SYSTRA was awarded a consultancy contract by Delhi Metro Rail Corporation Ltd. to inspect construction designs for Line 7 of the Delhi metro.

Most of the work related to the Phase III expansion. Once commercial operations start in 2016, the line will transport 3.9 million passengers a day, rising to 4.8 million a day by 2021 and 6.5 million by 2031.

Line 7 runs from Mukundpur to Yamuna Vihar, a total of 58 km, 41 km of which are on elevated tracks and 17 km are underground. It connects to many other lines and comprises 38 stations, 26 of which are elevated and 12 underground. Work on Line 7 was started in August 2011.

Phase III of the Delhi metro includes the construction of a 136 km line and 90 stations, 55 of which are elevated and 35 underground.

SYSTRA’s role

SYSTRA reviewed:

  • Civil engineering designs
  • Architectural designs
  • Line 7 construction designs

SYSTRA was more specifically in charge of:

  • Checking route designs
  • Producing architectural designs and proposing alternative designs for the 38 stations
  • Tender support
  • Simulating underground environments to compute and analyse fluid dynamics for the 12 underground stations
  • Inspecting structural designs.
Top of the page

Read also

China – Shanghai Metro – Line 16
China – Shanghai Metro – Line 16
Shanghai Shentong Group, the Shanghai Metro Authority commissioned SYSTRA (...)
Malaysia – Kuala-Lumpur LRT3
Malaysia – Kuala-Lumpur LRT3
SYSTRA won the contract to produce preliminary designs for the third LRT (...)
Bangalore Metro – Line 3
Bangalore Metro – Line 3
SYSTRA India was designated project manager of Line 3 by BMRC (Bangalore (...)
Upgrading Sydney’s suburban and intercity rail network signalling systems
Upgrading Sydney’s suburban and intercity rail network signalling systems
In association with Scott Lister, SYSTRA won the Technical Advisory (...)
Shanghai Metro – Line 11 – Disney Extension
Shanghai Metro – Line 11 – Disney Extension
SYSTRA produced the designs for the standard viaduct structure for the Line (...)
Taipei-Neihu Line
Taipei-Neihu Line
In 1999, SYSTRA was appointed as consultant for the construction of (...)
Jakarta Railway Network
Jakarta Railway Network
SYSTRA won the contract to renovate and modernise three lines: Serpong, (...)
Modernisation of the Hanoi-Vinh Line
Modernisation of the Hanoi-Vinh Line
On 8th July 1999, SYSTRA was awarded a consultancy contract for the (...)
Manila Metro/LRT – Line LRT 1
Manila Metro/LRT – Line LRT 1
In 2004, the Joint Venture managed by SYSTRA was awarded the maintenance (...)
Suzhou Metro – Line 1
Suzhou Metro – Line 1
In 2003, SYSTRA was appointed technical consultant responsible for designs (...)
Mumbai Metro – Line 1
Mumbai Metro – Line 1
SYSTRA was commissioned to project manage the construction of Line 1 of the (...)
Manila Light Metro – Line MRT 3
Manila Light Metro – Line MRT 3
In 1994, SYSTRA won a contract to manage the project to build Line MRT3 of (...)
SYSTRA 72, rue Henry Farman 75015 Paris - France - T. +33 1 40 16 61 00
Contact