---
title: "SYSTRA accompanies the creation of a metro line in Santiago, Chile"
url: "https://www.systra.com/en/news/systra-accompanies-the-creation-of-a-metro-line-in-santiago-chile/"
type: post
date_published: 2024-06-24
date_modified: 2024-09-12
schema:
  @type: Article
language: en-US
word_count: 304
reading_time: 2 min
canonical: "https://www.systra.com/en/news/systra-accompanies-the-creation-of-a-metro-line-in-santiago-chile/"
featured_image: "https://www.systra.com/wp-content/uploads/2024/06/gettyimages-1429930277-1-scaled.jpg"
categories:
  - Non classé
---

# SYSTRA accompanies the creation of a metro line in Santiago, Chile

The project includes advisory services, review, and the preparation of technical
documentation and is scheduled to last 18 months.

Our study will cover
[the rolling stock](https://www.systra.com/en/markets/rolling-stock-depots/),
signalling system, tracks, catenary, platform facades, ventilation systems,
escalators and lifts, and self-service ticketing. All the electrical systems are
included in these studies, from access gates to communication and
video-surveillance systems, including the real-time energy control and
management system (SCADA), as well as RAMS and interface studies.

![herve-laurain-1](https://www.systra.com/wp-content/uploads/2023/09/herve-laurain-1.jpeg)

> Confidence in our teams’ experience and expertise has once again been
> confirmed by our longstanding client Metro S.A. with this latest project for
> the Santiago Metro. We look forward to successfully completing this
> assignment, as well as the other ongoing projects in which we are
> participating on other lines of the network.
> Hervé Laurain, Hispanic America Cluster Director, Design & Build and
> International

![Inside the subway](https://www.systra.com/wp-content/uploads/2024/06/gettyimages-1429930277-1-scaled.jpg)

_Example of a driverless train at a station on line 3_

### SYSTRA and the Santiago Metro: a long and successful collaboration

SYSTRA was involved from the very start of the Santiago Metro network. Since
automating line 1, and then lines 3 and 6 between 2017 and 2019, the Group has
been awarded several big projects on this network involving teams from SYSTRA
Chile and SYSTRA Subterra such as:

- preliminary studies for the northern extension of lines 1, 8 and 9
- the audit for the renewal of the systems on lines 2, 4, 4A and 5
- other recently completed projects include:
  - extension of line 3
  - systems studies for the extension of line 6
  - design studies and construction supervision for line 7, in addition to
    studies for the rail systems and in-station equipment for line 7

[OUR SOLUTIONS: URBAN MOBILITIES](https://www.systra.com/en/type-market/urban-mobilities/)

**Categories:** Non classé