---
title: Systems integration
url: "https://www.systra.com/en/markets/systems-integration/"
type: markets
date_published: 2024-02-21
date_modified: 2026-06-22
schema:
  @type: WebPage
language: en-US
word_count: 914
reading_time: 5 min
canonical: "https://www.systra.com/en/markets/systems-integration/"
featured_image: "https://www.systra.com/wp-content/uploads/2024/01/integration-des-systemes-scaled.jpg"
type-market:
  - Systems engineering
  - Ingénierie des systèmes
---

# Systems integration

![Systems integration](https://www.systra.com/wp-content/uploads/2024/01/integration-des-systemes-scaled.jpg)

## A UNIQUE UNDERSTANDING AND METHODOLOGY FOR COMPLEX SYSTEMS

**With over 65 years’ experience of mobility projects worldwide, we have developed a unique understanding and methodology for integrating complex transport systems. SYSTRA has in-depth knowledge of each of the subsystems and interfaces that make up an overall transport system.**

By analysing how subsystems interact with each other, we are able to quickly
identify any potential problems that could impact the system, from the design
phases through to integration, testing and commissioning.

This ensures that the system meets specifications after assembly and minimises
subsequent rework that could impact cost and schedule.

## A SERVICE OFFER AT EACH STAGE OF YOUR PROJECT

![](https://www.systra.com/wp-content/uploads/2024/02/bd_krestrm_011-682x1024.jpg)

Deploying new transport systems requires advanced technical skills, as well as
the ability to collaborate and negotiate with a large number of stakeholders.

By starting the systems integration phase at the very beginning of your project,
you can reduce technical risks and better control costs and deadlines.

SYSTRA supervises and ensures the complete integration of systems at every stage
of the project, from design to testing and commissioning. At the start of the
project, we define the functional, performance, safety, operating and
maintenance objectives for all the systems. Once this stage has been completed,
we duplicate the technical performance requirements for the system as a whole
and for each of the subsystems.

This set of requirements forms the basis of our approach to systems integration.
At every stage of a project, we ensure that the original requirements are met,
and that any changes are fully assessed in terms of compliance, cost and
schedule.

One of the major stages is the testing and commissioning phase. Our team of
dedicated experts take charge of planning, directing and steering all the test
procedures, taking into account:

- Definition of activities from static factory tests, their sequencing and the
  associated schedule;
- Supervision and control of the testing and commissioning phases up to client
  acceptance, as well as preparation for the launch of commercial operation by
  testing all systems (e.g. assessing the test environment, stakeholder
  requirements, safety).

## THEY HAVE CONFIDENCE IN US

The projects we lead are always the fruit of close collaboration between our
teams, our clients, and our partners. And it is they who speak most highly of
them.

![danske_statsbaner_logo2014](https://www.systra.com/wp-content/uploads/2024/01/danske_statsbaner_logo2014.png)

> « SYSTRA has shown worldwide that it is able to find very simple solutions to
> very complex problems »
> **Jesper Andersen**, Vice-President, DSB (Dänische Staatsbahnen).

## DID YOU KNOW?

SYSTRA has designed a comprehensive database that compiles thousands of
requirements and prerequisites, covering the functional, performance, safety,
operational and maintenance technical aspects that engineers may need to use on
your projects.

## Our achievements in images

- ![Dubai Metro – United Arab Emirates](https://www.systra.com/wp-content/uploads/2020/07/13-dubai-474x474.jpg)
- [ Dubai Metro – United Arab Emirates ](https://www.systra.com/en/project/dubai-metro-united-arab-emirates/)
- ![Grand Paris Express (Lines 15, 16, 17 and 18) – France](https://www.systra.com/wp-content/uploads/2020/06/header_grand_paris-express-474x474.jpg)
- [ Grand Paris Express (Lines 15, 16, 17 and 18) – France ](https://www.systra.com/en/project/grand-paris-express-lines-15-16-17-and-18/)
- ![Paris-Bordeaux High Speed line – France](https://www.systra.com/wp-content/uploads/2020/06/lgv_paris_bordeaux-1-474x474.jpg)
- [ Paris-Bordeaux High Speed line – France ](https://www.systra.com/en/project/paris-bordeaux-high-speed-line/)

[Discover all our projects](https://www.systra.com/en/group/our-projects/)

![visuel-brochures-marches-webfactory-4](https://www.systra.com/wp-content/uploads/2024/01/visuel-brochures-marches-webfactory-4-1024x683.png)

### See our systems INTEGRATION brochure

To address the challenges in a diverse and complex environment, you must think
globally. Taking a holistic approach to transport systems is key to providing a
robust, competitive and innovative solution, accounting for all present and
future issues.

[Download](https://www.systra.com/wp-content/uploads/2023/11/systra-system-integration.pdf)

![systems-group-brochure](https://www.systra.com/wp-content/uploads/2024/02/systems-group-brochure-1024x786.png)

### See our systems brochure

Managing complex systems is at the heart of all we do and we are passionate
about delivering attractive and sustainable transport for generations to come.

SYSTRA has been a world leader in the field of transportation infrastructure for
60 years. Systems are a cornerstone of our technical excellence in providing
safe,efficient, and cost effective solutions.

[Download](https://www.systra.com/wp-content/uploads/2024/05/brochure-systems-group-systra-2024.pdf)

## Check our other markets

[
![Digital Solutions](https://www.systra.com/wp-content/uploads/2021/01/20191010-train-autonome.jpg)

### Digital Solutions

[
![Healthcare](https://www.systra.com/wp-content/uploads/2026/04/header_sante_marche.jpg)

### Healthcare

[
![Stations](https://www.systra.com/wp-content/uploads/2023/09/uk-mep-project-edited.jpg)

### Stations

[
![Tall Buildings](https://www.systra.com/wp-content/uploads/2026/04/quay-quarter-tower-amp-tower-australia-1-scaled.jpg)

### Tall Buildings

[
![Transportation depot facilities and operation control centres](https://www.systra.com/wp-content/uploads/2023/09/xiamen-depot-gaoqi-depot-china.jpg)

### Transportation depot facilities and operation control centres

[
![Transportation technical buildings](https://www.systra.com/wp-content/uploads/2023/09/header-maroc-lgv.jpg)

### Transportation technical buildings

[
![Rolling Stock & Depots](https://www.systra.com/wp-content/uploads/2024/01/2024-materiel-roulant-et-ateliers-scaled.jpg)

### Rolling Stock & Depots

[
![Micro mobilities & Cycle](https://www.systra.com/wp-content/uploads/2023/09/anz-man-riding-to-work.png)

### Micro mobilities & Cycle

[
![Light Rail](https://www.systra.com/wp-content/uploads/2023/09/tramway-header-1.png)

### Light Rail

[
![Tunnels & underground structures](https://www.systra.com/wp-content/uploads/2023/08/page-62-tunnel-telt-scaled.jpg)

### Tunnels & underground structures