---
title: "Chacao bridge &#8211; Chile"
url: "https://www.systra.com/en/project/chacao-bridge/"
type: projects
date_published: 2022-12-01
date_modified: 2024-04-24
schema:
  @type: WebPage
language: en-US
word_count: 384
reading_time: 2 min
canonical: "https://www.systra.com/en/project/chacao-bridge/"
featured_image: "https://www.systra.com/wp-content/uploads/2021/12/chacao-bridge-scaled.jpg"
type-market:
  - Large infrastructure
project-market:
  - Tunnels and bridges
  - Bridges and viaducts
project-service:
  - Design
  - Project Management and Construction
project-location:
  - Chile
---

# Chacao bridge – Chile

![Chacao bridge – Chile](https://www.systra.com/wp-content/uploads/2021/12/chacao-bridge-scaled.jpg)

**The Chacao suspension bridge, which connects Chiloé Island with mainland Chile by crossing the Chacao Channel, is the longest suspension bridge in Latin America. This project was launched by the Chilean Ministry of Public Works to boost the economic development of the area by facilitating access to the island.**

## The bridge

The Chacao bridge is the world’s longest double suspension bridge with three
pylons.

The bridge is located near an active fault, and it is designed to resist severe
seismic motion.

## Our mission

SYSTRA, along with JV Partner, AAS-Jakobsen, was responsible for the full
detailed design of the bridge. SYSTRA led the seismic studies and design,
geotechnical engineering, and the design of the steel orthotropic deck, central
pylon, suspension cable anchor blocks, and foundations.

The key technical challenges on this project are associated with the geometry of
the bridge with two main spans and with the design under the seismic loads and
the wind loads. Among others the contract included the determination of basic
engineering data such as seismic and wind input data. One of the main challenges
was to reach agreement on the design methodology for the concrete pylon under
seismic loads as this type of bridge is not covered by the AASHTO code.

## Project key figures

- Total Bridge Length: 2,754m
- Main Bridge Length: 2,494m for 4 traffic lanes
- Main Spans: 1,155m and 1,055m
- Width: 23.8m
- 2,634m steel deck (main span and approach sections) for 4 traffic lanes
  - 3 Concrete pylons of more than 120m in height: 157m, 175m and 200m on deep
    foundations

## The project in pictures

Some examples of projects in Tunnels and bridges, Bridges and viaducts, Design,
Project Management and Construction

[  Mwanza Central Station – Tanzania  ](https://www.systra.com/en/projects/mwanza-central-station-tanzania/)
[  The Tunis RFR (Rapid Rail Network) -Tunisia ](https://www.systra.com/en/projects/the-tunis-rfr-rapid-rail-network-tunisia/)
[  Alexandria Raml Tramway – Egypt ](https://www.systra.com/en/projects/alexandria-raml-tramway-egypt/)
[  Tanta-El Mansoura-Damietta railway line – Egypt ](https://www.systra.com/en/projects/tanta-mansoura-damietta-railway-line-egypt/)
[  Bari BRT network – Italy ](https://www.systra.com/en/projects/bari-brt-network-italy/)
[  Baraje-Rubyiro Suspension Trailbridge – Rwanda ](https://www.systra.com/en/projects/baraje-rubyiro-suspension-trailbridge-rwanda/)

[ See a selection of SYSTRA's projects ](https://www.systra.com/en/our-projects/)