title: "Obsolescence model for the chilean railway network &#8211; Chile"
url: "https://www.systra.com/en/project/obsolescence-model-for-the-chilean-railway-network-chile/"
type: projects
date_published: 2022-05-19
date_modified: 2022-05-20
schema:
  @type: WebPage
language: en-US
word_count: 343
reading_time: 2 min
canonical: "https://www.systra.com/en/project/obsolescence-model-for-the-chilean-railway-network-chile/"
featured_image: "https://www.systra.com/wp-content/uploads/2022/05/bandeua_ferro_chili-scaled.jpg"
type-market:
  - Rail
project-market:
  - Rail
  - Conventional Rail
project-service:
  - Planning and Consultancy
project-location:
  - Chile
---

# Obsolescence model for the chilean railway network – Chile

![Obsolescence model for the chilean railway network – Chile](https://www.systra.com/wp-content/uploads/2022/05/bandeua_ferro_chili-scaled.jpg)

**In 2018, EFE (Empresa de los Ferrocarriles del Estado), Chile’s state-owned railway company, entrusted SYSTRA with a major assignment: to carry out an obsolescence study, develop risk simulation software and propose an investment plan.**

The Chilean railway network consists of 2,100km of track from north to south, of
which 700km is electrified. It carries almost 40 million passengers per year.
Obsolescence has led to an increase in the number of unplanned events that have
paralysed the rail network.

SYSTRA was the technical leader of the project in collaboration with the Chilean
engineering company POCH which was in charge of the contract. The project
covered the entire Chilean network and encompassed all railway disciplines.

SYSTRA’s teams created a comprehensive register of railway assets and carried
out a field audit to ensure the reliability of the data and an assessment of the
condition of the assets. As part of the assignment, the following items were
examined:

- the track
- systems (power supply, catenary, signalling, telecommunications, level
  crossings and central control)
- infrastructure (small structures, bridges, tunnels, stations, and workshops)
- rolling stock

As a result of this work, an obsolescence model was created and a railway risk
analysis was carried out, making it possible to propose a customised investment
plan for the Chilean public railway operator.

Some examples of projects in Rail, Conventional Rail, Planning and Consultancy

[  Łódź Fabryczna railway station – Poland  ](https://www.systra.com/en/projects/lodz-fabryczna-railway-station-poland/)
[  Mwanza Central Station – Tanzania  ](https://www.systra.com/en/projects/mwanza-central-station-tanzania/)
[  Road Collision Analysis – United Kingdom ](https://www.systra.com/en/projects/road-collision-analysis-united-kingdom/)
[  The Tunis RFR (Rapid Rail Network) -Tunisia ](https://www.systra.com/en/projects/the-tunis-rfr-rapid-rail-network-tunisia/)
[  Tanta-El Mansoura-Damietta railway line – Egypt ](https://www.systra.com/en/projects/tanta-mansoura-damietta-railway-line-egypt/)
[  Technical expertise and programme management for BusConnects – Ireland ](https://www.systra.com/en/projects/technical-expertise-and-programme-management-for-busconnects-ireland/)

[ See a selection of SYSTRA's projects ](https://www.systra.com/en/our-projects/)