---
title: "Arena Amazonia, Manaus &#8211; Brazil"
url: "https://www.systra.com/en/projects/arena-amazonia-manaus-brazil/"
type: projects
date_published: 2026-08-11
date_modified: 2026-08-11
schema:
  @type: WebPage
language: en-US
word_count: 563
reading_time: 3 min
canonical: "https://www.systra.com/en/projects/arena-amazonia-manaus-brazil/"
featured_image: "https://www.systra.com/wp-content/uploads/2026/08/gettyimages-a-general-view-of-the-stadium-before-a-match-between-brazil-and-colombia-scaled.jpg"
project-market:
  - Buildings
  - "Leisure: Hotels, Retail and Stadia"
project-service:
  - Project Management and Construction
project-location:
  - Brazil
---

# Arena Amazonia, Manaus – Brazil

![Arena Amazonia, Manaus – Brazil](https://www.systra.com/wp-content/uploads/2026/08/gettyimages-a-general-view-of-the-stadium-before-a-match-between-brazil-and-colombia-scaled.jpg)

**Ahead of the 2014 FIFA World Cup, Manaus, capital of the state of Amazonas, developed a new stadium meeting the technical and operational requirements of an international competition. SYSTRA supervised its construction.**

Beyond meeting the technical and operational standards required for a major
international event, the project was also intended to support the long-term
development of the city and the wider region.

## A comprehensive construction supervision assignment

From 2011 to 2014, SYSTRA worked in partnership with Aeroservice Consultoria e
Engenharia de Projeto Ltda., mobilising multidisciplinary teams to deliver this
major project. The assignment covered the entire construction process, from
design review through to on-site inspections and final verification.

The scope included the review and approval of construction design documentation,
oversight of additional works, and checks on the consistency and compliance of
all technical documents. The teams also monitored productivity and construction
performance indicators throughout the works.

## A stadium inspired by its surroundings

Given its scale, complexity and tight delivery schedule, Arena Amazonia
presented major technical challenges. With a total built area of more than
170,000 m², the stadium can accommodate over 43,300 spectators in the stands and
almost 1,000 VIP guests in private hospitality suites.

To address Manaus’s extremely hot and humid climate, the stadium was designed to
maximise spectator comfort. Its white, reflective outer envelope reduces heat
accumulation, while shaded stands and openings in the facade promote natural
ventilation.

The design and construction of the foundations, superstructure and structural
steelwork were central to both the building’s robustness and its architectural
identity. The Arena outer design draws inspiration from the surrounding
rainforest and the region’s traditional woven baskets.

At the same time, integrating the building’s mechanical, electrical and plumbing
(MEP) services — including heating, ventilation and air conditioning (HVAC) —
with the building management system (BMS), fire protection, IT,
telecommunications and audiovisual systems required close multidisciplinary
coordination. Quality control was supported by topographical surveys,
inspections and testing throughout construction.

## Sustainability embedded at every stage

Sustainability considerations were embedded in the design from the outset, in
line with the requirements of the international LEED (Leadership in Energy and
Environmental Design) green building certification system. The ambition,
however, went beyond certification itself: the aim was to deliver an efficient,
high-performing facility that would retain its value beyond the World Cup.

The site has dedicated rainwater harvesting and wastewater treatment systems,
reducing pressure on municipal utilities. In addition, 95% of the materials
generated by the demolition of the former stadium were recovered and reused.

Arena Amazonia was among the first stadiums in the world to achieve LEED
certification from the US Green Building Council.

## Arena Amazonia in images

Some examples of projects in Buildings, Leisure: Hotels, Retail and Stadia,
Project Management and Construction

[  Taranto station multimodal interchange -Italy ](https://www.systra.com/en/projects/taranto-station-multimodal-interchange-italy/)
[  SBIOA Unity Enclave – Chennai, India ](https://www.systra.com/en/projects/sbioa-unity-enclave-chennai-india/)
[  Orly Airport Station – France ](https://www.systra.com/en/projects/orly-airport-station-france/)
[  Line 15 South Stations (Grand Paris Express) – France ](https://www.systra.com/en/projects/line-15-south-stations-grand-paris-express-france/)
[  T1 tram maintenance depot in Montreuil – France ](https://www.systra.com/en/projects/t1-tram-maintenance-depot-in-montreuil-france/)
[  Belo Horizonte International Airport – Brazil ](https://www.systra.com/en/projects/belo-horizonte-international-airport-brazil/)

[ See a selection of SYSTRA's projects ](https://www.systra.com/en/our-projects/)