---
title: Kochi Metro Authority shows its confidence in SYSTRA for Detailed Design for Phase-II Electrification works
url: "https://www.systra.com/india/news/kochi-metro-authority-shows-its-confidence-in-systra-for-detailed-design-for-phase-ii-electrification-works/"
type: post
date_published: 2023-06-22
date_modified: 2023-06-22
schema:
  @type: Article
language: en-US
word_count: 106
reading_time: 1 min
canonical: "https://www.systra.com/india/news/kochi-metro-authority-shows-its-confidence-in-systra-for-detailed-design-for-phase-ii-electrification-works/"
featured_image: "https://www.systra.com/india/wp-content/uploads/sites/8/2023/06/picture3.png"
categories:
  - Non classé
---

# Kochi Metro Authority shows its confidence in SYSTRA for Detailed Design for Phase-II Electrification works

![Kochi Metro Authority shows its confidence in SYSTRA for Detailed Design for Phase-II Electrification works](https://www.systra.com/india/wp-content/uploads/sites/8/2023/06/picture3.png)

The awarded scope of work includes Detailed Design for the Power Supply and
Distribution System, 750 V DC Third Rail Traction Electrification, and SCADA
Systems. Kochi Metro Phase II,  a.k.a. Pink Line, is proposed to be 11.2 Km long
with 11 stations, starting with the existing JLN Stadium in the centre of the
city, Ernakulam up to Infopark/ Smart City station, the largest IT Hub and
Kakkanad, a major economic and commercial hub.

We are confident of delivering value to the project with our technical
expertise, proven methodology, and understanding of project requirements. This
project will further our credentials of technical capabilities in MRTS and
Railway Systems.

**Categories:** Non classé