---
title: "Human-Centered Design: A New Era for Sydney&#8217;s Rail Operations Centre"
url: "https://www.systra.com/ireland/project/human-centered-design-a-new-era-for-sydneys-rail-operations-centre/"
type: projects
date_published: 2025-04-16
date_modified: 2026-05-06
schema:
  @type: WebPage
language: en-IE
word_count: 742
reading_time: 4 min
canonical: "https://www.systra.com/ireland/project/human-centered-design-a-new-era-for-sydneys-rail-operations-centre/"
featured_image: "https://www.systra.com/ireland/wp-content/uploads/sites/24/2025/04/sydney-rail-operations-centre-1024x645-1.jpg"
type-market:
  - "Cities &amp; Urban Mobility"
type-service:
  - Systems Approach
---

# Human-Centered Design: A New Era for Sydney’s Rail Operations Centre

![Human-Centered Design: A New Era for Sydney’s Rail Operations Centre](https://www.systra.com/ireland/wp-content/uploads/sites/24/2025/04/sydney-rail-operations-centre-1024x645-1.jpg)

The New South Wales Government in Sydney recently opened a Rail Operations
Centre (ROC) to modernise the control of Sydney’s rail network by amalgamating
six control centres into one new state of the art facility.

### Overcoming Integration Challenges in Rail Operations

The Rail Operations Centre brings together a number of different roles and a
variety of different systems into a single location, improving train service
management, incident response and information to passengers.

In addition to the challenges associated with the introduction of the ROC,
Sydney Trains introduced a new operating model to maximise the benefits of the
new facility. SYSTRA personnel supported this change as part of the enabling
project, Network Operations Reform (NOR). The NOR project established an interim
operating state within the legacy Rail Management Centre (RMC), this included
the introduction of a new organisational structure, new roles and operating
procedures.

_Video from SBS – Australian public broadcast service_

### Human Centered Design process & system integrations

[SYSTRA human factors](https://www.systra.com/ireland/services/systems-approach/human-factors-ergonomics-in-transport/)
specialists defined and managed the Human Factors Integration (HFI) activities
for the ROC technologies, operating model and control systems. We facilitated a
human centred design process to identify end-user needs early in the design, and
an iterative design and testing approach to ensure the best possible fit between
new technology and its end-users.

We employed a range of techniques to elicit end-user requirements throughout the
design process. Observations and interviews with end-users were complemented by
Day in the Life Of workshops and mock-up prototype reviews. Findings and
end-user feedback was captured and used to generate system requirement. We led
human factors System Integration Testing activities to evaluate user interfaces
and operational process and demonstrate compliance with system requirements.

SYSTRA human factors specialists interfaced with operational readiness personnel
to ensure Human Factors issues and risks were adequately addressed by procedures
and training.

### Enhanced User Experience and Operational Efficiency

Our early involvement in the Rail Operation Centre projects, and our involvement
in the enabling NOR project, enabled us to embed human factors principles within
every aspect of the ROC concept. We led consultations with end-users to ensure
their needs were captured as system requirements and provided a participatory
ergonomics forum in which the end-users engaged and took ownership of the
project.

We followed a human centred design process to review concept solutions with
end-user and stakeholder representatives. Each solution was assessed upon its
ability to deliver business benefits, fulfil end-user requirements, and to
demonstrate error tolerance and operating efficiency. The iterative design and
testing approach enabled us to identify emergent user requirements and to
develop and refine designs in response to end-user needs.

We’d love to help with your next project

[Connect with our specialists](https://www.systra.com/ireland/contact/business/)

![LUAS tram in Dublin street with flowers in the foreground](https://www.systra.com/ireland/wp-content/uploads/sites/24/2023/05/mass-transit-ireland-1024x645.jpg)

_Our Markets Read more sur Our Markets_

![l1-service-website-third-off-header](https://www.systra.com/ireland/wp-content/uploads/sites/24/2023/06/l1-service-website-third-off-header.jpg)

_Our Services Read more sur Our Services_

![risk-at-level-crossings-header-and-featured-image](https://www.systra.com/ireland/wp-content/uploads/sites/24/2024/06/risk-at-level-crossings-header-and-featured-image-1024x645.png)

- Expert Insights

Dr Teodora STEFANOVA

### Risk at level crossings – the role of personal and collective responsibility towards safety

[ Read more ](https://www.systra.com/ireland/expert_insights/risk-at-level-crossings-the-role-of-personal-and-collective-responsibility-towards-safety/)

![UK electric train from above overhead wires. It is autumn and the foliage around the tracks is orange and brown.](https://www.systra.com/ireland/wp-content/uploads/sites/24/2025/04/featured-image-managing-operational-change-for-electrification-projects-1024x645.png)

- Expert Insights

Charlotte KAUL

### Managing operational change for electrification projects

[ Read more ](https://www.systra.com/ireland/expert_insights/managing-operational-change-for-electrification-projects/)

![UK electric train from above overhead wires. It is autumn and the foliage around the tracks is orange and brown.](https://www.systra.com/ireland/wp-content/uploads/sites/24/2025/04/featured-image-managing-operational-change-for-electrification-projects-1024x645.png)

- Expert Insights

Charlotte KAUL

### Managing operational change for electrification projects

[ Read more ](https://www.systra.com/ireland/expert_insights/managing-operational-change-for-electrification-projects/)

[Join our community](https://www.systra.com/ireland/register/join-our-community/)