Greater Cairo Metro, Lines 1, 2 and 3

Greater Cairo Metro, Lines 1, 2 and 3

SYSTRA has worked on 20 contracts for the National Authority for Tunnels (NAT) since 1970, ranging from design through to preparation and analysis of tender documents, works supervision, operation and maintenance for Lines 1, 2 and 3 of the Greater Cairo Metro.

SYSTRA’s tasks on Line 1 involved:

  • Works supervision;
  • Tender preparation and supervision of maintenance during the guarantee period;
  • Overseeing the manufacture of rolling stock;
  • Assistance with operation and maintenance.

SYSTRA was also responsible for producing the feasibility study, basic design and preparing tender documents for both phases of Line 2.

SYSTRA’s recent contracts for Line 3 include project management and works supervision for construction phases 1 and 2, preparing basic designs and tender documents for phases 3 and 4 of Line 3.

On construction supervision contracts, SYSTRA was responsible for:

  • Management;
  • Supervision of the schedule;
  • Co-ordinating the activities of the various groups;
  • Works supervision;
  • Commissioning.