title: "CONSTRUCTION OF EXTRADOSED PSC BRIDGE OVER RIVER BRAHMAPUTRA CONNECTING GUWAHATI &amp; NORTH GUWAHATI INCLUDING VIADUCT &amp; APPROACHES,  ON EPC MODE"
url: "https://www.systra.com/india/project/construction-of-extradosed-psc-bridge-over-river-brahmaputra-connecting-guwahati-north-guwahati-including-viaduct-approaches-on-epc-mode/"
type: projects
date_published: 2022-11-16
date_modified: 2026-03-01
schema:
  @type: WebPage
language: en-US
word_count: 246
reading_time: 2 min
canonical: "https://www.systra.com/india/project/construction-of-extradosed-psc-bridge-over-river-brahmaputra-connecting-guwahati-north-guwahati-including-viaduct-approaches-on-epc-mode/"
featured_image: "https://www.systra.com/india/wp-content/uploads/sites/8/2022/11/1-1.png"
type-market:
  - PMC
type-service:
  - Project Management  
type-solution:
  - PMC
---

# CONSTRUCTION OF EXTRADOSED PSC BRIDGE OVER RIVER BRAHMAPUTRA CONNECTING GUWAHATI & NORTH GUWAHATI INCLUDING VIADUCT & APPROACHES,  ON EPC MODE

![CONSTRUCTION OF EXTRADOSED PSC BRIDGE OVER RIVER BRAHMAPUTRA CONNECTING GUWAHATI & NORTH GUWAHATI INCLUDING VIADUCT & APPROACHES,  ON EPC MODE](https://www.systra.com/india/wp-content/uploads/sites/8/2022/11/1-1.png)

**The objective of this Highway Project is  to connect North Guwahati with Guwahati City by constructing an Extradosed bridge over river Brahmaputra. This reduces travelling time by 2 hours and aims for the better Economic prospects of North Guwahati. It involves Construction of Extradosed PSC Bridge Over River Brahmaputra connecting Guwahati and North Guwahati. Furthermore, it includes Viaduct and Approaches, etc. on EPC Mode.**

For the relief of high traffic congestion, growth of the Guwahati Metropolitan
Area and expansion of the city to the North Bank and facilitate easy movement of
the traffic, the Government of Assam has embarked on an ambitious plan on the
construction of the transport infrastructure of the city. Thereby, connectivity
of North Guwahati with Guwahati city by constructing an Extradosed bridge along
with Approach roads has been finalized.

- Expansion of the Guwahati city to the North Bank and facilitate easy movement
  of the traffic​
- Better Economic prospects of North Guwahati region​
- Growth/Expansion of Guwahati Metropolitan region

## Key features of the project

SYSTRA is appointed as an Authority Engineer by PWD of Assam and following are
the key project activities:

- As Authority Engineer, we are responsible for review of design and day to day
  supervision of the project
- Total Proposed Bridge Length – Flyover (1339.62m), Ramps (2X360m=720m), Main
  Bridge (1240m), Viaduct (800m) and Highways (4452.54m)​
- Total Project Cost is 2187 Crores Indian Rupees i.e., around 273 million Euros
   ​
- BRICS New Development Bank (NDB) shall be 80% as external assistance and 20%
  as State contribution