The first line of the new tramway in Tours, 15.5 km long and serving 30 stations, will connect the north of Tours to Joué-lès-Tours.
In the same section
This project will require the construction of two major bridges, one to cross the ring road and a second across the river Cher, which is not part of the consortium’s brief. Parts of the line in the centre of the city and in protected areas along the banks of the Loire will be powered without an overhead catenary.
SYSTRA, as led-consortium, manages the project.
Key figures :
- Length : 15.5 km
- Number of stations : 30
Key dates :
- 2009 : start of studies
- June 2010 : start of works
- September 2013 : commissioning of the line