title: Bardon Quarry Level Crossing Upgrade
url: "https://www.systra.com/ireland/project/bardon-quarry-level-crossing-upgrade/"
type: projects
date_published: 2025-10-20
date_modified: 2025-10-20
schema:
  @type: WebPage
language: en-IE
word_count: 883
reading_time: 5 min
canonical: "https://www.systra.com/ireland/project/bardon-quarry-level-crossing-upgrade/"
featured_image: "https://www.systra.com/ireland/wp-content/uploads/sites/24/2025/10/bardon-quarry-level-crossing.jpg"
type-market:
  - Transport
---

# Bardon Quarry Level Crossing Upgrade

### Quarry redevelopment requires NEW modern level crossing

Aggregate Industries was developing its quarry at Bardon in Leicestershire to
create the largest quarry in the UK. As part of this development, it needed to
upgrade a level crossing over the A511 near Coalville, where the single-track
railway line serving the quarry crossed the road. The existing crossing over the
two-lane road featured no barriers and only flashing red lights to protect the
public. This meant the railway corridor was not physically sealed off from the
highway as trains passed through.

In conjunction with the quarry developments, the road was due to be widened to
three lanes, providing a dedicated right-hand turn into the quarry to ease
traffic flows. This meant a significant upgrade to the level crossing was
required to ensure the safety of all road users and to meet the standards set by
the Office of Rail and Road (ORR).

Aggregate Industries did not have the necessary level crossing expertise
in-house and appointed SYSTRA to design all aspects of the upgraded crossing.
The entire level crossing consultation, design, build and commissioning had to
be completed within 18 months, to ensure the crossing was ready for the opening
of the new quarry.

![bardon-quarry-level-crossing](https://www.systra.com/uk/wp-content/uploads/sites/11/2023/06/bardon-quarry-level-crossing.jpg)

### Collaboration creates bespoke level crossing solution

One of the principal reasons for appointing SYSTRA to the project was the
company’s multi-disciplinary expertise – covering all specialisms involved in
level crossing design and delivery.

Our project engineer liaised with the client and the ORR to understand the
requirements and timescales. To achieve the challenging deadlines for
completion, SYSTRA followed a proven Network Rail design process, but with a
streamlined approach to ensure we delivered a lean yet safe design package on
schedule.

The design solution we proposed was a manually initiated Traincrew Operated
Barrier level crossing. The operation of the level crossing was assessed from
first principles, considering the human interaction with the control equipment,
to provide a bespoke solution appropriate for Aggregate Industries as the level
crossing owner, operator and maintainer. SYSTRA was able to draw on its
excellent working relationship with the ORR to keep the department engaged and
informed throughout the design process. This enabled us to develop acceptable
design proposals, refine our proposed crossing control methods and ultimately
gain acceptance from the ORR for the final proposals.

![](https://www.systra.com/uk/wp-content/uploads/sites/11/2024/09/bardon-cross-section1.png)

Our level crossing design team also worked in partnership with Aggregate
Industries and the ORR to gain buy-in from key stakeholders, such as the local
council, throughout the design phase. This involved working with the highway
designers, signalling designers and other third parties to share information and
design knowledge so the construction and commissioning could be completed as
seamlessly as possible.

To minimise the risk of disruption during the construction phase, SYSTRA
recommended that observation pits were first excavated at the site of the
proposed foundations, to identify any obstructions. This ultimately proved a
valuable intervention, as services and buried obstructions were found that had
not been identified by ground penetrating RADAR surveys. This allowed the
proposed foundations and equipment layout to be refined, prior to the main
installation – avoiding unforeseen disruption during construction.

### Multi-disciplinary teams deliver detailed plans on schedule

Completing all aspects of this level crossing scheme involved specialists from
across SYSTRA. In addition to the Level Crossings team, we deployed experts from
our Civil Engineering, Track, Electrical & Plant (E&P), Geotechnical, Site
Services, Project Management and Project Engineering teams.

Overall, we completed three phases of pre-construction work:

- Assessing level crossing options to determine the optimum level crossing
  protection method and producing an Initial Ground Plan, which was used for
  early consultation with the ORR and other stakeholders.
- Developing the Ground Plan into an Approval In Principle (AIP) design, using a
  streamlined design process and formal consultation with the ORR.
- Progressing the AIP design into an ‘Approved for Construction’ (AFC) package
  to be used by Contractors to construct the crossing with ongoing formal
  consultation with the ORR.

![](https://www.systra.com/uk/wp-content/uploads/sites/11/2024/09/bardon-quarry-level-crossing-2-768x1024.jpg)

![](https://www.systra.com/uk/wp-content/uploads/sites/11/2024/09/bardon-quarry-level-crossing-3-768x1024.jpg)

### Modern, safer level crossing facilitates quarry expansion

Our wide-ranging expertise and collaborative approach enabled us to complete the
level crossing Ground Plan and all associated deliverables within the
constrained project timescale. Our designs fulfilled all Client expectations and
enabled the level crossing to be commissioned on schedule – in time for the new
quarry opening.

The result is a much-improved and far safer level crossing for road users and
pedestrians on the busy A511. The new crossing has barriers to seal off the
railway corridor when trains are passing, as well as modern LED traffic lights
and a filter lane to reduce traffic delays when HGVs turn into the quarry. The
improved level crossing enabled Aggregate Industries to develop the new quarry
in line with its aspirations, bringing with it associated employment and
economic benefits to the local community.