title: "Appointment of IE for ATS- Bhadla, Rajasthan"
url: "https://www.systra.com/india/project/appointment-of-ie-for-ats-bhadla-rajasthan/"
type: projects
date_published: 2026-02-28
date_modified: 2026-06-05
schema:
  @type: WebPage
language: en-US
word_count: 244
reading_time: 2 min
canonical: "https://www.systra.com/india/project/appointment-of-ie-for-ats-bhadla-rajasthan/"
type-market:
  - System
type-service:
  - Systems 
type-solution:
  - System
---

# Appointment of IE for ATS- Bhadla, Rajasthan

**SYSTRA India (through Systra MVA Consulting India Pvt Ltd) is proud to have been appointed by CTUIL as the Independent Engineer for the critical Additional Transmission System (ATS) project. This engagement supports the evacuation of renewable energy from Bhadla-III Pooling Station as part of the Rajasthan REZ Phase-III Scheme (20 GW).**

**Leveraging our proven expertise in high-voltage transmission systems and independent engineering across India, we are delivering impartial technical oversight, quality assurance, and project supervision to ensure seamless integration of large-scale solar power into the national grid.**

The scope includes:

- Design review and approval of all substation elements
- Construction supervision and quality monitoring
- Interface coordination with the Transmission Service Provider (TSP)
- Testing, commissioning support, and final certification
- Ensuring full compliance with CEA, CTUIL, and grid standards for reliable
  renewable energy evacuation

## Key features of the project

- Independent engineering oversight for the 765/400 kV AIS substation
  specifically designed for evacuating massive renewable power from the
  Bhadla-III RE complex
- Systematic and compliant development of transmission infrastructure to
  eliminate bottlenecks in renewable energy evacuation
- Optimum utilisation of high-voltage technology for efficient, low-loss power
  transfer from Rajasthan’s solar-rich region
- Creation of robust grid infrastructure that supports large-scale RE
  integration while maintaining system stability and reliability
- Focused support for national green energy goals, enabling evacuation of up to
  20 GW under the Rajasthan REZ Phase-III Scheme
- Enhanced environmental sustainability through reliable transmission of clean
  solar power to load centres across India