Section 1 (70
km) of Channel Tunnel Rail Link was inaugurated on September 16.
From September 28, Eurostars will save 20 minutes on the travelling
time between London and Paris, or Brussels. The 109 km Channel Tunnel
Rail Link is the first new line to be built in Great Britain for
over a hundred years... and the first high speed line ever.
It will run
from the Channel Tunnel terminal near Folkestone to a new international
station at St Pancras. By 2007, when Section 2 from Southfleet to
St Pancras opens, the travelling time between Paris and London will
be a mere 2 hours and 20 minutes.
SYSTRA is a
founder partner of London & Continental Railways (LCR), the concessionnaire
company, and a member of RLE, the engineering consortium, since
1996. Up to two hundred and fifty SYSTRA engineers and technicians
have been involved in this project, more particularly in design
and construction engineering, the overall supervision of works performance,
design and implementation of the test programme, acceptance and
commissioning, preparation for the maintenance of the new line.
It is noteworthy that this project is being delivered on time and
within budget.
|