title: KANPUR METRO DDC PROJECT CORRIDOR 1 (KNPDD 01)​
url: "https://www.systra.com/india/project/kanpur-metro-ddc-project-corridor-1-knpdd-01/"
type: projects
date_published: 2022-11-14
date_modified: 2026-02-28
schema:
  @type: WebPage
language: en-US
word_count: 288
reading_time: 2 min
canonical: "https://www.systra.com/india/project/kanpur-metro-ddc-project-corridor-1-knpdd-01/"
featured_image: "https://www.systra.com/india/wp-content/uploads/sites/8/2022/10/kanpur.jpg"
type-market:
  - Infra
type-service:
  - "Consulting &amp; Advisory services"
  - Design and Engineering
type-solution:
  - Infra
---

# KANPUR METRO DDC PROJECT CORRIDOR 1 (KNPDD 01)​

![KANPUR METRO DDC PROJECT CORRIDOR 1 (KNPDD 01)​](https://www.systra.com/india/wp-content/uploads/sites/8/2022/10/kanpur.jpg)

**The Kanpur Metro Corridor 1 Project is a 23.78 km line (15.164 km Elevated and 8.621 km Underground) and will connect IIT Kanpur to Naubasta via 14 elevated stations, 7 underground stations, and a Car Maintenance Depot at Polytechnic. Uttar Pradesh Metro Rail Corporation Limited (UPMRCL) has awarded SYSTRA the project’s Detailed Design Consultancy work.​**

The Kanpur Metro Rail project aims to produce a fast, reliable, convenient,
efficient, modern, and cost-effective means of public transportation that is
well integrated with other modes (multi modal integration). Kanpur is centrally
located, well-connected, and one of the oldest industrial towns in North India.​
The detailed design consultant for this section is in charge of the design of
the Architectural, Civil, Structural, and Building Services Works for elevated
stations, underground stations, and depots, as well as the proof checking of the
Civil and Structural Works for underground stations.​The first phase of the
Corridor 1 (9-km elevated section with 9 elevated stations, and a car
maintenance depot) was successfully commissioned for revenue service on December
28, 2021 which was inaugurated by Prime Minister Narendra Modi.

## Key features of the project

- Record Time completion of construction and design work for the first phase of
  the Corridor 1 in 32 months
- Use of SYSTRA’s innovative U-shaped viaduct to speed up the construction and
  design time of the project
- Use of prefabricated beams & caissons which were designed by SYSTRA and
  standardized design methodology for the ease of construction which ultimately
  speeds up the project life cycle
- Design of compacted and value engineered station layouts to optimize the cost
  of the project
- Specialized design of long span U-Girder

![image-24](https://www.systra.com/india/wp-content/uploads/sites/8/2022/11/image-24.png)

![image25](https://www.systra.com/india/wp-content/uploads/sites/8/2022/11/image25.jpeg)