{"id":7043,"date":"2024-04-15T22:21:42","date_gmt":"2024-04-15T20:21:42","guid":{"rendered":"https:\/\/www.systra.com\/canada\/?post_type=expert_insights&#038;p=7043"},"modified":"2024-05-03T22:43:59","modified_gmt":"2024-05-03T20:43:59","slug":"constructability-a-pivotal-asset-to-project-management","status":"publish","type":"expert_insights","link":"https:\/\/www.systra.com\/canada\/expert_insights\/constructability-a-pivotal-asset-to-project-management\/","title":{"rendered":"Constructability: A Pivotal Asset to Project Management"},"content":{"rendered":"\n<p class=\"has-dusty-blue-color has-text-color\"><strong>Constructability stands as a <strong>fundamental instrument<\/strong> in effective project management. A constructability leader must embody a comprehensive skill set and demonstrate extensive experience in the field, ensuring proficient execution of construction projects.<\/strong><\/p>\n\n\n\n<div style=\"height:50px\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n\n\n\n<h4 class=\"wp-block-heading\" id=\"h-definition-wikipedia\">DEFINITION (WIKIPEDIA)<\/h4>\n\n\n\n<div style=\"height:25px\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n\n\n\n<p>\u201cConstructability (or buildability) is a concept that denotes ease of construction. It can be central to project management techniques to review construction processes from start to finish during pre-construction phase. Buildability assessment is employed to <strong>identify obstacles before a project is actually built<\/strong> to reduce or prevent errors, delays, and cost overruns.\u201d<\/p>\n\n\n\n<div style=\"height:100px\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n\n\n\n<div class=\"wp-block-group alignwide has-dusty-blue-background-color has-background\"><div class=\"wp-block-group__inner-container is-layout-constrained wp-block-group-is-layout-constrained\">\n<div style=\"height:75px\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n\n\n\n<h3 class=\"wp-block-heading has-text-align-center has-blanc-color has-text-color\">SYSTRA: PIONEERING CONSTRUCTABILITY SOLUTIONS IN TRANSPORTATION<\/h3>\n\n\n\n<div style=\"height:75px\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n\n\n\n<p class=\"has-blanc-color has-text-color has-link-color wp-elements-7a421c1efa6d68f013a577c2ad97ac2e\">At SYSTRA, transportation is our passion and expertise. With a global team exceeding 10,000 specialists, we are recognized as the leading experts in Canada&#8217;s transportation sector. Our dedicated divisions focus on underground construction, tunnels, and stations, successfully expanding stations while ensuring smooth transport operations. Leveraging our collective experience, we excel in constructability studies and reviews, offering insights for project success.<\/p>\n\n\n\n<div style=\"height:30px\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n\n\n\n<h4 class=\"wp-block-heading has-blanc-color has-text-color has-link-color wp-elements-15bf5f8761e024e751e2ea9e811c4295\" id=\"h-our-experience\">Our Experience<\/h4>\n\n\n\n<div style=\"height:30px\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n\n\n\n<p class=\"has-blanc-color has-text-color has-link-color wp-elements-df271aea2776c22552fdf38c84b5011e\">SYSTRA brings a wealth of experience across construction knowledge, planning, design, and field operations. <strong>Our seasoned teams possess a unique ability to visualize project approaches, designs, and executions.<\/strong> In constructability, this experience is invaluable, guiding us to anticipate challenges and deliver innovative solutions; individuals with substantial experience are essential for visualizing the optimal approach, design, and execution of a project.<\/p>\n\n\n\n<div style=\"height:50px\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n\n\n<div class=\"wp-block-image\">\n<figure class=\"aligncenter size-full is-resized\"><img loading=\"lazy\" decoding=\"async\" width=\"995\" height=\"666\" src=\"https:\/\/www.systra.com\/canada\/wp-content\/uploads\/sites\/15\/2024\/04\/systra-workers.png\" alt=\"\" class=\"wp-image-7069\" style=\"width:754px;height:auto\" srcset=\"https:\/\/www.systra.com\/canada\/wp-content\/uploads\/sites\/15\/2024\/04\/systra-workers.png 995w, https:\/\/www.systra.com\/canada\/wp-content\/uploads\/sites\/15\/2024\/04\/systra-workers-300x201.png 300w, https:\/\/www.systra.com\/canada\/wp-content\/uploads\/sites\/15\/2024\/04\/systra-workers-768x514.png 768w, https:\/\/www.systra.com\/canada\/wp-content\/uploads\/sites\/15\/2024\/04\/systra-workers-375x250.png 375w, https:\/\/www.systra.com\/canada\/wp-content\/uploads\/sites\/15\/2024\/04\/systra-workers-474x317.png 474w, https:\/\/www.systra.com\/canada\/wp-content\/uploads\/sites\/15\/2024\/04\/systra-workers-75x50.png 75w, https:\/\/www.systra.com\/canada\/wp-content\/uploads\/sites\/15\/2024\/04\/systra-workers-800x535.png 800w, https:\/\/www.systra.com\/canada\/wp-content\/uploads\/sites\/15\/2024\/04\/systra-workers-180x120.png 180w, https:\/\/www.systra.com\/canada\/wp-content\/uploads\/sites\/15\/2024\/04\/systra-workers-153x102.png 153w, https:\/\/www.systra.com\/canada\/wp-content\/uploads\/sites\/15\/2024\/04\/systra-workers-230x154.png 230w\" sizes=\"auto, (max-width: 995px) 100vw, 995px\" \/><\/figure>\n<\/div>\n\n\n<div style=\"height:75px\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n<\/div><\/div>\n\n\n\n<div class=\"wp-block-group alignwide is-style-default has-pale-blue-background-color has-background\"><div class=\"wp-block-group__inner-container is-layout-constrained wp-block-group-is-layout-constrained\">\n<div style=\"height:75px;width:0px\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n\n\n\n<h3 class=\"wp-block-heading has-text-align-center has-dusty-blue-color has-text-color\" id=\"h-inherent-factors-in-constructability-considerations\">INHERENT FACTORS&nbsp; IN CONSTRUCTABILITY: CONSIDERATIONS<\/h3>\n\n\n\n<div style=\"height:75px;width:0px\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n\n\n\n<p class=\"has-noir-color has-text-color\">Inherent factors in constructability are pivotal considerations that significantly impact project success:<\/p>\n\n\n\n<div style=\"height:10px\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n\n\n\n<p><strong>Construction knowledge and methodology<\/strong>, encompassing scheduling, sequencing, and site planning.<\/p>\n\n\n\n<div style=\"height:10px\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n\n\n\n<p><strong>Accessibility<\/strong>, necessitating the minimization of road blockages and optimization of materials deliveries and exits.<\/p>\n\n\n\n<div style=\"height:10px\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n\n\n\n<p><strong>Innovation<\/strong> as a driver of progress, fostering the adoption of cutting-edge practices.<\/p>\n\n\n\n<div style=\"height:10px\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n\n\n\n<p><strong>Effective team skills<\/strong> for seamless collaboration among stakeholders, enhancing project efficiency.<\/p>\n\n\n\n<div style=\"height:10px\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n\n\n\n<p><strong>Environmental consciousness<\/strong> guiding decisions towards building practices that enhance efficiency, reduce energy consumption, and minimize waste generation.<\/p>\n\n\n\n<div style=\"height:10px\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n\n\n\n<p><strong>Proactive risk management<\/strong> involving early visualization and mitigation of potential hazards, endorsing the adoption of less risky concepts to safeguard project integrity.<\/p>\n\n\n\n<div style=\"height:50px\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n\n\n<div class=\"wp-block-image\">\n<figure class=\"aligncenter size-full is-resized\"><img loading=\"lazy\" decoding=\"async\" width=\"995\" height=\"666\" src=\"https:\/\/www.systra.com\/canada\/wp-content\/uploads\/sites\/15\/2024\/04\/rem-mcgill_avancement-2022-03.jpg\" alt=\"\" class=\"wp-image-7053\" style=\"aspect-ratio:1.7777777777777777;object-fit:cover;width:754px;height:auto\" srcset=\"https:\/\/www.systra.com\/canada\/wp-content\/uploads\/sites\/15\/2024\/04\/rem-mcgill_avancement-2022-03.jpg 995w, https:\/\/www.systra.com\/canada\/wp-content\/uploads\/sites\/15\/2024\/04\/rem-mcgill_avancement-2022-03-300x201.jpg 300w, https:\/\/www.systra.com\/canada\/wp-content\/uploads\/sites\/15\/2024\/04\/rem-mcgill_avancement-2022-03-768x514.jpg 768w, https:\/\/www.systra.com\/canada\/wp-content\/uploads\/sites\/15\/2024\/04\/rem-mcgill_avancement-2022-03-375x250.jpg 375w, https:\/\/www.systra.com\/canada\/wp-content\/uploads\/sites\/15\/2024\/04\/rem-mcgill_avancement-2022-03-474x317.jpg 474w, https:\/\/www.systra.com\/canada\/wp-content\/uploads\/sites\/15\/2024\/04\/rem-mcgill_avancement-2022-03-75x50.jpg 75w, https:\/\/www.systra.com\/canada\/wp-content\/uploads\/sites\/15\/2024\/04\/rem-mcgill_avancement-2022-03-800x535.jpg 800w, https:\/\/www.systra.com\/canada\/wp-content\/uploads\/sites\/15\/2024\/04\/rem-mcgill_avancement-2022-03-180x120.jpg 180w, https:\/\/www.systra.com\/canada\/wp-content\/uploads\/sites\/15\/2024\/04\/rem-mcgill_avancement-2022-03-153x102.jpg 153w, https:\/\/www.systra.com\/canada\/wp-content\/uploads\/sites\/15\/2024\/04\/rem-mcgill_avancement-2022-03-230x154.jpg 230w\" sizes=\"auto, (max-width: 995px) 100vw, 995px\" \/><figcaption class=\"wp-element-caption\">Credit: REM &#8211; McGill Station under construction (2022)<\/figcaption><\/figure>\n<\/div>\n\n\n<div style=\"height:75px;width:0px\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n<\/div><\/div>\n\n\n\n<div style=\"height:100px\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n\n\n\n<div class=\"wp-block-group alignwide is-style-default has-dusty-blue-background-color has-background\"><div class=\"wp-block-group__inner-container is-layout-constrained wp-block-group-is-layout-constrained\">\n<div style=\"height:75px;width:0px\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n\n\n\n<h3 class=\"wp-block-heading has-text-align-center has-blanc-color has-text-color\" id=\"h-maximizing-project-potential-the-power-of-early-constructability-reviews\">MAXIMIZING PROJECT POTENTIAL:<br>THE POWER OF EARLY CONSTRUCTABILITY REVIEWS<\/h3>\n\n\n\n<div style=\"height:75px;width:0px\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n\n\n\n<p class=\"has-blanc-color has-text-color has-link-color wp-elements-9202f61ae8225ce5c41a34012fd1ed20\">Undertaking a constructability review during the <strong>initial phases<\/strong> of a project plays a pivotal role in assisting decision-makers in selecting the most advantageous options. This proactive measure not only helps in the <strong>early detection and resolution of potential issues<\/strong> but also prevents them from escalating into significant challenges. By strategically optimizing spaces, such reviews can effectively reduce expropriation surfaces and mitigate traffic disruptions, thereby <strong>enhancing overall project efficiency and public satisfaction<\/strong>.<\/p>\n\n\n\n<div style=\"height:30px\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n\n\n\n<p class=\"has-blanc-color has-text-color has-link-color wp-elements-5f025ea42effe7056204491019def6fd\">The insights garnered from constructability reviews are invaluable for planners, enabling them to <strong>anticipate construction methods and associated risks<\/strong>. This foresight facilitates more effective scheduling and phasing processes, ultimately leading to smoother project execution and improved resource allocation. Moreover, by minimizing errors and subsequent corrections, constructability reviews contribute to a <strong>reduced environmental footprint<\/strong>, promoting sustainability in construction practices.<\/p>\n\n\n\n<div style=\"height:30px\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n\n\n\n<p class=\"has-blanc-color has-text-color has-link-color wp-elements-6ae8fa5074c80fbea2eb3e9d0e255918\">Additionally, the early identification of potential problems through constructability assessments allows for <strong>better risk assessment<\/strong> during the design phase, enhancing project resilience and <strong>reducing the likelihood of costly delays or setbacks<\/strong>. Moreover, by emphasizing constructability, safety risks can be minimized, ensuring a <strong>safer working environment<\/strong> for all project stakeholders.<\/p>\n\n\n\n<div style=\"height:50px;width:0px\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n\n\n<div class=\"wp-block-image\">\n<figure class=\"aligncenter size-full is-resized\"><img loading=\"lazy\" decoding=\"async\" width=\"995\" height=\"666\" src=\"https:\/\/www.systra.com\/canada\/wp-content\/uploads\/sites\/15\/2024\/04\/rem_mcgill_2021-05.png\" alt=\"\" class=\"wp-image-7051\" style=\"object-fit:cover;width:756px;height:auto\" srcset=\"https:\/\/www.systra.com\/canada\/wp-content\/uploads\/sites\/15\/2024\/04\/rem_mcgill_2021-05.png 995w, https:\/\/www.systra.com\/canada\/wp-content\/uploads\/sites\/15\/2024\/04\/rem_mcgill_2021-05-300x201.png 300w, https:\/\/www.systra.com\/canada\/wp-content\/uploads\/sites\/15\/2024\/04\/rem_mcgill_2021-05-768x514.png 768w, https:\/\/www.systra.com\/canada\/wp-content\/uploads\/sites\/15\/2024\/04\/rem_mcgill_2021-05-375x250.png 375w, https:\/\/www.systra.com\/canada\/wp-content\/uploads\/sites\/15\/2024\/04\/rem_mcgill_2021-05-474x317.png 474w, https:\/\/www.systra.com\/canada\/wp-content\/uploads\/sites\/15\/2024\/04\/rem_mcgill_2021-05-75x50.png 75w, https:\/\/www.systra.com\/canada\/wp-content\/uploads\/sites\/15\/2024\/04\/rem_mcgill_2021-05-800x535.png 800w, https:\/\/www.systra.com\/canada\/wp-content\/uploads\/sites\/15\/2024\/04\/rem_mcgill_2021-05-180x120.png 180w, https:\/\/www.systra.com\/canada\/wp-content\/uploads\/sites\/15\/2024\/04\/rem_mcgill_2021-05-153x102.png 153w, https:\/\/www.systra.com\/canada\/wp-content\/uploads\/sites\/15\/2024\/04\/rem_mcgill_2021-05-230x154.png 230w\" sizes=\"auto, (max-width: 995px) 100vw, 995px\" \/><figcaption class=\"wp-element-caption\">Credit: REM &#8211; McGill Station under construction (2021)<\/figcaption><\/figure>\n<\/div>\n\n\n<div style=\"height:75px;width:0px\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n<\/div><\/div>\n\n\n\n<div style=\"height:100px\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n\n\n\n<figure class=\"wp-block-image alignfull size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"374\" src=\"https:\/\/www.systra.com\/canada\/wp-content\/uploads\/sites\/15\/2024\/04\/travaux_pont-samuel-de_champlain_fevrier-2022_large-1024x374.png\" alt=\"\" class=\"wp-image-7070\" srcset=\"https:\/\/www.systra.com\/canada\/wp-content\/uploads\/sites\/15\/2024\/04\/travaux_pont-samuel-de_champlain_fevrier-2022_large-1024x374.png 1024w, https:\/\/www.systra.com\/canada\/wp-content\/uploads\/sites\/15\/2024\/04\/travaux_pont-samuel-de_champlain_fevrier-2022_large-300x110.png 300w, https:\/\/www.systra.com\/canada\/wp-content\/uploads\/sites\/15\/2024\/04\/travaux_pont-samuel-de_champlain_fevrier-2022_large-768x281.png 768w, https:\/\/www.systra.com\/canada\/wp-content\/uploads\/sites\/15\/2024\/04\/travaux_pont-samuel-de_champlain_fevrier-2022_large-474x173.png 474w, https:\/\/www.systra.com\/canada\/wp-content\/uploads\/sites\/15\/2024\/04\/travaux_pont-samuel-de_champlain_fevrier-2022_large-1352x494.png 1352w, https:\/\/www.systra.com\/canada\/wp-content\/uploads\/sites\/15\/2024\/04\/travaux_pont-samuel-de_champlain_fevrier-2022_large-800x292.png 800w, https:\/\/www.systra.com\/canada\/wp-content\/uploads\/sites\/15\/2024\/04\/travaux_pont-samuel-de_champlain_fevrier-2022_large-180x66.png 180w, https:\/\/www.systra.com\/canada\/wp-content\/uploads\/sites\/15\/2024\/04\/travaux_pont-samuel-de_champlain_fevrier-2022_large-153x56.png 153w, https:\/\/www.systra.com\/canada\/wp-content\/uploads\/sites\/15\/2024\/04\/travaux_pont-samuel-de_champlain_fevrier-2022_large-230x84.png 230w, https:\/\/www.systra.com\/canada\/wp-content\/uploads\/sites\/15\/2024\/04\/travaux_pont-samuel-de_champlain_fevrier-2022_large.png 1500w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><figcaption class=\"wp-element-caption\">Credit: REM &#8211; Samuel De Champlain Bridge (2022)<\/figcaption><\/figure>\n\n\n\n<div style=\"height:100px\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n\n\n\n<div class=\"wp-block-group alignwide has-noir-color has-pale-blue-background-color has-text-color has-background\"><div class=\"wp-block-group__inner-container is-layout-constrained wp-block-group-is-layout-constrained\">\n<div style=\"height:75px\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n\n\n\n<h3 class=\"wp-block-heading has-text-align-center has-dusty-blue-color has-text-color\">CONSTRUCTABILITY AT EACH STAGE OF THE PROJECT<\/h3>\n\n\n\n<div style=\"height:40px\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n\n\n\n<p><strong>Feasibility studies:<\/strong> In the initial stages of feasibility studies, our focus is on anticipating potential issues and developing proactive approaches to prevent, navigate, or efficiently resolve them.<\/p>\n\n\n\n<div style=\"height:30px\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n\n\n\n<p><strong>Preliminary engineering:<\/strong> In the early phases of the engineering process, we apply principles of constructability to enhance &#8220;Safety by Design&#8221; practices. This involves influencing the design process by considering factors such as planning, potential construction methods, and the selection of materials. Additionally, we conduct thorough assessments of local construction expertise to determine the feasibility of incorporating customary methods and actively engage with Value Engineering to optimize project outcomes.<\/p>\n\n\n\n<div style=\"height:30px\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n\n\n\n<p><strong>Detailed design:<\/strong> In the detailed design phase, we thoroughly analyze various aspects of work area planning, including deliveries, crane operations, hoarding areas, and loads on existing structures, as well as potential interactions with neighboring structures, utilities, tunnels, and other factors. Furthermore, we collaborate with value engineering to optimize both functionality and costs, while also evaluating procurement timelines&#8217; impacts on the project schedule. We also assess the trade-offs between construction speed and expenditures engage with planners to address any clashes between construction activities and project schedules.<\/p>\n\n\n\n<div style=\"height:30px\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n\n\n\n<p><strong>Construction:<\/strong> Throughout the construction phase, we conduct thorough reviews of the contractor&#8217;s schedule in relation to the progress of construction activities. Simultaneously, we examine possibilities for environmental optimization to ensure sustainable practices are implemented.<\/p>\n\n\n\n<div style=\"height:50px\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n\n\n<div class=\"wp-block-image\">\n<figure class=\"aligncenter size-full is-resized\"><img loading=\"lazy\" decoding=\"async\" width=\"995\" height=\"666\" src=\"https:\/\/www.systra.com\/canada\/wp-content\/uploads\/sites\/15\/2024\/04\/rem_mcgill_2021-07.jpg\" alt=\"\" class=\"wp-image-7052\" style=\"width:754px;height:auto\" srcset=\"https:\/\/www.systra.com\/canada\/wp-content\/uploads\/sites\/15\/2024\/04\/rem_mcgill_2021-07.jpg 995w, https:\/\/www.systra.com\/canada\/wp-content\/uploads\/sites\/15\/2024\/04\/rem_mcgill_2021-07-300x201.jpg 300w, https:\/\/www.systra.com\/canada\/wp-content\/uploads\/sites\/15\/2024\/04\/rem_mcgill_2021-07-768x514.jpg 768w, https:\/\/www.systra.com\/canada\/wp-content\/uploads\/sites\/15\/2024\/04\/rem_mcgill_2021-07-375x250.jpg 375w, https:\/\/www.systra.com\/canada\/wp-content\/uploads\/sites\/15\/2024\/04\/rem_mcgill_2021-07-474x317.jpg 474w, https:\/\/www.systra.com\/canada\/wp-content\/uploads\/sites\/15\/2024\/04\/rem_mcgill_2021-07-75x50.jpg 75w, https:\/\/www.systra.com\/canada\/wp-content\/uploads\/sites\/15\/2024\/04\/rem_mcgill_2021-07-800x535.jpg 800w, https:\/\/www.systra.com\/canada\/wp-content\/uploads\/sites\/15\/2024\/04\/rem_mcgill_2021-07-180x120.jpg 180w, https:\/\/www.systra.com\/canada\/wp-content\/uploads\/sites\/15\/2024\/04\/rem_mcgill_2021-07-153x102.jpg 153w, https:\/\/www.systra.com\/canada\/wp-content\/uploads\/sites\/15\/2024\/04\/rem_mcgill_2021-07-230x154.jpg 230w\" sizes=\"auto, (max-width: 995px) 100vw, 995px\" \/><figcaption class=\"wp-element-caption\">Credit: REM &#8211; McGill Station Under Construction (2021)<\/figcaption><\/figure>\n<\/div>\n\n\n<div style=\"height:60px\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n<\/div><\/div>\n\n\n\n<div style=\"height:100px\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n\n\n\n<h3 class=\"wp-block-heading has-dusty-blue-color has-text-color has-link-color wp-elements-36ac3eb9b3236e662266db714208d989\" id=\"h-streamlining-construction-excellence-integrated-constructability-reviews\">STREAMLINING CONSTRUCTION EXCELLENCE:<br>INTEGRATED CONSTRUCTABILITY REVIEWS<\/h3>\n\n\n\n<div class=\"wp-block-media-text has-media-on-the-right is-stacked-on-mobile has-blanc-background-color has-background\" style=\"grid-template-columns:auto 55%\"><div class=\"wp-block-media-text__content\">\n<div style=\"height:30px\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n\n\n\n<p>Processes will encompass constructability reviews at every stage, ensuring that all stakeholders consider constructability:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li><strong>Conducting constructability reviews<\/strong> during project planning to anticipate risks, identify scheduling bottlenecks, and address integration issues.<\/li>\n\n\n\n<li><strong>Integrating constructability reviews<\/strong> into design processes to assess constraints and incorporate them into planning, phasing, and procurement, thereby enhancing ease of construction within the design.<\/li>\n\n\n\n<li><strong>Implementing constructability reviews<\/strong> to optimize planning and waste management strategies.<\/li>\n<\/ul>\n<\/div><figure class=\"wp-block-media-text__media\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"646\" src=\"https:\/\/www.systra.com\/canada\/wp-content\/uploads\/sites\/15\/2024\/04\/constructability-diagram-1024x646.png\" alt=\"\" class=\"wp-image-7046 size-full\" srcset=\"https:\/\/www.systra.com\/canada\/wp-content\/uploads\/sites\/15\/2024\/04\/constructability-diagram-1024x646.png 1024w, https:\/\/www.systra.com\/canada\/wp-content\/uploads\/sites\/15\/2024\/04\/constructability-diagram-300x189.png 300w, https:\/\/www.systra.com\/canada\/wp-content\/uploads\/sites\/15\/2024\/04\/constructability-diagram-768x485.png 768w, https:\/\/www.systra.com\/canada\/wp-content\/uploads\/sites\/15\/2024\/04\/constructability-diagram-1536x969.png 1536w, https:\/\/www.systra.com\/canada\/wp-content\/uploads\/sites\/15\/2024\/04\/constructability-diagram-2048x1292.png 2048w, https:\/\/www.systra.com\/canada\/wp-content\/uploads\/sites\/15\/2024\/04\/constructability-diagram-474x299.png 474w, https:\/\/www.systra.com\/canada\/wp-content\/uploads\/sites\/15\/2024\/04\/constructability-diagram-1700x1073.png 1700w, https:\/\/www.systra.com\/canada\/wp-content\/uploads\/sites\/15\/2024\/04\/constructability-diagram-1352x853.png 1352w, https:\/\/www.systra.com\/canada\/wp-content\/uploads\/sites\/15\/2024\/04\/constructability-diagram-800x505.png 800w, https:\/\/www.systra.com\/canada\/wp-content\/uploads\/sites\/15\/2024\/04\/constructability-diagram-180x114.png 180w, https:\/\/www.systra.com\/canada\/wp-content\/uploads\/sites\/15\/2024\/04\/constructability-diagram-153x97.png 153w, https:\/\/www.systra.com\/canada\/wp-content\/uploads\/sites\/15\/2024\/04\/constructability-diagram-230x145.png 230w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><\/figure><\/div>\n\n\n\n<div style=\"height:100px\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n\n\n\n<div class=\"wp-block-group is-style-default has-dirty-purple-background-color has-background\"><div class=\"wp-block-group__inner-container is-layout-constrained wp-block-group-is-layout-constrained\">\n<div style=\"height:50px;width:0px\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n\n\n\n<h3 class=\"wp-block-heading has-text-align-left has-griplusclair-color has-text-color\">MASTERING CONSTRUCTABILITY: KEY TO PROJECT SUCCESS<\/h3>\n\n\n\n<div style=\"height:30px;width:0px\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n\n\n\n<p class=\"has-griplusclair-color has-text-color\">In summary, constructability involves the efficient and timely construction of projects while maintaining adherence to initial requirements. It stands as a critical component of project management.<\/p>\n\n\n\n<div style=\"height:30px\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n\n\n\n<p class=\"has-griplusclair-color has-text-color\">Multidisciplinary experts must <strong>visualize the project comprehensively<\/strong>, much like elite athletes, in order to ensure<strong> seamless coordination<\/strong> throughout all project stages. Their involvement spans from inception to completion.<\/p>\n\n\n\n<div style=\"height:50px;width:0px\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n<\/div><\/div>\n\n\n\n<div style=\"height:80px\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n","protected":false},"featured_media":7050,"template":"","type-insight":[391],"class_list":["post-7043","expert_insights","type-expert_insights","status-publish","has-post-thumbnail","hentry","type-insight-constructability"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v27.4 (Yoast SEO v27.4) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>Constructability: A Pivotal Asset to Project Management - SYSTRA Canada<\/title>\n<meta name=\"description\" content=\"SYSTRA Canada, consulting and engineering firm, world leader in public transport infrastructure engineering.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<meta property=\"og:locale\" content=\"fr_FR\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Constructability: A Pivotal Asset to Project Management\" \/>\n<meta property=\"og:description\" content=\"SYSTRA Canada, consulting and engineering firm, world leader in public transport infrastructure engineering.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.systra.com\/canada\/expert_insights\/constructability-a-pivotal-asset-to-project-management\/\" \/>\n<meta property=\"og:site_name\" content=\"Canada\" \/>\n<meta property=\"article:modified_time\" content=\"2024-05-03T20:43:59+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/www.systra.com\/canada\/wp-content\/uploads\/sites\/15\/2024\/04\/rem-mcgill_tunnel_mai-2022.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"995\" \/>\n\t<meta property=\"og:image:height\" content=\"1327\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Dur\u00e9e de lecture estim\u00e9e\" \/>\n\t<meta name=\"twitter:data1\" content=\"6 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.systra.com\\\/canada\\\/expert_insights\\\/constructability-a-pivotal-asset-to-project-management\\\/\",\"url\":\"https:\\\/\\\/www.systra.com\\\/canada\\\/expert_insights\\\/constructability-a-pivotal-asset-to-project-management\\\/\",\"name\":\"Constructability: A Pivotal Asset to Project Management - SYSTRA Canada\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.systra.com\\\/canada\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/www.systra.com\\\/canada\\\/expert_insights\\\/constructability-a-pivotal-asset-to-project-management\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/www.systra.com\\\/canada\\\/expert_insights\\\/constructability-a-pivotal-asset-to-project-management\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/www.systra.com\\\/canada\\\/wp-content\\\/uploads\\\/sites\\\/15\\\/2024\\\/04\\\/rem-mcgill_tunnel_mai-2022.jpg\",\"datePublished\":\"2024-04-15T20:21:42+00:00\",\"dateModified\":\"2024-05-03T20:43:59+00:00\",\"description\":\"SYSTRA Canada, consulting and engineering firm, world leader in public transport infrastructure engineering.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.systra.com\\\/canada\\\/expert_insights\\\/constructability-a-pivotal-asset-to-project-management\\\/#breadcrumb\"},\"inLanguage\":\"fr-FR\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/www.systra.com\\\/canada\\\/expert_insights\\\/constructability-a-pivotal-asset-to-project-management\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"fr-FR\",\"@id\":\"https:\\\/\\\/www.systra.com\\\/canada\\\/expert_insights\\\/constructability-a-pivotal-asset-to-project-management\\\/#primaryimage\",\"url\":\"https:\\\/\\\/www.systra.com\\\/canada\\\/wp-content\\\/uploads\\\/sites\\\/15\\\/2024\\\/04\\\/rem-mcgill_tunnel_mai-2022.jpg\",\"contentUrl\":\"https:\\\/\\\/www.systra.com\\\/canada\\\/wp-content\\\/uploads\\\/sites\\\/15\\\/2024\\\/04\\\/rem-mcgill_tunnel_mai-2022.jpg\",\"width\":995,\"height\":1327},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.systra.com\\\/canada\\\/expert_insights\\\/constructability-a-pivotal-asset-to-project-management\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Accueil\",\"item\":\"https:\\\/\\\/www.systra.com\\\/canada\\\/fr\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Expert Insight\",\"item\":\"https:\\\/\\\/www.systra.com\\\/canada\\\/fr\\\/news\\\/expert_insights\\\/\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"Constructability: A Pivotal Asset to Project Management\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.systra.com\\\/canada\\\/#website\",\"url\":\"https:\\\/\\\/www.systra.com\\\/canada\\\/\",\"name\":\"Canada\",\"description\":\"Un site utilisant Les sites de Systra\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/www.systra.com\\\/canada\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"fr-FR\"}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"Constructability: A Pivotal Asset to Project Management - SYSTRA Canada","description":"SYSTRA Canada, consulting and engineering firm, world leader in public transport infrastructure engineering.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"og_locale":"fr_FR","og_type":"article","og_title":"Constructability: A Pivotal Asset to Project Management","og_description":"SYSTRA Canada, consulting and engineering firm, world leader in public transport infrastructure engineering.","og_url":"https:\/\/www.systra.com\/canada\/expert_insights\/constructability-a-pivotal-asset-to-project-management\/","og_site_name":"Canada","article_modified_time":"2024-05-03T20:43:59+00:00","og_image":[{"width":995,"height":1327,"url":"https:\/\/www.systra.com\/canada\/wp-content\/uploads\/sites\/15\/2024\/04\/rem-mcgill_tunnel_mai-2022.jpg","type":"image\/jpeg"}],"twitter_card":"summary_large_image","twitter_misc":{"Dur\u00e9e de lecture estim\u00e9e":"6 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/www.systra.com\/canada\/expert_insights\/constructability-a-pivotal-asset-to-project-management\/","url":"https:\/\/www.systra.com\/canada\/expert_insights\/constructability-a-pivotal-asset-to-project-management\/","name":"Constructability: A Pivotal Asset to Project Management - SYSTRA Canada","isPartOf":{"@id":"https:\/\/www.systra.com\/canada\/#website"},"primaryImageOfPage":{"@id":"https:\/\/www.systra.com\/canada\/expert_insights\/constructability-a-pivotal-asset-to-project-management\/#primaryimage"},"image":{"@id":"https:\/\/www.systra.com\/canada\/expert_insights\/constructability-a-pivotal-asset-to-project-management\/#primaryimage"},"thumbnailUrl":"https:\/\/www.systra.com\/canada\/wp-content\/uploads\/sites\/15\/2024\/04\/rem-mcgill_tunnel_mai-2022.jpg","datePublished":"2024-04-15T20:21:42+00:00","dateModified":"2024-05-03T20:43:59+00:00","description":"SYSTRA Canada, consulting and engineering firm, world leader in public transport infrastructure engineering.","breadcrumb":{"@id":"https:\/\/www.systra.com\/canada\/expert_insights\/constructability-a-pivotal-asset-to-project-management\/#breadcrumb"},"inLanguage":"fr-FR","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.systra.com\/canada\/expert_insights\/constructability-a-pivotal-asset-to-project-management\/"]}]},{"@type":"ImageObject","inLanguage":"fr-FR","@id":"https:\/\/www.systra.com\/canada\/expert_insights\/constructability-a-pivotal-asset-to-project-management\/#primaryimage","url":"https:\/\/www.systra.com\/canada\/wp-content\/uploads\/sites\/15\/2024\/04\/rem-mcgill_tunnel_mai-2022.jpg","contentUrl":"https:\/\/www.systra.com\/canada\/wp-content\/uploads\/sites\/15\/2024\/04\/rem-mcgill_tunnel_mai-2022.jpg","width":995,"height":1327},{"@type":"BreadcrumbList","@id":"https:\/\/www.systra.com\/canada\/expert_insights\/constructability-a-pivotal-asset-to-project-management\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Accueil","item":"https:\/\/www.systra.com\/canada\/fr\/"},{"@type":"ListItem","position":2,"name":"Expert Insight","item":"https:\/\/www.systra.com\/canada\/fr\/news\/expert_insights\/"},{"@type":"ListItem","position":3,"name":"Constructability: A Pivotal Asset to Project Management"}]},{"@type":"WebSite","@id":"https:\/\/www.systra.com\/canada\/#website","url":"https:\/\/www.systra.com\/canada\/","name":"Canada","description":"Un site utilisant Les sites de Systra","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.systra.com\/canada\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"fr-FR"}]}},"lang":"en","translations":{"en":7043,"fr":7071},"pll_sync_post":[],"_links":{"self":[{"href":"https:\/\/www.systra.com\/canada\/wp-json\/wp\/v2\/expert_insights\/7043","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.systra.com\/canada\/wp-json\/wp\/v2\/expert_insights"}],"about":[{"href":"https:\/\/www.systra.com\/canada\/wp-json\/wp\/v2\/types\/expert_insights"}],"version-history":[{"count":0,"href":"https:\/\/www.systra.com\/canada\/wp-json\/wp\/v2\/expert_insights\/7043\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.systra.com\/canada\/wp-json\/wp\/v2\/media\/7050"}],"wp:attachment":[{"href":"https:\/\/www.systra.com\/canada\/wp-json\/wp\/v2\/media?parent=7043"}],"wp:term":[{"taxonomy":"type-insight","embeddable":true,"href":"https:\/\/www.systra.com\/canada\/wp-json\/wp\/v2\/type-insight?post=7043"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}