The Tianxingzhou cable stayed bridge

The Tianxingzhou cable stayed bridge

In 2004, SYSTRA was appointed to assist the contracting authority on the construction of the cable stayed Tianxingzhou Bridge in China.

The double-decked Tianxingzhou Bridge was designed to handle the fast growing demand for cross-river traffic. The bridge is located over the fork of Tianxingzhou, 9.5 km north of the second bridge over the Yangtze River at Wuhan.

SYSTRA was responsible for:
-  Reviewing the detailed designs for the:

  • Permanent structures;
  • Construction methods and temporary structures;
  • Construction programme.

-  Scheduling and coordinating civil engineering studies;

-  Supervising construction work:

  • Reviewing contractors’ documents;
  • Reviewing materials;
  • Site inspection;
  • Management of building supervision

-  Assisting with acceptance procedures for the completed works.