North-South Line in Saudi Arabia

Between 2004 and 2006, a detailed technical study was carried out of the planned north-south rail line, linking the bauxite and phosphate mines to the Persian Gulf coast. From the end of 2005, as part of a consortium, SYSTRA supervised the construction of this 2400km line.

Print E-mail This Page Start Of Page