LOCATION |
PROJECTS |
SERVICES |
COMPLETION YEAR |
| Argentina |
Buenos Aires subway network development |
Feasibility study of a priority line |
1997 |
| |
Rosario public transport system |
Planning studies |
1998 |
| Brazil |
Rio-Sao Paulo-Campinas high speed line |
Preliminary studies |
1987 |
| Canada |
Montreal-Toronto high speed line |
Preliminary studies
Ridership forecasts and economic profitability studies |
1994 |
| Chile |
Railway system rehabilitation |
Consulting and implementation assistance |
1995 |
|
Santiago subway line 5 |
Civil works detailed design and technical assistance for the overall
project coordination
Equipment design, manufacturing, installation and commissioning |
1998 |
| Mexico |
Mexico-Queretaro railway line electrification |
Design and construction management |
1994 |
|
Mexico City subway line B |
Assistance in electromechanical engineering |
1999 |
| U.S.A. |
New York subway |
Rolling stock factory inspection |
1989 |
| |
Dallas-Houston-San Antonio high speed line (Texas) |
Participation in the concession project (BOT)
Engineering consultancy |
1993 |
|
Miami-Tampa-Orlando (Florida) |
Participation in concession projects (BOT)
Engineering consultancy |
2003 |
| Venezuela |
Caracas subway line 3 |
Monitoring of equipment detailed design, manufacturing, installation and
commissioning |
1994 |
| |
Maracaibo public transportation system |
Assistance in designing and implementing an improvement program |
1998 |