---
title: "Itaparica Bridge &#8211; Brazil"
url: "https://www.systra.com/en/projects/itaparica-bridge-brazil/"
type: projects
date_published: 2024-02-06
date_modified: 2024-04-24
schema:
  @type: WebPage
language: en-US
word_count: 431
reading_time: 3 min
canonical: "https://www.systra.com/en/projects/itaparica-bridge-brazil/"
featured_image: "https://www.systra.com/wp-content/uploads/2024/02/20211104-itaparica_2.jpg"
type-market:
  - Large infrastructure
project-market:
  - Tunnels and bridges
  - Bridges and viaducts
project-service:
  - Design
project-location:
  - Brazil
---

# Itaparica Bridge – Brazil

![Itaparica Bridge – Brazil](https://www.systra.com/wp-content/uploads/2024/02/20211104-itaparica_2.jpg)

**The Itaparica cable-stayed bridge linking the city of Salvador to Itaparica Island in Bahia bay in Brazil is a major project. With a total length of 12 .4km it will be the second longest bridge in the country and the longest sea-crossing cable-stayed bridge in Latin America.**

### Facilitating journeys and stimulating the economy

The project is key to the development of Bahia as vehicles will no longer have
to go around the Bay of All Saints, the principal bay in the state. The bridge
greatly reduces the distance between the state capital Salvador and the south of
the state by nearly an hour’s drive and will contribute to creating wealth in
northeast Brazil.

Itaparica bridge is one of several projects being financed in the context of
China’s Belt and Road Initiative. At the end of 2020, a public-private
partnership (PPP) contract was signed between the State of Bahia and a Chinese
consortium comprising China Railway 20th Bureau Group Corp (CR20G) and China
Communications Construction Company (CCCC) for the design, construction,
operation, and maintenance of the bridge.

### Team collaboration across the globe

SYSTRA Brazil, in a consortium with engineering firm Maia Melo, is responsible
for the Project Management Consultancy (PMC) of the Itaparica bridge. To meet
the requirements of the PPP, SYSTRA’s Brazilian teams will work closely with
Bridge Group technical committee members from SYSTRA IBT in the US and SYSTRA
Korea.

In the context of its assignments, the Maia Melo/ SYSTRA consortium will ensure
the works supervision and review of the detailed design, which is being done by
the engineering companies Concremat / Sener for the Chinese private JV.

The PPP contract is for 35 years, including 5 years for the design and
construction. The scope includes the bridge itself and the access points: a
tunnel on the Salvador side, a road network on Itaparica island.

Some examples of projects in Tunnels and bridges, Bridges and viaducts, Design

[  Mwanza Central Station – Tanzania  ](https://www.systra.com/en/projects/mwanza-central-station-tanzania/)
[  The Tunis RFR (Rapid Rail Network) -Tunisia ](https://www.systra.com/en/projects/the-tunis-rfr-rapid-rail-network-tunisia/)
[  Baraje-Rubyiro Suspension Trailbridge – Rwanda ](https://www.systra.com/en/projects/baraje-rubyiro-suspension-trailbridge-rwanda/)
[  High speed line ALTO – Canada ](https://www.systra.com/en/projects/high-speed-line-alto-canada/)
[  The Brenner Base Tunnel – Italy ](https://www.systra.com/en/projects/the-brenner-base-tunnel-italy/)
[  High Speed Rail network KTX – Korea ](https://www.systra.com/en/projects/the-korean-hsr/)

[ See a selection of SYSTRA's projects ](https://www.systra.com/en/our-projects/)