Metros<\/div>\n <\/div>\n \n \n <\/div>\n<\/div>\n\n\n\n
\n
Connecting Istanbul\u2019s Asian Side<\/strong><\/p>\n\n\n\n<\/div>\n\n\n\n
Spanning 13 km, this metro line M12 links the north and south of Istanbul\u2019s Asian side with 11 underground stations, a dedicated stabling area, and integration with the M8 line. The project utilizes advanced systems engineering and the Go4 System to support rapid transit across the city.<\/p>\n\n\n\n
<\/div>\n\n\n\n
main features<\/h2>\n\n\n\n<\/div>\n\n\n\n
\n- Line length = 13 km<\/li>\n\n\n\n
- Stabling underground (6 tracks)<\/li>\n\n\n\n
- Transfer track with line M8<\/li>\n\n\n\n
- 11 Underground Stations<\/li>\n\n\n\n
- Go4 System<\/li>\n<\/ul>\n\n\n\n
<\/div>\n\n\n\n
<\/figure>\n\n\n\n<\/div>\n\n\n\n
<\/figure>\n<\/div>\n<\/div>\n","protected":false},"author":103,"featured_media":878,"parent":0,"template":"","type-market":[],"project-market":[48],"project-service":[55],"project-location":[],"type-service":[],"type-solution":[],"class_list":["post-755","projects","type-projects","status-publish","has-post-thumbnail","hentry","project-market-metros","project-service-system-egineering"],"acf":[],"yoast_head":"\n\u00dcmraniye \u2013 Ata\u015fehir \u2013 G\u00f6ztepe Metro, \u0130stanbul - T\u00fcrkiye<\/title>\n\n\n\n\n\n\n\n\n\n\t\n\t\n\t\n\n\n\t\n