

SYSTRA worked in close collaboration with key individuals from the client and
contractor teams to integrate relevant BREEAM requirements into the design and
build process. Our work included understanding and identifying any risks and 
opportunities, and helping to make the assessment process as straightforward as
possible.  

Our BREEAM specialists provided technical support, guidance and feedback on
BREEAM criteria and the evidence required to meet them throughout all stages of
the project. Our advice ensured that sustainable measures for the proposed
development were successfully incorporated into the design from an early stage,
and that all project documentation was aligned with relevant BREEAM standards. 

### Well-defined roles and responsibilities keep performance on track

To establish a clear set of actions and targets for all parties, our BREEAM
Assessor led a pre-assessment workshop with the client, contractor and design
teams to review baseline information and define roles and responsibilities. 

Working alongside all project teams, we held regular progress meetings to review
the status of key assessment criteria and monitor progress against BREEAM
performance indicators. These regular meetings enabled queries to be raised as
the project progressed, and any issues or constraints to be identified and
addressed in good time. 

![Waste lorry arriving at the Parc Adfer facility](https://www.systra.com/uk/wp-content/uploads/sites/11/2026/06/park-adfer-1-1024x576.jpg)

_© enfinium_

### BREEAM Excellent rating achieved with zero non-conformances

The proactive and thorough approach adopted by SYSTRA led to both the design
stage and post-construction stage achieving certification ahead of programme. 
What’s more, there were zero observations, queries or non-conformances raised in
the final BREEAM assessment report.  

The completed development achieved its target BREEAM rating of Excellent with a
final assessment score of 73.8%.

We’d love to help with your next project

[Connect with our Specialists](https://www.systra.com/uk/contact/business/)

![Sheffield Supertram in Sheffield city centre](https://www.systra.com/uk/wp-content/uploads/sites/11/2025/09/mass-transit-header-1024x645.jpg)

_Our Markets Read more sur Our Markets_

![l1-service-website-third-off-header](https://www.systra.com/uk/wp-content/uploads/sites/11/2023/06/l1-service-website-third-off-header-1024x430.jpg)

_Our Services Read more sur Our Services_

![Leeds Energy from Waste Facility](https://www.systra.com/uk/wp-content/uploads/sites/11/2023/05/l3-markets-ev-energy-from-waste-website-header-1024x645.jpg)

_markets Energy Recovery Read more sur Energy Recovery_

![Leeds Recycling & Energy Recovery Facility (RERF)](https://www.systra.com/uk/wp-content/uploads/sites/11/2023/05/energy_header-1024x645.jpg)

_markets Energy Read more sur Energy_

![Leeds Recycling & Energy Recovery Facility (RERF)](https://www.systra.com/uk/wp-content/uploads/sites/11/2023/06/leeds-energy-from-waste_150702-934-2-1024x784.jpg)

_projects Leeds Recycling & Energy Recovery Facility (RERF) Read more sur Leeds Recycling & Energy Recovery Facility (RERF)_

[JOIN OUR COMMUNITY](https://www.systra.com/uk/register/join-our-community/)

Some examples of projects in Energy & Power, Energy Recovery, Environment

[  Transport Decarbonisation Strategy for Dalton Industrial Estate ](https://www.systra.com/uk/project/transport-decarbonisation-strategy-for-dalton-industrial-estate/)
[  Kidston Pumped Hydro: ECI Risk Review for Renewable Energy ](https://www.systra.com/uk/project/kidston-pumped-hydro-eci-risk-review-for-renewable-energy/)
[  Peak EV Charging demand study for the Climate Change Committee ](https://www.systra.com/uk/project/peak-ev-charging-demand-study-for-the-climate-change-committee/)
[  Leeds Recycling & Energy Recovery Facility (RERF) ](https://www.systra.com/uk/project/leeds-rerf/)
[  The London Resort: Environmental Insights for National Highways ](https://www.systra.com/uk/project/the-london-resort-environmental-insights-for-national-highways/)

[ See a selection of SYSTRA's projects ](https://www.systra.com/uk/project/the-london-resort-environmental-insights-for-national-highways/)