title: "Mumbai Metro Line &#8211; 3"
url: "https://www.systra.com/india/project/mumbai-metro-line-3/"
type: projects
date_published: 2022-11-14
date_modified: 2026-02-28
schema:
  @type: WebPage
language: en-US
word_count: 202
reading_time: 2 min
canonical: "https://www.systra.com/india/project/mumbai-metro-line-3/"
featured_image: "https://www.systra.com/india/wp-content/uploads/sites/8/2022/10/mumbai-metro-features-photo.jpg"
type-market:
  - Infra
type-service:
  - Design and Engineering
type-solution:
  - Infra
---

# Mumbai Metro Line – 3

![Mumbai Metro Line – 3](https://www.systra.com/india/wp-content/uploads/sites/8/2022/10/mumbai-metro-features-photo.jpg)

**Mumbai Metro Line 3 project is the first underground metro line in Mumbai. The Aqua Line 3 of the Mumbai Metro, also known as Colaba-Bandra-Seepz Line, is a part of the metro system under construction in Mumbai, India. When completed, the 33.5km long line will be the first underground metro line in Mumbai and will be operated by MMRDC.**

The metro line will connect Cuffe Parade business district in the extreme south
of the city to SEEPZ in the north-central with 26 underground and 1 at-grade
station. The 33.5 km long corridor will provide connectivity to the six business
hubs, 30 educational institutes, 30 recreational facilities and domestic as well
 as international airport terminals. 

## Key features of the project

SYSTRA is involved in the detailed design in Package UGC-01.UGC-01 which is one
of the 7 packages being awarded for full Mumbai Metro Line-3 which extends from 
Colaba to Seepz area. This package covers 4 stations namely Cuffe Parade, Vidhan
 Bhavan, Churchgate and Hutatma Chowk and associated tunnels. ​

Three stations are purely cut, and cover stations and Hutatma Chowk has one
tunnel to be constructed using NATM techniques. Underground construction was
carried out at an average depth of 15 to 25 meters. Total 4 TBMs were deployed
for tunnelling activity. 