Key features of the project
This project constitutes two corridor from East-West Corridor of Total Length 20.7km including 18 Stations where Elevated section is of 14.3 Km and Underground section of 6.4 Km and includes 1 Depot & North-South Corridor of Total Length 18.5 km including 15 Stations which consist of elevated section of complete 18.5 Km and includes 1 Depot.
The total length of project is approx. 40 km where approx. 6.5 Km of stretch was inaugurated, and complete stretch commissioned within August. The project constitutes an Open Web Girder Over Sabarmati Railway Yard in Ahmedabad Metro and Balance Cantilever Construction at Ahmedabad Metro.